
RIGOL
M4 x 6 Phil-Slot Pan Head Machine
Screw Nail
M6 x 20 Phil-Slot Pan Head Machine
Screw Nail
M6 x 4 Square Machine Female
Screw Contain Lock Blade
To Use the Rack Mount Kit
This oscilloscope can be mounted in a standard 19-inch rack cabinet that conforms to
the Electric Industrial Association (EIA) standard. If needed, please buy and install
the corresponding option.
Kit Parts List
DS6000 User’s Guide
www.GlobalTestSupply.com

RIGOL
2-1 2-2 2-3
Installation Tool
PH2 Phillips Screwdriver (recommended).
DS6000 User’s Guide
www.GlobalTestSupply.com

RIGOL
Installation Space
The following requirements must be fulfilled by the machine cabinet in which the
instrument is mounted.
The machine cabinet must be a standard 19-inch one.
At least 6U (266.7 mm) space should be provided by the machine cabinet.
The depth inside the machine cabinet should not be less than 400 mm.
The dimension of the instrument after being installed is shown below.
DS6000 User’s Guide
www.GlobalTestSupply.com

RIGOL
Installation Procedures
Only authorized operators can execute the installation operation. Improper
installation might result in damage of the instrument or incorrect installation of the
instrument on the rack.
1. Install the right and left plates: align the detents of the right and left plates with
the openings on the support board and insert them into the support board
respectively, then fix them with six M4 screws.
2. Place the Instrument: press the button above the battery on the instrument to
remove the battery. Then align the instrument with the spacing on the support
board and place it on the support board.
DS6000 User’s Guide
www.GlobalTestSupply.com

RIGOL
3. Fix the instrument: fix the instrument on the support board with two back
battens and twelve M4 screws.
4. Install the front panel: align the screw holes on the right and left plates with the
screw holes on the front panel of the rack and let the front panel of the
oscilloscope protrude from the opening. Then fix them with six M4 screws.
DS6000 User’s Guide
www.GlobalTestSupply.com

RIGOL
5. Load into the machine cabinet: mount the rack with the instrument fixed to it
into a standard 19-inch machine cabinet with four M6 screws and four M6 square
nuts.
6. Post-installation notice: the rack occupies a height of 6U. The holes pointed out
by the arrows are installation holes. Note that they should be aligned with during
installation.
DS6000 User’s Guide
www.GlobalTestSupply.com