FOR 4 POSITION CONDENSING TWO-STAGE,
COMMUNICATING GAS FURNACES W/ECM BLOWER
(-)96V SERIES
& (-)(-)96MDV SERIES
U.L. and/or C.S.A. recognized fuel gas and CO (carbon monoxide) detectors are recommended in all applications, and their installation should be in accordance with the
manufacturer’s recommendations and/or local laws, rules, regulations, or customs.
OTE: A heat loss calculation should be performed to
N
properly determine the required furnace BTU size for the
structure. Also, the duct must be properly designed and installed for proper airflow. Existing ductwork must be inspected for proper size and to make sure that it is properly
sealed. Proper airflow is necessary for both user comfort
and equipment performance.
Before opening the furnace carton, verify that the data
tags on the carton specify the furnace model number
that was ordered from the distributor and are correct
for the installation. If not, return the unit without opening the carton. If the model number is correct, open
the carton and verify that the furnace rating label
specifies the same furnace model number that is
specified on the carton label. If the model numbers do
not match, return the furnace to the distributor.
IMPORTANT: Proper application, installation and maintenance of this furnace and system is a must if consumers
are to receive the full benefits for which they have paid.
The (-)96V and (-)(-)96MDV series furnaces are designcertified by CSA for use with natural and propane gases as
follows:
FIGURE 1
FURNACE COMPONENTS
1. As non-direct vent central forced air furnaces taking
ombustion air from the installation area or using air
c
ucted from the outside.
d
General Information
2. As direct vent central forced air furnaces with all combustion air supplied directly to the furnace burners
through a special air intake system outlined in these
instructions.Install this furnace in accordance with the
American National Standard Z223.1 – latest edition
entitled “National Fuel Gas Code” (NFPA54) or, for
Canada, CSA B149.1; Canadian Natural Gas and
Propane Installation Code and requirements or codes
of the local utilities or other authorities having jurisdiction. This is available from the following:
National Fire Protection Association, Inc.
Batterymarch Park
Quincy, MA 02269
CSA-INTERNATIONAL
5060 Spectrum Way
Mississauga, Ontario
Canada L4W5N6
Online: www.csa.ca
20CONTROL MOUNTING PLATE
21BLOWER
22LOW VOLTAGE TERMINAL
23COUPLING (IDB TO ELBOW)
24FURNACE CONTROL
ST-A1205-01
3
GENERAL INFORMATION (cont.)
In Canada installations must comply with CSA B149.1.
Install units in Canada in accordance with CSA-B149,
local installation codes and authorities having jurisdiction.
SA-B149.1 is available from:
C
CSA INTERNATIONAL
5060 Spectrum Way
Mississauga, Ontario
Canada L4W 5N6
online: www.csa.ca
General Information
NOTICE: Any equipment immersed in water (including by
flooding) must be replaced. Equipment and products immersed in water will have operation adversely affected
thereby voiding the warranty.
RECEIVING
Immediately upon receipt, all cartons and contents should
be inspected for transit damage. Units with damaged cartons should be opened immediately. If damage is found, it
should be noted on the delivery papers, and a damage
claim filed with the last carrier.
• After unit has been delivered to job site, remove carton
taking care not to damage unit.
• Check the unit rating plate to be sure equipment
matches job specifications.
• Read the entire instructions before starting the installation.
• Install the unit in such a way as to allow necessary access for service.
• Always remove the solid metal base pan from the top of
the furnace. The base pan is installed in this location for
shipping purposes only and should never remain in the
as-shipped location after installation.
• Install the unit with a 1/4” to 1/2” forward slope (toward
front) to ensure proper drainage.
• Install the unit in accordance with any local code which
may apply and the national codes. Latest editions are
available from: “National Fire Protection Association,
Inc., Batterymarch Park, Quincy, MA 02269.” These
publications are:
• ANSI/NFPA No. 70-(Latest Edition) National Electrical
Code.
• NFPA90A Installation of Air Conditioning and Ventilat-
ing Systems.
• NFPA90B Installation of warm air heating and air con-
ditioning systems.
• In Canada CSA 22.2 Canadian Electrical Code.
• In Canada CSA B149.1; Canadian Natural Gas and
Propane Installation Code.
CALIFORNIA RESIDENTS ONLY
MPORTANT: All manufacturer products meet current
I
Federal OSHA Guidelines for safety. California Proposition
65 warnings are required for certain products, which are
not covered by the OSHA standards.
California's Proposition 65 requires warnings for products
sold in California that contain, or produce, any of over 600
listed chemicals known to the State of California to cause
cancer or birth defects such as fiberglass insulation, lead
in brass, and combustion products from natural gas.
All “new equipment” shipped for sale in California will have
labels stating that the product contains and/or produces
Proposition 65 chemicals. Although we have not changed
our processes, having the same label on all our products
facilitates manufacturing and shipping. We cannot always
know “when, or if” products will be sold in the California
market.
You may receive inquiries from customers about chemicals found in, or produced by, some of our heating and airconditioning equipment, or found in natural gas used with
some of our products. Listed below are those chemicals
and substances commonly associated with similar equipment in our industry and other manufacturers.
• Glass Wool (Fiberglass) Insulation
• Carbon Monoxide (CO)
• Formaldehyde
• Benzene
More details are available at the Websites for OSHA (Occupational Safety and Health Administration), at
www.osha.gov
of Environmental Health Hazard Assessment), at
www.oehha.org. Consumer education is important since
the chemicals and substances on the list are found in our
daily lives. Most consumers are aware that products present safety and health risks, when improperly used, handled and maintained.
and the State of California's OEHHA (Office
4
Installation Instructions remain with the furnace as a reference guide to the servicing contractor. We recommend
that performance and installation data be recorded for future reference on this sheet to meet service and warranty
bligations so that job site information is available when required.
