Riverstone Industries QBJA1025 Installation & Assemebly

Page 1
Mojave Edition
Monticello Solar Ventilation System
Assembly Instructions
041315V
Made in the USA
WA RRAN TY
Customer Service: (877) 373-3078 Email: customerservice@rsiww.com After Hours Helpline: (443) 574-4764
65 Fleetwood Drive, Rockaway, NJ 07866
Page 2
Thank you for choosing the Monticello Greenhouse Program
Thank You for your Purchase
We want to thank you for your purchase of the Monticello Greenhouse. We appreciate your support of our American Made Greenhouses.
The Monticello is designed for the average homeowner; no special degrees are needed. The time to assemble depends on the weather, skills, options, and number of helpers
you have in the process. All the pieces are cut to size and should t snug, BUT if
something is not working please reach out to our help lines so we can make sure that there are no delays in the process. We are not only employees of Riverstone but owners of Monticello Greenhouses and can help you through the process and hopefully keep the frustration levels down if a question comes up.
We would like to take a moment to remind you as the new owner of a Monticello Greenhouse a few things to increase the life of your greenhouse.
• Make sure that all your roof vents are closed and tied down with the included
bungee balls during high winds. This would be a 25 mph gusting wind and up. This will help prevent air getting into the Monticello and causing damage.
• Like with the roof vents, make sure the dual doors stay closed during winds. The
doors are spring loaded to stay closed but we also know that the greenhouse can get rather hot in the warmer months and doors do get propped open. Just make sure that they get closed.
• In cooler snow prone climates, Cut some 2 x 4 ‘s and put them against the roof ridge and the oor to help add support from heavy snow and ice. This is just a
precaution but could save a lot of aggravation down the road.
• It is also a good practice to clean the snow off the roof. A little snow if ne, but
several inches only will tempt fate and it is best to be safe than sorry.
• The polycarbonate panels have channels in them. These are designed to help insulate and in moist environments, like after a rainstorm, you might nd water droplets in these channels. It will not cause any harm and will burn itself off when
the air starts to heat up.
• In some cases where there is a lot of rainfall, like the Pacic North West, we
recommend using clear silicon caulking between the polycarbonate panels and
the trim plates before the trim plates are put on. This is just to assure that the
Monticello stays as dry as possible. Just give a call if you need some more help with this.
Lastly, we are not perfect. We know that there are better ways to do things, we just need some suggestions from our customer base as to what they are. Needless to say we are always open to feedback, good and bad, and we do react to feedback. Please, if there is an option you do not see that you feel would make the greenhouse experience better, if there is a different way to explain a set-up
process, or if there is anything else to help make Monticello better we want to hear from you.
Thank you again for your purchase and we hope you have many years of growing in your new Monticello Greenhouse.
David Schnurman
Vice President
Page 3
List of Parts
24” x 37¼”
WARNING: Profiles with cut edges and/or drilled holes are sharp. Use extreme caution when handling.
The greenhouse is shipped in multiple cartons. These cartons are heavy. Use care when lifting them. Some parts have sharp edges. Use extreme caution when handling. Wear proper safety gear including work shoes, gloves and safety goggles. Keep children and pets away until assembly is complete. Finish assembling the roof in one session. Do not leave the roof unattended until it is completely assembled. Place all like parts together in a staging area. Prepare for each step according to instructions in this manual.
If any parts are missing or damaged, before beginning assembly contact Riverstone Customer Service at (877) 373-3078, email: customerservice@rsiww.com or After Hours Helpline: (443) 574-4764
QTYProfile
23”
F-10 2
W-7 1
41/2x 24”
W-9
1
Connectors QTY
B-2 4
QTYFan Parts
H-1 2
H-2
H-3
H-4 2
H-5 4
H-6 1
2
2
Hardware QTY
S-2C
S-2D
S-5B 4
S-5D 8
S-7 26
S-11 12
26
16
1 of 8
H-7
H-8
H-9
H-10 10’
H-11 8’
WWW.RSIWW.COM
1
1
1
Page 4
F-7
1.1A
B-2
B-2
Place F-10 profile on W-7 panel. Make sure profile fits snugly between F-8 back profile and F-1 wall profile.
F-1
F-10
W-1
W-7
F-8
W-1
1.1B
Secure B-2 with three T-bolt assemblies and one S-2C cap as shown.
1.1c
1.1E
Place another F-10 Profile about 5” from top of F-1 profile.
F-10
W-1
F-8
F-1
W-1
W-7
NOTE: VIEWS FROM INSIDE.
Secure B-2 with three T-bolt assemblies and one S-2C cap as shown.
1.1D
Fit W-9 panel into channel in F-10 profile. Adjust both so panel is snug and lines up with top of W-1 Profiles.
W-1
1.1F
Working from outside, repeat
F-1
W-9
F-10
F-10
W-7
steps 3.4B and 3.4E to install B-2 connectors on F-1 profiles.
F-8
W-1
WWW.RSIWW.COM
2 of 8
41/2x 24”
QTYPanel
W-9 1
B-2
S-2C
S-7
QTYConnectors
4
16
4
Page 5
The two sets of F-6 and F-10 profiles fit on top of W-1 panels. Line up bottom bolt channels with top edge of F-1 and F-7 vertical profiles. Profiles will fit snugly.
