RHINO Xpress 20 Assembly Instructions Manual

990035 Tires 18 x 8.5-8
990034 Axle
200583 Latch Bracket
200659 Tipper latch
990038 Hdwe bag
200666 Tongue pivot
990037 Pin coupler
200661 Tongue
3/8 x 1 Bolt, washers, nylock nuts
Cotter pins
7/16 x 1 Bolt and lock washers
3/8 Bolts and nylock nuts
3/8 x 3”
3/8 x 2 ¾”
3/8 x 2 ½”
3/4“ machine
washers
200791 Plastic Trailer Body
Rhino Xpress 20 Trailer Assembly Instructions
Tools Required:
Ratchet
Extension for ratchet
9/16” socket
9/16” wrench
Pliers
Hammer
1. Turn trailer body upside down and align the axle with the 7/16” threaded holes in the aluminum
Power rails.
Position axle over the smaller threaded holes in the power rail.
Secure here with
the 7/16x1” bolts
and lock washers. Grease zerk.
¾” machine washer.
Cotter pin
power rails which are molded into the trailer body. Tighten securely using the 7/16 x 1” bolts and lock washers.
2. Slide wheels onto the axle stub as shown. Grease zerk should be on the inside. Next slide the ¾”
machine washer onto the axle stub and place the cotter pin thru the hole in the axle stub. Be sure to bend cotter pin over to hold the wheel onto the axle. Note: Grease before using.
Loading...
+ 2 hidden pages