______ L.P. Kit Number (if applicable) (record kit number)
ELECTRICAL
______ 115 V.A.C. supply (Dedicated Circuit)
(record voltage)
______ Polarity observed
______ Furnace properly grounded
______ Correct wire size (record type and gauge)
FURNACE INSTALLATION
______ Correct clearance to combustibles (record
______ clearance)
______ Correct clearance for service (at front) (record
______ clearance)
DUCT STATIC PRESSURE
______ in. w.c. on heating speed (record static pressure)
______ in. w.c. on cooling speed (record static pressure)
______ Air temperature rise in heat (record air temperature
______ rise)
______ Air temperature rise in cool (record air temperature
______ rise)
______ ft. of pipe – exhaust pipe (record length)
______ no. of elbows – exhaust pipe (record number of
______ elbows)
______ Exhaust Vent Temperature (record temperature)
TERMINATIONS – DIRECT VENT
VERTICAL
______ Intake – 12" [305mm] min. above roof/snow level
(record height above anticipated snow level)
or, in Canada, intake and exhaust vents conform
with CSA B149.1; Canadian Natural Gas and
Propane Installation Code
______ Correct relationship – exhaust to intake
HORIZONTAL/VERTICAL – CONCENTRIC (RXGY-E03A)
______ Intake – 12" [305mm] min. above roof/snow level
(record height above anticipated snow level)
or, in Canada, intake and exhaust vents conform
with CSA B149.1; Canadian Natural Gas and
Propane Installation Code
______ Exhaust sloped down toward furnace
______ Correct distances (horizontal and vertical) –
exhaust to intake
______ 12" [305mm] min. above grade/snow level (record
height above anticipated snow level) or, in
Canada, intake and exhaust vents conform
with CSA B149.1; Canadian Natural Gas and
Propane Installation Code
______ Above anticipated snow level (record maximum
______ anticipated snow level)
VENTING – NON-DIRECT VENT
______ in. diameter – exhaust pipe (record diameter)
______ ft. of pipe – exhaust (record length)
General Information
CONDENSATE LINE
______ Trap filled with water
______ Vented
______ Sloped toward drain
______ Condensate drain line hoses connected and
______ clamped
______ Freeze protection (if necessary)
VENTING – DIRECT VENT
______ in. diameter – intake pipe (record diameter)
______ in. diameter – exhaust pipe (record diameter)
______ ft. of pipe – intake air (record length)
______ no. of elbows – intake air (record number of
______ elbows)
______ no. of elbows (record number of elbows)
TERMINATION – NON-DIRECT VENT
VERTICAL
______ 12" [305mm] min. above roof/snow level (record
height above anticipated snow level) or, in
Canada, intake and exhaust vents conform
with CSA B149.1; Canadian Natural Gas and
Propane Installation Code
HORIZONTAL – STANDARD
______ 12" [305mm] min. above grade/snow level (record
height above anticipated snow level) or, in
Canada, intake and exhaust vents conform
with CSA B149.1; Canadian Natural Gas and
Propane Installation Code
5
SAFETY INFORMATION
WARNING
!
DO NOT INSTALL THIS FURNACE IN A MOBILE HOME!!
THIS FURNACE IS NOT APPROVED FOR INSTALLATION
IN A MOBILE HOME. DOING SO COULD CAUSE FIRE,
PROPERTY DAMAGE, PERSONAL INJURY OR DEATH.
WARNING
!
INSTALL THIS FURNACE ONLY IN A LOCATION AND POSITION AS SPECIFIED IN THE LOCATION REQUIREMENTS AND CONSIDERATIONS SECTION OF THESE
INSTRUCTIONS.
WARNING
!
IMPROPER INSTALLATION, OR INSTALLATION NOT
MADE IN ACCORDANCE WITH THE CSA INTERNATIONAL
(CSA) CERTIFICATION OR THESE INSTRUCTIONS, CAN
RESULT IN UNSATISFACTORY OPERATION AND/OR DANGEROUS CONDITIONS AND ARE NOT COVERED BY THE
MANUFACTURER’S WARRANTY.
Safety Information
WARNING
!
DO NOT BYPASS, JUMPER, OR REMOVE ANY SAFETY
SWITCH FROM THE FURNACE CONTROL CIRCUIT. IF A
SAFETY SWITCH CAUSES THE FURNACE TO SHUT
DOWN OR OPERATE INTERMITTENTLY, IT IS AN INDICATION OF A POTENTIAL SAFETY HAZARD THAT MUST BE
ADDRESSED BY A QUALIFIED TECHNICIAN, SERVICE
AGENCY OR THE GAS SUPPLIER. DO NOT RESET
SAFETY CONTROLS WITHOUT CORRECTIVE ACTION
AND/OR VERIFICATION OF PROPER SAFE OPERATION
BY A QUALIFIED INSTALLER, SERVICE AGENCY OR THE
GAS SUPPLIER.
REPLACE ANY SAFETY CONTROL COMPONENT ONLY
WITH IDENTICAL OEM REPLACEMENT PARTS. WHEN A
NEW SAFETY SWITCH IS INSTALLED, IT MUST BE
TESTED FOR A MINIMUM OF 15 MINUTES WITH THE
FURNACE OPERATING AT MAXIMUM INPUT RATE AND
WITH BOTH BLOWER AND BURNER DOOR INSTALLED.
IF THE FURNACE IS INSTALLED IN A CLOSET, THE
CLOSET DOOR MUST ALSO BE CLOSED FOR THIS
TEST. REPEAT THE TEST AT THE MINIMUM INPUT RATE
IF THE FURNACE IS A MULTI-STAGE FURNACE.
WARNING
!
USE ONLY WITH THE TYPE OF GAS APPROVED FOR
THIS FURNACE. REFER TO THE FURNACE RATING
PLATE.
WARNING
!
NEVER TEST FOR GAS LEAKS WITH AN OPEN FLAME.
USE A COMMERCIALLY AVAILABLE SOAP SOLUTION
MADE SPECIFICALLY FOR THE DETECTION OF LEAKS
TO CHECK ALL CONNECTIONS, AS SPECIFIED IN GAS
SUPPLY AND PIPING SECTION OF THESE INSTRUCTIONS.
WARNING
!
COMBUSTION AND VENTILATION AIR MUST BE PROVIDED TO THE FURNACE AS REQUIRED BY THE NATIONAL FUEL-GAS CODE (U.S.) AND CSA B149.1
(CANADA) AND THE COMBUSTION AND VENTILATION
AIR SECTION OF THESE INSTRUCTIONS.
W
AR
N
IN
!
C
O
MB
U
STI
D
O
O
V
E
N
I
N
S
T
!
WHEN A FURNACE IS INSTALLED SO THAT SUPPLY
DUCTS CARRY AIR CIRCULATED BY THE FURNACE TO
AREAS OUTSIDE THE SPACE CONTAINING THE FURNACE, THE RETURN AIR SHALL ALSO BE HANDLED BY
DUCT(S) SEALED TO THE FURNACE CASING AND TERMINATING OUTSIDE THE SPACE CONTAINING THE FURNACE.
!
WHENEVER THE FACTORY RETURN-AIR CONNECTION
IS NOT USED IT MUST BE SEALED. A SOLID METAL
BASE PLATE MUST BE INSTALLED AND SEALED. FACTORY BASE PLATES ARE AVAILABLE AS ACCESSORY
ITEMS. (PART NUMBERS ARE LISTED IN THE SPEC
SHEET FOR THE FURNACE.) FAILURE TO INSTALL AND
SEAL THE BASE PLATE AND RETURN AIR DUCT CONNECTIONS MAY ALLOW CARBON MONOXIDE AND
OTHER CONTAMINANTS TO BE DRAWN INTO THE CONDITIONED AIR SPACE AND DISTRIBUTED THROUGHOUT
THE HEATED SPACE.
!