1.2A
Working from inside right corner, place F-6 profile with mitered end next to corner and angled edge facing up onto corner W-1 panel. F-6 profile fits snugly between F-7 corner profile and F-8 back profile.
F-6
G-1
F-7
W-1
F-8
1.2B
Continue along back wall. Place first F-10 profile. Align with F-6 profile.
W-1
F-1
F-10
W-9
F-10
F-10
W-7
F-6
W-1
F-8
NOTE: ALL VIEWS FROM INSIDE.
3 of 8
23”
23”
QTYProle
F-6 2
F-10 2
WWW.RSIWW.COM
Page 6
Install Fan and Solar Panel
S-2D S-5B S-11
F-10
H-7
S-2C
S-2C
W-1
Make certain the pieces are in the correct positions before securing. Carefully follow the order of assembly to ensure an easy installation. Wear proper safety gear including work shoes, gloves and goggles.
2.1A
Working from inside, fit H-8 fan over S-11 bolts in F-10 profiles.
S-11
H-8
W-9
F-10
F-10
W-7
NOTE: VIEW FROM INSIDE.
2.1B
S-11
S-11
Connectors QTY
Secure with S-2D nut and S-5B washer.
Side View
Fan QTY
S-2D
S-5B
4 4
H-8 1
2.2A 2.2B
Working from inside install two T-bolts into track, lock into place. Fit H-7 thermostat on T-bolts.
H-7
WWW.RSIWW.COM
NOTE: VIEWS FROM INSIDE.
Connectors QTY
4 of 8
Secure with S-2C caps.
Thermostat QTY
S-7
S-2C 2
2
H-7 1
Page 7
2.3A
F-10
F-8
F-1
H-1
H-1
H-2
H-2
H-6
H-1
H-2
H-10
H-6
H-1
S-7
S-2C
Working on the ground, line up holes in H-1 brackets with holes in H-6 shutter. Secure with S-7 bolts and S-2 caps.
H-6
H-1
H-1
2.3B
Working from outside insert four T-bolt assemblies into slots on H-1 brackets. Secure to F-8 and F-1 profiles as shown.
2.3c
Place H-2 Profile on top of shutter. Smooth aluminium tape along edges at top and sides. Repeat to install H-2 on bottom.
Shutter QTY
Tape QTY
NOTE: VIEWS FROM OUTSIDE.
Shutter Parts QTY
Connectors QTY
H-2 2
S-7 8
H-6 1
H-10
10’
5 of 8
S-2C 8
H-1 2
WWW.RSIWW.COM
Page 8
S-2D
S-11
H-3
H-9
S-5D
H-9
S-11
S-2D
S-5D
S-11
S-2D
H-4
H-3
H-5
2.4A
S-2C
Working from outside, fit H-4 brackets ontoT-bolts on F-8 and F-1 profiles. Secure with S-2C caps.
F-8
H-4
H-4
F-1
NOTE: VIEWS FROM OUTSIDE.
2.4B
2.4D
Place H-3 profile on H-4 brackets. Fit H-5 connector underneath and secure with S-11 bolts, S-5D washers and S-2D nuts as shown.
H-3
H-5
H-5
H-3
H-5
View from bottom
H-4
H-5
H-4
NOTE: VIEWS FROM OUTSIDE.
Install H-9 solar panel on H-3 profiles and secure with S-2D nut.
2.4c
S-2D
S-5D
S-11
Install 4 S-5A connectors on to H-9, 2 at the top and 2 at the bottom.
S-2D
S-5D
S-11
H-9
S-2D
S-5D
S-11
S-2D
S-5D
S-11
Bottom View
H-4
Connectors QTY
WWW.RSIWW.COM
H-9
H-3
H-5 4
H-3
H-4
Solar Panel QTY
H-9 1
6 of 8
Side View From Top
Solar Panel Parts QTY
H-4 2
H-3 2
Connectors QTY
S-11 8 S-5D 8 S-2D 12
S-7
4
S-2C 4
Page 9
2.5A
H-9
Working from inside. Drill hole through polycarbonate.
NOTE: VIEW FROM INSIDE.
2.5B
2.5c
Connect wires to Solar Panel. Push the wires to the inside of the greenhouse (leaving enough wire on the outside to connect).
Measure over to the thermostat with the wire. You will need to cut the positive wire. Look at the solar panel connectors to determine the positive wire. You will hook the positive wire coming in from the solar panel to the top lug of the thermostat. The other wire will be attached to the bottom lug. (NOTE you are only breaking one leg of the circuit).
This wire to Solar Panel.
Thermostat Control Unit with Cover removed.
NOTE: VIEW FROM OUTSIDE.
This wire to Fan.
NOTE: VIEW FROM INSIDE.
6 of 8
Wire QTY
H-11 16’
WWW.RSIWW.COM
Page 10
2.5D
Continue the wire over to the fan and attach to the wires of the fan with the two wire nuts provided. If it runs backwards reverse wires.
H-7
2.5E
H-8
OPTIONAL CHARGE CONTROLLER AND BATTERY: For accurate wiring using charge controller and battery, refer to the wiring diagram provided with the charge controller.
NOTE: VIEW FROM INSIDE.
WWW.RSIWW.COM
Charge
Controller
H-7
H-8
Battery
NOTE: VIEW FROM INSIDE.
8 of 8
Loading...