Technical Bulletin No. RTB-001
SUBJECT: Manual Correction DATE: Apr. 15, ’92
PAGE: 1 of 3
PREPARED BY: S. Mano
CHECKED BY:
CLASSIFICATION:
Action Required
Troubleshooting
Retrofit Information
Please correct your service manual as follows:
Revision of service manual
Information only
Other
FROM: Copier Technical Support Section
MODEL: NC-X
Page 1-23
Please correct the description regarding PCB9 (Transfer drum Interface PCB).
Incorrect: Interfaces the transfer drum cleaning motor/solenoid and the wire
cleaner motor with the transfer power pack
Correct: Interfaces the transfer drum cleaning motor/solenoid with the
transfer power pack
Page 2-54, page 4-24 and Check Point for Installation Procedure (Water
Proof)
Please correct the normal data for the Toner Density sensor (TD sensor) gain data
(monitored by SP64-8).
Incorrect: 130 ±10
Correct: 142 ±10
The TD sensor gain data of the NC-X differs from that of the NC11 because developer
quantity is different (NC11:1200g, NC-X:1000g).
Page 2-60
Please eliminate the fourth paragraph (The color development unit fan and ozone filter are
located underneath the unit) because there is no fan there.
Page 2-85 second sentence from the last.
Incorrect: +5kV AC
Correct: 5kV AC
Page 4-25
SP mode No.70-7 does not exist on the NC-X, so please delete description regarding SP
No.70-7. Black developer is manually collected as described in page 5-39 to 5-40.
Technical Bulletin No. RTB-001
SUBJECT: Manual Correction DATE: Apr. 15, ’92
PAGE: 2 of 3
Page 4-35
Please correct the name of sensors No.7,8 and 19.
Incorrect Correct
No.7 Platen Cover Lead Switch Platen Cover Closed Switch
No.8 Platen Position Sensor Platen Cover Position Sensor
No.19 LCT Sensor LCT Tray Down Sensor
Page 5-64 (Step 6)
Paper spacers [A] should be set at 70mm to 80 mm from the leading edge of the transfer
sheet.
Incorrect: 60 to 70mm from the leading edge
Correct: 70 to 80 mm from the leading edge
Incorrect illustration
60 to 70mm
Page 5-105
In step 3-3), there is a spelling mistake.
Correct illustration
Incorrect: importing
Correct: Imputing
Technical Bulletin No. RTB-001
SUBJECT: Manual Correction DATE: Apr. 15, ’92
PAGE: 3 of 3
Page 1 of 3rd Paper Feed Unit section
Please correct the fourth item of the specification (Power Source).
Incorrect: 100V, 50/60 Hz, 0.6 A (From Copier)
Correct: DC 5V, 24V (From Copier)
Page 23 of Document Feeder section
Please correct the number of screws in the Installation procedure step 1-5).
Incorrect: Right cover [F] (2 screws)
Correct: Right cover [F] (4 screws)