DO NOT OPERATE THE SYSTEM WITHOUT FILTERS. A
PORTION OF THE DUST ENTRAINED IN THE AIR MAY
TEMPORARILY LODGE IN THE AIR DUCT RUNS AND AT
THE SUPPLY REGISTERS. ANY CIRCULATED DUST PARTICLES WILL BE HEATED AND CHARRED BY CONTACT
WITH THE FURNACE HEAT EXCHANGER. THIS SOOTY
RESIDUE WILL SOIL CEILINGS, WALLS, DRAPES, CARPETS AND OTHER HOUSEHOLD ARTICLES. SOOT DAMAGE MAY ALSO RESULT WITH, OR WITHOUT, FILTERS IN
PLACE, WHEN CERTAIN TYPES OF CANDLES ARE
BURNED, OR CANDLEWICKS ARE LEFT UNTRIMMED.
!
IN COMPLIANCE WITH RECOGNIZED CODES, IT IS RECOMMENDED THAT AN AUXILIARY DRAIN PAN BE INSTALLED UNDER THIS FURNACE AND ANY INSTALLED
EVAPORATOR COIL THAT IS LOCATED IN ANY AREA OF
A STRUCTURE WHERE DAMAGE TO THE BUILDING OR
BUILDING CONTENTS MAY OCCUR AS A RESULT OF AN
OVERFLOW OF THE FURNACE CONDENSATE DISPOSAL
SYSTEM OR THE COIL DRAIN PAN OR A STOPPAGE IN
THE PRIMARY CONDENSATE DRAIN PIPING.
O
R
S
.
C
O
T
S
Y
S
TE
A
LLA
TI
WARNING
WARNING
WARNING
WARNING
G
N
PR
O
D
U
C
TS
MU
S
T
B
E
D
I
S
C
H
A
R
G
E
D
O
U
N
N
E
C
T
TH
I
S
FU
R
N
A
C
E
TO
A
N
A
P
P
M
O
N
L
Y
,
A
S
S
P
EC
I
FI
E
D
I
N
O
N
S
E
C
TI
O
N
O
F
TH
E
TH
S
E
I
N
S
TR
E
U
VEN
C
TI
R
O
OV
T
T
E
D
PI
P
E
N
S
.
-
6
SAFETY
WARNING
!
ALWAYS INSTALL THE FURNACE TO OPERATE WITHIN
THE FURNACE’S INTENDED TEMPERATURE-RISE
RANGE WITH A DUCT SYSTEM WHICH HAS AN EXTERNAL STATIC PRESSURE WITHIN THE ALLOWABLE
RANGE, AS SPECIFIED IN THE DUCTING SECTION OF
THESE INSTRUCTIONS. SEE ALSO FURNACE RATING
PLATE.
THE FURNACE MAY BE USED FOR HEATING OF BUILDINGS OR STRUCTURES UNDER CONSTRUCTION.
INSTALLATION MUST COMPLY WITH ALL INSTALLATION
INSTRUCTIONS INCLUDING:
PROPER VENT INSTALLATION;
-
FURNACE OPERATING UNDER THERMOSTATCONTROL;
RETURN AIR DUCT SEALED TO THE FURNACE;
-
AIR FILTERS IN PLACE;SET FURNACE INPUT RATE AND TEMPERATURERISE PER RATING PLATE MARKINGS;
MEANS FOR PROVIDING OUTDOOR AIR RE-
-
QUIRED FOR COMBUSTION;
RETURN AIR TEMPERATURE MAINTAINED BE-
-
TWEEN 55°F (13°C) AND 80°F (27°C); AND
CLEAN FURNACE, DUCT WORK AND COMPO-
-
NENTS UPON SUBSTANTIAL COMPLETION OF
THE CONSTRUCTION PROCESS, AND VERIFY
THAT THE FURNACE OPERATING CONDITIONS
INCLUDING IGNITION, INPUT RATE, TEMPERATURE RISE AND VENTING, ACCORDING TO THE
INSTRUCTIONS AND CODES.
IMPORTANT INFORMATION
ABOUT EFFICIENCY AND
INDOOR AIR QUALITY
Central cooling and heating equipment is only as efficient
as the duct system that carries the cooled or heated air.
To maintain efficiency, comfort and good indoor air quality, it is important to have the proper balance between the
air supplied to each room and the air returning to the
cooling and heating equipment.
Proper balance and sealing of the duct system improves
the efficiency of the heating and air conditioning system
and improves the indoor air quality of the home by reducing the amount of airborne pollutants that enter homes
from spaces where the ductwork and / or equipment is
located. The manufacturer and the U.S. Environmental
Protection Agency’s Energy Star Program recommend
that central duct systems be checked by a qualified contractor for proper balance and sealing.
WARNING
!
DUCT LEAKS CAN CREATE AN UNBALANCED SYSTEM
AND DRAW POLLUTANTS SUCH AS DIRT, DUST, FUMES
AND ODORS INTO THE HOME CAUSING PROPERTY
DAMAGE. FUMES AND ODORS FROM TOXIC, VOLATILE
OR FLAMMABLE CHEMICALS, AS WELL AS AUTOMOBILE EXHAUST AND CARBON MONOXIDE (CO), CAN BE
DRAWN INTO THE LIVING SPACE THROUGH LEAKING
DUCTS AND UNBALANCED DUCT SYSTEMS CAUSING
PERSONAL INJURY OR DEATH (SEE FIGURE 2).
• IF AIR-MOVING EQUIPMENT OR DUCTWORK IS LOCATED IN GARAGES OR OFF-GARAGE STORAGE
AREAS - ALL JOINTS, SEAMS, AND OPENINGS IN THE
EQUIPMENT AND DUCT MUST BE SEALED TO LIMIT
THE MIGRATION OF TOXIC FUMES AND ODORS INCLUDING CARBON MONOXIDE FROM MIGRATING
INTO THE LIVING SPACE.
• IF AIR-MOVING EQUIPMENT OR DUCTWORK IS LOCATED IN SPACES CONTAINING FUEL BURNING APPLIANCES SUCH AS WATER HEATERS OR BOILERS ALL JOINTS, SEAMS, AND OPENINGS IN THE EQUIPMENT AND DUCT MUST ALSO BE SEALED TO PREVENT DEPRESSURIZATION OF THE SPACE AND
POSSIBLE MIGRATION OF COMBUSTION BYPRODUCTS INCLUDING CARBON MONOXIDE INTO THE LIVING SPACE.
WARNING
!
BLOWER AND BURNERS MUST NEVER BE OPERATED
WITHOUT THE BLOWER DOOR IN PLACE. THIS IS TO
PREVENT DRAWING GAS FUMES (WHICH COULD CONTAIN HAZARDOUS CARBON MONOXIDE) INTO THE
HOME THAT COULD RESULT IN PERSONAL INJURY OR
DEATH.
FIGURE 2
MIGRATION OF DANGEROUS SUBSTANCES, FUMES, AND ODORS INTO
LIVING SPACES
Safety Information
Adapted from Residential Duct Diagnostics and Repair, with permission of Air Conditioning
Contractors of America (ACCA).
