This rack mount kit is designed to mount RIGOL DP800 series programmable linear DC
power supply into a 19-inch machine cabinet that conforms to the Electronic Industries
Association (EIA) standard.
6 Side Beam Fastener22 -7 M4 Screw 26 26 M4x8 Phillips Pan Head Screw
8 M6 Screw 8 8 M6x16 Phillips Pan Head Screw
9 M6 Nut 8 8 M6 Square Lock Cage Nut
[1]
Note
: RM-1-DP800 is designed for installing a single instrument and RM-2-DP800 for two instruments.
8 3 5 2 1 4 9 7 6
RM-1-DP800
Qty.
RM-2-DP800
Description
7 8 9
Installation Tool
The PH2 Phillips screwdriver is recommended.
Space Requirements
To mount the instrument into the cabinet correctly, please ensure that the following
requirements are met.
The cabinet must be a standard 19-inch one.
The available height of the cabinet should be at least 4U (177.8mm).
The depth of the cabinet should be at least 500mm.
1
Installation Guide RIGOL
The dimensions of the racks are as shown below.
RM-1-DP800
RM-2-DP800
Installation Procedures
Caution: Only authorized operators are allowed to perform the installation. Improper installation might cause damage to the instrument or an installation failure.
Mount a single instrument (Requiring to order RM-1-DP800)
1. Remove four rubber protective covers at the corner of the front panel and four at the
corner of the rear panel for the instrument.
2. Place the instrument onto the bottom plate,
then use two M4 screws to fasten the
instrument.
4. Attach the filler panel to the right side of
the front panel, then secure the filler panel
with two M4 screws.
3. Attach the left fastener to the left side of
the front panel, then secure the left
fastener with two M4 screws.
5. Attach the right fastener to the right side
of the filler panel, then secure the right
fastener with two M4 screws.
2
Installation Guide RIGOL
ffr
6. Attach one rail to the right side of the
bottom plate, then secure the rail with
seven M4 screws.
8. Attach two side beam fasteners to the end
parts of the two rails respectively, then
secure the side beam fasteners with four
M4 screws.
7. Attach the other rail to the left side of the
bottom plate, then secure the rail with
seven M4 screws.
9. Mount the assembled instrument and
rack into a standard 19-inch cabinet using
eight M6 screws and eight M6 nuts.
-End-
Mount two instruments (Requiring to order RM-2-DP800)
1. Remove four rubber protective covers at the corner of the front panel and four at the
corner of the rear panel for each instrument.
2. Place two instruments onto the bottom
plate, then use four M4 screws to fasten the
instruments.
3. Attach the left fastener to the left side of
the front panel of Instrument A, then
secure the left fastener with two M4
screws.
Instrument A
Instrument B
3
Installation Guide RIGOL
The dimensions of the racks are as shown below.
RM-1-DP800
RM-2-DP800
Installation Procedures
Caution: Only authorized operators are allowed to perform the installation. Improper installation might cause damage to the instrument or an installation failure.
Mount a single instrument (Requiring to order RM-1-DP800)
1. Remove four rubber protective covers at the corner of the front panel and four at the
corner of the rear panel for the instrument.
2. Place the instrument onto the bottom plate,
then use two M4 screws to fasten the
instrument.
4. Attach the filler panel to the right side of
the front panel, then secure the filler panel
with two M4 screws.
3. Attach the left fastener to the left side of
the front panel, then secure the left
fastener with two M4 screws.
5. Attach the right fastener to the right side
of the filler panel, then secure the right
fastener with two M4 screws.