RIGOL RM-DS1000Z/DG4000 User manual

Page 1
RIGOL
Installation Guide
© 2013 RIGOL T echnologies, Inc. All Rights Reserved.
DS1000Z/DG4000
DS1000Z/DG4000 Rack Mount Kit
www.GlobalTestSupply.com
Page 2
标号 No.
名称 Name
数量 Qty.
零件编号 Part No.
描述 Description
Front Panel
Support Panel
Left Plate
Right Plate
Pressure Feet
Built-in Fitting
M4 x 6
Machine Screw
M6 x 20
Head Machine Screw
M6 x 4
Blade

产品简介 Product Overview

Using this rack mount kit, you can install the RIGOL DS1000Z series digital oscilloscope or DG4000 series function/arbitrary waveform generator into a standard 19 inches cabinet. This manual takes DG4000 as an example to introduce the installation method.

部件清单 Kit Parts List

前面板
底板
左侧板
右侧板
压脚
固定件
M4 螺钉 M4 Screw
M6 螺钉 M6 Screw
M6 螺母 M6 Nut
1-1
1-2
1-3
1-4
1-5
1-6
2-1
2-2
2-3
1 RM-DG4-01
1 RM-DG4-02
1 RM-DG4-03
1 RM-DG4-04
2 RM-DG4-05
2 RM-DG4-06
18 RM-SCREW-01
4 RM-SCREW-02
4 RM-SCREW-03
www.GlobalTestSupply.com
-1-
螺钉 M4 x 6 Phil-Slot Pan Head
螺钉 M6 x 20 Phil-Slot Pan
M6 x 4 Square Machine
Female Screw Contain Lock
十一字切沟盘头机械牙
十一字切沟盘头机械牙
带定位锁片机械牙方螺
Page 3

部件示意图 Parts Schematic Diagram

2-1 2-2 2-3
www.GlobalTestSupply.com
-2-
Page 4

安装工具 Installation Tool

PH2 Phillips Screwdriver (recommended).

安装空间 Installation Space

The following requirements must be f ulfilled by the machine cabinet in which the instrument is mounted.
The machine cabinet must be a standard 19-inch one. At least 4U (177.8 mm) space should be provided by the machine cabinet. The depth inside the machine cabinet should not be less than 180 mm.
The dimension of the instrument after being installed is as shown below.
www.GlobalTestSupply.com
-3-
Page 5
Installation Procedure
Only authorized operators can execute the installation operation. Improper installation might result in damage of the instrument or incorrect installation of the instrume nt on the rack.
1.
Install the right and left plat es: align the detents of the right and left plat es with the openings on the support board and insert them into the support board respectively, then fix them with four M4 screws.
www.GlobalTestSupply.com
-4-
Page 6
2. Install the front panel of the rack mount kit: fix the front panel onto the frame installed in the previous step using six M4 screws.
3. Fix the bottom of the instrument: fix the instrument onto the support board using two pressure feet and four M4 screws.
www.GlobalTestSupply.com
-5-
Page 7
4. Fix the top of the instrument: fix the top of the instrument using two built-in fittings and four M4 screws.
5.
Load into the machine cabinet: mount the rack with the instrument fixed to it into
www.GlobalTestSupply.com
-6-
Page 8
S M1 0 2 0 0 0 2 6 9 2
a standard 19-inch machine cabinet with four M6 screws and four M6 square nuts.
6. Post-installation notice: the rack occupies a height of 4U. The hole s poi nted out by the arrows are installation holes. Note that they should be aligned with during installation.
IGA17X00-1110 Nov. 2013
www.GlobalTestSupply.com
-7-
Loading...