7
COMMONWEALTH OF MASSACHUSETTS NOTE
IMPORTANT! THE COMMONWEALTH OF MASSACHUSETTS REQUIRES COMPLIANCE WITH REGULATION
248 CMR 4.00 AND 5.00 FOR INSTALLATION OF
THROUGH-THE-WALL VENTED GAS APPLIANCES AS
FOLLOWS:
(a) For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used
in whole or in part for residential purposes, including
those owned or operated by the Commonwealth and
where the side wall exhaust vent termination is less than
seven (7) feet above finished grade in the area of the
venting, including but not limited to decks and porches,
the following requirements shall be satisfied:
1. INSTALLATION OF CARBON MONOXIDE DETECTORS. At the time of installation of the side wall horizontal
vented gas fueled equipment, the installing plumber or
gasfitter shall observe that a hard wired carbon monoxide
detector with an alarm and battery back-up is installed on
the floor level where the gas equipment is to be installed.
In addition, the installing plumber or gasfitter shall ob-
Safety Information
serve that a battery operated or hard wired carbon
monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served
by the side wall horizontal vented gas fueled equipment. It
shall be the responsibility of the property owner to secure
the services of qualified licensed professionals for the installation of hard wired carbon monoxide detectors.
a. In the event that the side wall horizontally vented gas
fueled equipment is installed in a crawl space or an attic,
the hard wired carbon monoxide detector with alarm and
battery back-up may be installed on the next adjacent floor
level.
b. In the event that the requirements of this subdivision
can not be met at the time of completion of installation,
the owner shall have a period of thirty (30) days to comply
with the above requirements; provided, however, that during said thirty (30) day period, a battery operated carbon
monoxide detector with an alarm shall be installed.
2. APPROVED CARBON MONOXIDE DETECTORS.
Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA
720 and be ANSI/UL 2034 listed and IAS certified.
3. SIGNAGE. A metal or plastic identification plate shall
be permanently mounted to the exterior of the building at
a minimum height of eight (8) feet above grade directly in
line with the exhaust vent terminal for the horizontally
vented gas fueled heating appliance or equipment. The
sign shall read, in print size no less than one-half (1/2)
inch in size, “GAS VENT DIRECTLY BELOW. KEEP
CLEAR OF ALL OBSTRUCTIONS”.
4. INSPECTION. The state or local gas inspector of the
ide wall horizontally vented gas fueled equipment shall
s
not approve the installation unless, upon inspection, the
inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248
CMR 5.08(2)(a) 1 through 4.
(b) EXEMPTIONS: The following equipment is exempt
from 248 CMR 5.08(2)(a)1 through 4:
1. The equipment listed in Chapter 10 entitled “Equipment
Not Required To Be Vented” in the most current edition of
NFPA 54 as adopted by the Board; and
2. Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate
from the dwelling, building or structure used in whole or in
part for residential purposes.
(c) MANUFACTURER REQUIREMENTS – GAS EQUIPMENT VENTING SYSTEM PROVIDED. When the manufacturer of Product Approved side wall horizontally vented
gas equipment provides a venting system design or venting system components with the equipment, the instructions provided by the manufacturer for installation of the
equipment and the venting system shall include:
1. Detailed instructions for the installation of the venting
system design or the venting system components; and
2. A complete parts list for the venting system design or
venting system.
(d) MANUFACTURER REQUIREMENTS – GAS EQUIPMENT VENTING SYSTEM NOT PROVIDED. When the
manufacturer of a Product Approved side wall horizontally
vented gas fueled equipment does not provide the parts
for venting the flue gases, but identifies “special venting
systems”, the following requirements shall be satisfied by
the manufacturer:
1. The referenced “special venting system” instructions
shall be included with the appliance or equipment installation instructions; and
2. The “special venting systems” shall be Product Approved by the Board, and the instructions for that system
shall include a parts list and detailed installation instructions.
(e) A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled equipment, all venting instructions, all parts lists for venting
instructions, and/or all venting design instructions shall remain with the appliance or equipment at the completion of
the installation.
8
1/4" MIN. TO 1/2" MAX. TILT
TOWARDTHEFRONT
OFTHECABINETINALL
INSTALLATIONS AND
ORIENTATIONS
1/4" MIN. TO 1/2" MAX. TILT
TOWARDTHEFRONT
OFTHECABINETINALL
INSTALLATIONS AND
ORIENTATIONS
UPFLOW / DOWNFLOW
HORIZONTAL (LEFT OR RIGHT)
GENERAL INFORMATION
1. IMPORTANT: If installing the unit over a finished ceil-
2. IMPORTANT: If using a cooling evaporator coil with
If these are manual dampers, they must be equipped to
prevent heating or cooling operation unless the damper is
in the full heat or cool position.
3. IMPORTANT: Furnace must be installed level from
NOTE: These furnaces are approved for installation in attics, as well as alcoves, utility rooms, closets and crawlspaces. Provisions must be made to prevent freezing of
condensate.
FREEZE PROTECTION
For installations where the furnace may reach temperatures below 32°F (0°C) (such as an alcove or attic installation), the installer must take precautions to ensure that the
drain trap and connected drain pipe do not freeze. Local
codes and practices should be followed in order to prevent
freezing.
If the drain trap is installed within the furnace cabinet, no
freeze protection is required. When the trap is mounted
outside or partially outside the cabinet, it must be pro-
LOCATION REQUIREMENTS
WARNING
!
WHEN THIS FURNACE IS INSTALLED IN A RESIDENTIAL GARAGE, IT MUST BE INSTALLED SO THE
BURNERS AND IGNITION SOURCE ARE LOCATED
NO LESS THAN 18 INCHES [450MM] ABOVE THE
FLOOR. THIS IS TO PREVENT THE RISK OF IGNITING FLAMMABLE VAPORS WHICH MAY BE PRESENT IN A GARAGE. ALSO, THE FURNACE MUST BE
LOCATED OR PROTECTED TO AVOID PHYSICAL
DAMAGE BY VEHICLES. FAILURE TO FOLLOW
THESE WARNINGS CAN CAUSE A FIRE OR EXPLOSION, RESULTING IN PROPERTY DAMAGE, PERSONAL INJURY OR DEATH.
ing or living area, be certain to install an auxiliary condensate drain pan under the entire unit. This auxiliary
drain pan should extend under any evaporator coil installed with the furnace and the open portion of the
condensate drain assembly. See “Condensate
Drain/Neutralizer” section for more details.
this furnace, be sure the air passes over the heat exchanger before passing over the cooling coil. The
cooled air passing over the warm ambient air inside
the heat exchanger tubes can cause condensation inside the tubes resulting in corrosion and eventual failure.
front-to-back or with a slight tilt such that the back of
the furnace is up to 1/2” higher than the front of the
furnace as shown in Figure 3.
ected from freezing. Regardless of the location of the
t
drain trap, any exposed drain piping must be protected
from freezing as required by local practices or codes. A UL
or CSA listed heat tape or UL or CSA approved heating
cable with a rating of 3-6 watts per foot is acceptable protection when installed and maintained in accordance with
the manufacturer’s instructions. Good installation practices
necessitate that the installer verify heat tape operation in
accordance with the manufacturer’s instructions at the
time of installation.
