Q Premier 130 Condensing Boiler
Standard Features
• Onboard outdoor reset control system with sensor standard
• Factory installed Low Loss Header
• Priority DHW standard
• 24 gallon charged indirect stainless steel storage tank
• Modulating Ceramic premix burner
• 5:1 turn down ratio
• Direct spark ignition
• Exceeds SCAQMD 1146.2 Low NO
requirements
x
• Proprietary Stainless Steel Water tube condensing heat exchanger
• Direct Vent sealed combustion
• Concentric and twin pipe venting adapters included
• Approved for room and closet installations
• Pre-piped to accept a DHW recirculation line
QP130 SPECIFICATIONS
General Specifications
Units
Water content CH gal 1.3
Water content DHW gal 24
Max supply boiler
temperature
Max operating pressure psi 45
Relief valve rating (heating) MBH 375
Relief valve pressure rating psi 30
Dry weight lbs 243
Min inlet gas pressure NG "W.C. 4.0"
°F 176
Performance Specifications
Units
Fuel Type NG
Input - high fire MBH 130
Input - low fire MBH 26
Q
Output non-condensing CH MBH 117
N
Output EN677 efficiency CH MBH 127.6
Q
N
Q
Output AFUE CH MBH 124.9
N
Heating Capacity MBH 119
AFUE (I=B=R) % 96.1
Part Load Efficiency (EN677) % 98.2
Optional Accessories
• RS100 Single zone controller
• Room Air Filter
• NG to LP conversion Kit
Piping Options
• Right side pre-bend piping kit
• Left side pre-bend piping kit
• Top side pre-bend piping kit
Max inlet gas pressure NG "W.C. 10.5"
First hour rating gal/hour 211
Min inlet gas pressure LP "W.C. 8.0"
Max inlet gas pressure LP "W.C. 14.0”
Max equivalent exhaust
vent length
Max equivalent combustion
air vent length
ft 100
ft 100
Polypropylene
Approved venting materials
Stainless
Steel, PVC,
CPVC
Electrical Specifications
Units
Electrical Voltage Mains VAC/Hz 120/60
Electrical Voltage Controls VDC 24
Power Consumption Max Load W 199
Power Consumption Stand by Load W 14
Recommended Circuit breaker rating A 15
Rinnai is continually updating and improving products; therefore, specifications are subject to change without prior
notice. Local, state, provincial and federal codes must be adhered to prior to installation.
© 2012 Rinnai Corporation
QP130 SP 8/2012
Q Premier 130 Condensing Boiler
DIMENSIONS
H
J
K
L
M
N
inch / mm
A Height 61.8 / 1570
PP
QQ
RR
S
D
G
E
C
A
O
B Height including vent connection 64.5 / 1640
C Width 23.6 / 600
D Depth 25.2 / 640
E Center boiler / vent 3.7 / 95
F Back / vent 18.5 / 470
F
B
Center to center / vent and air supply
G 4.7 / 122
Connection side: Left and Right
H Bottom side boiler / supply pipe 48.4 / 1230
J Bottom side boiler / return pipe 45.7 / 1160
K Bottom side boiler /
L Bottom side boiler /
M Bottom side boiler /
N Bottom side boiler /
0 Bottom side boiler / Condensate pipe 26.0 / 662
Connection side: Top
P Center boiler /
Q Center boiler /
R Center boiler /
S Back boiler /
hot water pipe
gas pipe
Cold water pipe
DHW circulation
return pipe
DHW circulation
return pipe
Cold water pipe
Gas pipe
Hot water pipe
Gas pipe
Hot water pipe
DHW circulation
return pipe
Cold water pipe
Supply pipe
Return pipe
center of all pipe
connections
42.9 / 1090
40.2 / 1020
37.4 / 950
34.6 / 880
6.9 / 175
4.1 / 105
1.4 / 35
1.2 / 30
S
Clearances
Minimum required
inch / mm inch / mm
Top 0 10 / 250
Back 0 0
Front 6 / 150 24 / 600
Left side 0 2 / 50
Right
side
Vent 0 0
Rinnai Corporation • 103 International Drive • Peachtree City, GA 30269 • Toll-Free: 1-800-621-9419 • Fax: 678-364-8643 • www.rinnai.us
clearance to
combustibles and
non-combustibles
0 2 / 50
clearances
Recommended
service