IMPORTANT: Support this unit when installed. Since this
furnace is suitable for attic or crawl space installation, it
may be installed on combustible wood flooring or by using
support brackets.
FIGURE 3
BACKFRONT
0-1/2 HIGHER
THAN FRONT
OF FURNACE
BACKFRONT
0-1/2 HIGHER
THAN FRONT
OF FURNACE
ST-A1194-13-X0
Location
9
A
I
R
F
L
O
W
NOTE:
HORIZONTAL LEFT ORIENTATION DEPICTED IN ILLUSTRATION.
HORIZONTAL RIGHT ORIENTATION IS SIMILAR IN INSTALLATION.
OPTION - B
2” - 3” PIPE
OPTION - A
2” PIPE
8”
6”
LOCATION REQUIREMENTS
GENERAL INFORMATION (cont.)
WARNING
!
THIS FURNACE IS NOT APPROVED OR RECOMMENDED FOR INSTALLATION ON ITS BACK, WITH
ACCESS DOORS FACING UPWARDS.
SITE SELECTION
1. Select a site in the building near the center of the proposed, or existing, duct system.
2. Give consideration to the vent system piping when selecting the furnace location. Be sure the venting system can get from the furnace to the termination with
minimal length and elbows.
3. Locate the furnace near the existing gas piping. Or, if
running a new gas line, locate the furnace to minimize
the length and elbows in the gas piping. See Figure 5.
4. Locate the furnace to maintain proper clearance to
combustibles as shown in following Figure 6.
WARNING
!
DO NOT LIFT THE UNIT BY THE HEAT EXCHANGER
TUBES. DOING SO CAN DAMAGE THE HEAT EXCHANGER ASSEMBLY.
CLEARANCE – ACCESSIBILITY
Location
The design of forced air furnaces with input ratings as
listed in the tables under Figure 6 are certified by CSA-International for the clearances to combustible materials
shown in inches.
See name/rating plate and clearance label for specific
model number and clearance information.
Service clearance of at least 24 inches (30 cm) is recommended in front of all furnaces.
NOTE: Use recommended 24” (30 cm) clearance if accessibility clearances are greater than fire protection clearances.
For downflow non-zero clearance furnace installations, the
minimum clearance required on the right side of the furnace is shown in Figure 4. If this clearance cannot be
maintained, a downflow zero-clearance kit; RXGY-ZK will
need to be installed.
WARNING
!
UPFLOW FURNACES ARE DESIGNINSTALLATION ON COMBUSTIBLE FLOORS. NOTE,
HOWEVER, THAT FURNACES MUST NOT BE INSTALLED DIRECTLY ON CARPETING, TILE OR
OTHER COMBUSTIBLE MATERIAL OTHER THAN
WOOD FLOORING. INSTALLATION ON A COMBUSTIBLE MATERIAL CAN RESULT IN FIRE, CAUSING PROPERTY DAMAGE, PERSONAL INJURY OR
DEATH.
WARNING
!
COMBUSTIBLE MATERIAL MUST NOT BE
PLACED ON OR AGAINST THE FURNACE
JACKET. THE AREA AROUND THE FURNACE
MUST BE KEPT CLEAR AND FREE OF ALL COMBUSTIBLE MATERIALS INCLUDING GASOLINE
AND OTHER FLAMMABLE VAPORS AND LIQUIDS. PLACEMENT OF COMBUSTIBLE MATERIALS ON, AGAINST OR AROUND THE FURNACE
JACKET CAN CAUSE AN EXPLOSION OR FIRE
RESULTING IN PROPERTY DAMAGE, PERSONAL
INJURY OR DEATH. THE HOMEOWNER SHOULD
BE CAUTIONED THAT THE FURNACE AREA MUST
NOT BE USED AS A BROOM CLOSET OR FOR
ANY OTHER STORAGE PURPOSES.
FIGURE 4
NOTE: These
dimensions refer
to furnace
clearance only.
For required
vent clearances
and supports,
refer to vent
manufacturer’s
instructions.
NOTE: THESE ILLUSTRATIONS ARE INTENTIONALLY GENERIC.
NOTE: SOME PARTS OF YOUR FURNACE MAY APPEAR DIFFERENT.
FIGURE 5
CLEARANCE FLUE VENT TO WALL
”
6
8
ST-A1194-40-X0
”
CERTIFIED FOR
ST-A1194-05-X0
10
FIGURE 6
TOPBOTTOM
FRONTLEFT SIDERIGHT SIDE
RIGHT BACKTOPFRONTVENT
(-)96VA040
(-)(-)96MDV040
(-)96VA060
(-)(-)96MDV060
(-)96VA070
(-)(-)96MDV070
(-)96VA085
(-)(-)96MDV085
(-)96VA100
(-)(-)96MDV100
(-)96VA115
(-)(-)96MDV115
000120
000120
000120
000120
SHIPPING
WEIGHTS
MINIMUM CLEARANCE (IN.)
MODEL
LEFT
SIDE
UNIT DIMENSIONS
(CLEARANCE TO COMBUSTIBLES)
A
I
R
F
L
O
W
A
B
.62
.62
34.00
23.33
25.44
26.19
22.63
25.81
26.31
8.00
11.03
17.50
18.13
26.11
29.05
32.65
24.19
22.31
OPTIONAL TRAP
LOCATION
(HORIZONTAL)
OPTIONAL CONDENSATE
DRAIN (DOWNFLOW)
GAS
CONNECTION
OPTIONAL COMBUSTION
VENT LOCATION
OPTIONAL TRAP
LOCATION
(HORIZONTAL)
OPTIONAL VENT
AIR INLET
CONDENSATE DRAIN
(UPFLOW)
ELECTRICAL CONNECTION
LINE VOLTAGE
ELECTRICAL CONNECTION
LOW VOLTAGE
22.96
23.80
8.00
11.00
17.44
29.05
26.17
32.88
23.00
14.00
28.06
1.12
29.62
.62
19.83
OPTIONAL LINE VOLTAGE
WIRING
OPTIONAL LOW VOLTAGE
WIRING
OPTIONAL CONDENSATE
DRAIN (UPFLOW)
TRAP LOCATION
(HORIZONTAL)
OPTIONAL
GAS CONNECTION
OPTIONAL
CONDENSATE DRAIN
(DOWNFLOW)
1.76
1.66
24.86
26.26
B
19.83
SUPPLY
AIR
23.21
1.62
1.67
24.91
.30
C
19.77
A
.65
RETURN
AIR
OPTIONAL
VENT OUTLET
KNOCKOUT
OPTIONAL COMBUSTION
AIR INLET KNOCKOUT
SUPPLY AND RETURN DEPICTED AS UPFLOW CONFIGURATION.
FLANGE CONFIGURATION WILL VARY DEPENDING ON INS TALLATION ORIENTATION.
A B C
17 1/2 16 17/64 16 13/64
21 19 49/ 64 19 45/64
24 1/2 23 17/64 23 13/64
FLANGE DIMENSIONS
*A SERVICE CLEARANCE OF AT LEAST 24” IS RECOMMENDED IN FRONT OF ALL FURNACES
000120
000120
UNIT DIMENSIONS (CLEARANCE TO COMBUSTIBLES)
ST-A1194-01-X0
Location
11
FIELD CONVERSIONS
CONDENSATE PVC/HOSE OPTIONS
BULKHEAD COUPLING
CONDENSATE DRAINIAGE HAS OPTIONS FOR 3/4" OR 1/2"
PVC CONNECTIONS. THE BULKHEAD COUPLING CONNECTS THE
RUBBER HOSES FROM INSIDE THE UNIT TO THE PVC PIPE
EXTERIOR OF THE UNIT. PVC PIPE CAN BE CEMENTED
DIRECTLY TO THE COUPLING AND THE TRAP WITH PROPER
PVC CEMENT AND PRIMER.
1
/2" PVC
P
IPE
3/4" PVC
TEE
RUBBER HOSE
CONNECTION
PVC FITTING/PIPE
3/4" PVC
C
OUPLING
IN ADDITION TO PVC CONNECTIONS, THE CONDENSATE
TRAP CAN ACCOMODATE A 5/8" RUBBER HOSE WITH A
HOSE CLAMP WHEN LOCATED INSIDE THE UNIT. PLIERS ARE
NECCESSARY TO ADD OR REMOVE CLAMP.
NOTE: IMPROPER HOSE CONNECTIONS WILL PREVENT
CONDENSATE FROM DRAINING.
CONDENSATE TRAP
THE CONDENSATE TRAP HAS 2 SIDES PLEASE NOTE THEIR
LOCATIONS FOR DRAIN CONNECTIONS DURING CONVERSION.
OUT TO DRAIN
COLLECTOR BOX
IN FROM
IN FROM FLUE
ELBOW OR COUPLING
1/4" VENT IN
FROM COLLECTOR BOX
GENERAL CONVERSION INSTRUCTIONS
ST-A1194-37-01
-2010°
CONVERSION AND INSTALLATION
C
ONSIDERATIONS
ALL CONVERSIONS REQUIRE THE CONDENSATE PLUMBING TO
HAVE DECLINE IN THE DIRECTION OF THE WATER FLOW.
WHEN INSTALLING AND MOVING CONDENSATE PLUMBING THE
HOSES SHOULD BE FREE OF KINKS FOR PROPER WATER FLOW.
WHEN DRAIN HOSE OR CONDENSATE TRAP HOSE
ROUTING CHANGES ARE NECESSARY BE SURE TO PLUG OR CAP
ANY UNUSED HOSE TAPS.
THE INDUCER COUPLING COMES FROM THE FACTORY WITH
A 10
TILT FOR UP FLOW INSTALLATIONS. WHEN
CONVERTED TO DOWN FLOW THE COUPLING REQUIRES A
ROTATION A MINIMUM OF 10
FROM HORIZONTAL AS SHOWN.
HORIZONTAL INSTALLATIONS REQUIRE CONDENSATE TRAP TO BE
MOUNTED EXTERNALLY BELOW THE UNIT:
-USE CAUTION-MOUNT THE TRAP AFTER THE UNIT IS AT
THE POINT OF INSTALLATION TO PREVENT DAMAGE TO THE
TRAP DURING TRANSPORT.
-HAND TIGHTEN SCREWS WHEN MOUNTING THE TRAP OR THE
BULKHEAD COUPLING TO THE CABINET TO PREVENT DAMAGE
TO THE MOUNTING FLANGE.
-USE PROPER FREEZE PROTECTION IF REQUIRED.
-ALLOW MINIMUM OF 6" BELOW THE FURNACE FOR CLEARANCE.
10-20°
TILT ON INDUCER COUPLING
GROUND
GROUND
LEVEL
MIDLINE
WORM
DRIVE
CLAMP
COUPLING
THE WORM DRIVE FOR THE HOSE CLAMPS
USED ON THE FLUE TRANSITION COUPLING
OR THE IDB COUPLING MUST BE ABOVE THE
LEVEL MIDLINE WHEN IN THE HORIZONTAL
POSITION AS DETAILED HERE.
IF THE IDB COUPLING IS REMOVED, IT MUST BE REPLACED IN THE
PROPER ORIENTATION. AN ARROW IS PRESENT ON THE COUPLING
TO INDICATE THE DIRECTION OF EXHAUST FLOW. MAKE SURE THE
ARROW POINTS IN THE CORRECT DIRECTION.
NOTE:
Field Conversions
12
FIELD CONVERSIONS
PARTS BAG (PROVIDED WITH UNIT)
CONVERSION KIT RXGY-CK
CONVERSION KIT RXGY-ZK
(X2)
2-5/8" FLUSH
MOUNT PLUG
1/2" DRAIN
HOSE E
INTAKE
C
OUPLING
.559" CONDENSATE
TRAP DRAIN PLUG
#8 X 1/2"
SCREW
(X2)
INTAKE
PIPE
1/4" BLACK
VENT TUBE
BULKHEAD
COUPLING
HOSE DOUBLE ELBOWTUBE C
HOSE CLAMP
INTAKE AIR
DIFFUSER
#8 X 1/2"
SCREW
(
X4)
#8 X 1/2"
SCREW
(X10)
5/8" DRAIN
HOSE B
CONDENSATE TRAP
BRACKET (DOWN FLOW)
2" PVC VANE
1/4" HOLE
PLUG
1/2" DRAIN
HOSE F
1/2" DRAIN
HOSE G
CONDENSATE
TRAP GASKET
2" PIPE GROMMET
(
3.375)
1/2" VINYL
CAP (YELLOW)
PIPE COLLAR
GASKET ASSEMBLY
(X2)
ST-A1194-38-03
GENERAL PARTS REQUIRED FOR CONVERSIONS
(X3)
FLUE PIPE
ASSEMBLY
W/ O-RING
O-RING
Field Conversions
SEE NEXT PAGE FOR APPLICABLE CONFIGURATIONS
13
FIELD CONVERSIONS
AIRFLOW
AIRFLOW
AIRFLOW
AIRFLOW
FIELD CONVERSION TO VARIOUS CONFIGURATIONS
Furnaces can be converted in the field from upflow (as-shipped) to downflow, horizontal left or horizontal right as necessary.
In addition, there are different venting options, including a zero-clearance option, to give the installer flexibility in locating the
venting for this furnace.
4b1 - CUT TUBE “C” TO FIT CORRESPONDING CABINET WIDTH.
4b2 - INSERT TUBE “C” INTO END “2” OF HOSE- DOUBLE ELBOW
4b3 - SLIDE TWO WIRE CLAMPS OVER TUBE “C”, SLIDE ONE WIRE CLAMP OVER
END “1” OF HOSE - DOUBLE ELBOW.
4b4 - INSTALL TUBE “C” WITH HOSE CLAMP AS SHOWN TO HOSE “A” “PRE ASSEMBLED”.
4b5 - ATTACH HOSE - DOUBLE ELBOW TO BULKHEAD COUPLING POSITION WIRE HOSE
CLAMP.
HOSE A
TUBE C
4A
HOSE A
4a - LEFT SIDE DRAIN OPTION
ATTACH HOSE A (PRE-INSTALLED) TO BULKHEAD COUPLING.
INSTALL HOSE CLAMP ON HOSE OVER BULK HEAD COUPLING.
3
INSTALL BULKHEAD COUPLING USING (2) SCREWS.
INSTALL IN JACKET WITH THE BARBED FITTING
POINTED INTO THE VESTIBULE.
INSTALL
2
OPTION DRAIN RIGHT
DETERMINE RIGHT OR LEFT DRAIN OPTION.
LOCATE 7/8" HOLE IN JACKET SIDE.
REMOVE PLUG - DISCARD.
DRILL (2) Ø 1/8" HOLES FOR THE BULKHEAD COUPLING.
DRILL 1/8”
DRILL 1/8”
7
/8” PLUG
D
ISCARD
OPTION DRAIN LEFT
7/8” PLUG
DISCARD
1
INSTALL INTAKE COUPLING IN TOP PLATE.
INSTALL
UPFLOW VERTICAL VENT
NOTE: THESE CONVERSION INSTRUCTIONS ARE INTENTIONALLY GENERIC, SOME PARTS MAY BE DIFFERENT IN YOUR FURNACE
ST-A1194-28-03
PARTS NEEDED:
PARTS NEEDED FOR THIS CONVERSION REQUIRE ITEMS
FROM THE PARTS BAG ONLY. NO OTHER CONVERSION
KITS ARE NEEDED.
!
TUBE C
B
ULKHEAD
COUPLING
FROM PARTS BAG (PROVIDED WITH UNIT)
(X2)
#8 X 1/2"
SCREW
H
OSE
CLAMP
INTAKE
COUPLING
W/ NUT
DRILL
1/8" DRILL BIT
PLIERS
1/4" HEX HEAD DRIVER
TUBING CUTTER
TOOLS/MATERIALS NEEDED:
"*3
'
-08
(X3)
(X3)
HOSE -
DOUBLE ELBOW
1
2
HOSE -
D
OUBLE ELBOW
Field Conversions
15
ST-A1194-28-03
Notes:
Checklist:
__ ALL DRAIN PORTS ARE PLUGGED
__ UNIT HAS FORWARD PITCH
__ HEAT TAPE INSTALLED(IF REQUIRED)
__ VERIFY ALL HOSES ARE SECURE AND FULLY SEATED.
__ CONFIRM THAT ALL HOSES ARE FREE OF KINKS
__ CONFIRM ALL HOSES AND OTHER DRAIN PARTS HAVE A
SLOPE IN DIRECTION OF WATER FLOW
__ ALL CLAMPS AND COUPLINGS ARE TIGHTENED
Field Conversions
16
DRILL
1/8" DRILL BIT
PLIERS
FLAT HEAD SCREWDRIVER
5/16 HEX HEAD DRIVER
1/4" HEX HEAD DRIVER
TUBING CUTTER
TOOLS/MATERIALS NEEDED:
UPFLOW LEFT VENT
NOTE: THESE CONVERSION INSTRUCTIONS ARE INTENTIONALLY GENERIC, SOME PARTS MAY BE DIFFERENT IN YOUR FURNACE
ST-A1194-29-03
PARTS NEEDED:
(X2)
FROM PARTS BAG (PROVIDED W/UNIT)
INTAKE
COUPLING
W/ NUT
BULKHEAD
COUPLING
#8 X 1/2"
SCREW
TUBE C
HOSE
CLAMP
4
INSTALL BULKHEAD COUPLING USING (2) SCREWS.
INSTALL IN JACKET WITH THE BARBED FITTING
POINTED INTO THE VESTIBULE.
3
DETERMINE RIGHT OR LEFT DRAIN OPTION.
LOCATE 7/8" HOLE IN JACKET SIDE.
REMOVE PLUG - DISCARD.
DRILL (2)
ø1/8" HOLES FOR THE BULKHEAD COUPLING.
DRILL 1/8”
DISCARD
OPTION DRAIN RIGHT
DRILL 1/8”
DISCARD
OPTION DRAIN LEFT
2
2a - INSTALL 2-5/8" FLUSH MOUNT PLUG IN TOP PLATE.
2b - INSTALL 2" PIPE GROMMET AS SHOWN.
2c - INSTALL INTAKE COUPLING AS SHOWN.
2b
2c
2
a
2-5/8”
1a
1b
1c
1
1a - REMOVE FLUE TRANSITION, TRANSITION COUPLING, AND ELBOW.
(NOTE: REMOVE INDUCER COUPLING W/ELBOW FOR EASIER REMOVAL).
1b - REMOVE 3-3/8" FLUSH MOUNT PLUG FROM JACKET - DISCARD.
1c - RELOCATE 2-3/8" FLUSH MOUNT PLUG FROM JACKET TO TOP PLATE.
R
E
-LO
C
A
T
E
DISCARD
IDB COUPLING
(RETAIN)
FLUE TRANSITION
(DISCARD)
TRANSITION
COUPLING
(DISCARD)
ELBOW
(DISCARD)
FROM CONVERSION KIT RXGY-CK
2-3/8" PIPE
G
ROMMET
2-5/8" FLUSH
MOUNT PLUG
PARTS NEEDED FOR THIS
CONVERSION REQUIRE THE
OUTLINED ITEMS FROM THE PARTS BAG
AND CONVERSION KIT RXGY-CK. YOU
MUST HAVE THESE PARTS BEFORE
PROCEEDING.
!
"*3'
-08
IF THE IDB
COUPLING IS
REMOVED, IT
MUST BE
REPLACED IN
THE PROPER
ORIENTATION.
AN ARROW IS
PRESENT ON
THE COUPLING
TO INDICATE
THE DIRECTION
OF EXHAUST
FLOW. MAKE
SURE THE
ARROW POINTS
IN THE
CORRECT
DIRECTION.
NOTE:
(X3)
HOSE -
DOUBLE
ELBOW
SEE CRITICAL HOSE CLAMP LOCATION NOTE
IN THE GENERAL COVERSION INSTRUCTIONS.
Field Conversions
17
(
X3)
5B
HOSE A
T
UBE C
T
UBE C
C
UT TO FIT
CABINET WIDTH
5A
HOSE A
5
a - LEFT SIDE DRAIN OPTION
ATTACH HOSE A (PRE-INSTALLED) TO BULKHEAD COUPLING.
P
LACE CLAMP OVER HOSE ON BULKHEAD COUPLING.
Checklist:
ST-A1194-29-03
Notes:
NOTE: PLIERS NECCESSARY TO ADD OR REMOVE CLAMPS
HOSE -
DOUBLE ELBOW
1
2
5b - RIGHT SIDE DRAIN OPTION
5b1 - CUT TUBE “C” TO FIT CORRESPONDING CABINET WIDTH.
5b2 - INSERT TUBE “C” INTO END “2” OF HOSE- DOUBLE ELBOW
5b3 - SLIDE TWO WIRE CLAMPS OVER TUBE “C”, SLIDE ONE WIRE CLAMP OVER
END “1” OF HOSE - DOUBLE ELBOW.
5b4 - INSTALL TUBE “C” WITH HOSE CLAMP AS SHOWN TO HOSE “A” “PRE ASSEMBLED”.
5b5 - ATTACH HOSE - DOUBLE ELBOW TO BULKHEAD COUPLING POSITION WIRE HOSE
CLAMP.
__ VERIFY ALL HOSES ARE SECURE AND FULLY SEATED.
__ CONFIRM THAT ALL HOSES ARE FREE OF KINKS.
__ CONFIRM ALL HOSES AND OTHER DRAIN PARTS HAVE A
SLOPE IN DIRECTION OF WATER FLOW
__ BOTH WORM DRIVES ON THE HOSE CLAMPS OF THE IDB COUPLING
MUST BE LOCATED ON THE TOP OF THE COUPLING. SEE LOCATION
DETAIL IN THE GENERAL CONVERSION INSTRUCTIONS AT THE
BEGINNING OF THIS SECTION.
__ ALL CLAMPS AND COUPLINGS ARE TIGHTENED
__ ALL DRAIN PORTS ARE PLUGGED
__ UNIT HAS FORWARD PITCH
__ HEAT TAPE INSTALLED(IF REQUIRED)
Field Conversions
18
DOWNFLOW W/ RIGHT VENT (NON-ZERO CLEARANCE)
DOWNFLOW W/ RIGHT VENT (NON-ZERO CLEARANCE)
PARTS NEEDED FOR THIS CONVERSION REQUIRE ITEMS
DOWNFLOW W/ RIGHT VENT (NON-ZERO CLEARANCE)
PARTS NEEDED FOR THIS CONVERSION REQUIRE ITEMS
DOWNFLOW W/ RIGHT VENT (NON-ZERO CLEARANCE)
PARTS NEEDED FOR THIS CONVERSION REQUIRE ITEMS
DOWNFLOW W/ RIGHT VENT (NON-ZERO CLEARANCE)
PARTS NEEDED:
(X2)
F
ROM PARTS BAG (PROVIDED WITH UNIT)
3
*
"
8
0
-
'
(X3)
FROM THE
YOU MUST HAVE THE PARTS OUTLINED BELOW BEFORE
PROCEEDING.
!
PARTS NEEDED:
F
ROM PARTS BAG (PROVIDED WITH UNIT)
FROM THE PARTS BAG AND CONVERSION KIT
YOU MUST HAVE THE PARTS OUTLINED BELOW BEFORE
PROCEEDING.
HOSE -
D
OUBLE
ELBOW
AND CONVERSION KIT RXGY-CK.
YOU MUST HAVE THE PARTS OUTLINED BELOW BEFORE
FROM CONVERSION KIT RXGY-CK
2-5/8" FLUSH
2" PIPE GROMMET
#8 X 1/2"
SCREW
HOSE
CLAMP
FROM CONVERSION KIT RXGY-CK
2-5/8" FLUSH
#
8 X 1/2"
SCREW
(X4)
TUBE C
CONDENSATE
TRAP DRAIN
PLUG .559”
COUPLING
INTAKE AIR
DIFFUSER
CONDENSATE
TRAP BRACKET
INTAKE
COUPLING
W/ NUT
BULKHEAD
COUPLING
1/4" BLACK
CONDENSATE
TRAP BRACKET
NOTE: STEPS 1- 5 SHOWN WITH FURNACE IN “AS SHIPPED CONDITION”
NOTE: THESE CONVERSION INSTRUCTIONS ARE INTENTIONALLY GENERIC, SOME PARTS MAY BE DIFFERENT IN YOUR FURNACE
DRILL
(1) 1/8" DRILL BIT
TOOLS/MATERIALS NEEDED:
2-5/8" FLUSH
MOUNT PLUG
(
3.375)
NOTE: STEPS 1- 5 SHOWN WITH FURNACE IN “AS SHIPPED CONDITION”
NOTE: THESE CONVERSION INSTRUCTIONS ARE INTENTIONALLY GENERIC, SOME PARTS MAY BE DIFFERENT IN YOUR FURNACE
(1) 3/16" DRILL BIT
PLIERS
TOOLS/MATERIALS NEEDED:
2-5/8" FLUSH
MOUNT PLUG
NOTE: STEPS 1- 5 SHOWN WITH FURNACE IN “AS SHIPPED CONDITION”
NOTE: THESE CONVERSION INSTRUCTIONS ARE INTENTIONALLY GENERIC, SOME PARTS MAY BE DIFFERENT IN YOUR FURNACE
(1) 1/4" HEX HEAD DRIVER
(1) 5/16 HEX HEAD DRIVER
TOOLS/MATERIALS NEEDED:
5/8" DRAIN
HOSE B
NOTE: THESE CONVERSION INSTRUCTIONS ARE INTENTIONALLY GENERIC, SOME PARTS MAY BE DIFFERENT IN YOUR FURNACE
FLAT HEAD SCREWDRIVER
TUBING CUTTER
TRAP BRACKET
(DOWN FLOW)
1/2" DRAIN
HOSE E
NOTE: THESE CONVERSION INSTRUCTIONS ARE INTENTIONALLY GENERIC, SOME PARTS MAY BE DIFFERENT IN YOUR FURNACE
FLAT HEAD SCREWDRIVER
1/4" BLACK
VENT TUBE
TRAP BRACKET
(DOWN FLOW)
1
1a
TRANSITION
COUPLING
(DISCARD)
FLUE TRANSITION (DISCARD)
ELBOW (DISCARD)
IDB COUPLING
(RETAIN)
2
2-5/8"
TRANSITION
COUPLING
(DISCARD)
FLUE TRANSITION (DISCARD)
ELBOW (DISCARD)
IDB COUPLING
(RETAIN)
2d
2-5/8"
INSTALL
1b
VENT HOSE
(DISCARD)
HOSE “D”
(RETAIN)
DISCARD
2a
VENT HOSE
(DISCARD)
HOSE “D”
(RETAIN)
IF THE IDB COUPLING IS
REMOVED, IT MUST BE
REPLACED IN THE PROPER
ORIENTATION. AN ARROW IS
PRESENT ON THE COUPLING
TO INDICATE THE DIREC-
NOTE:
2c
IF THE IDB COUPLING IS
REMOVED, IT MUST BE
REPLACED IN THE PROPER
ORIENTATION. AN ARROW IS
PRESENT ON THE COUPLING
TO INDICATE THE DIREC-
M
O
V
2b
1a - REMOVE FLUE TRANSITION, TRANSITION COUPLING, AND ELBOW.
(NOTE: REMOVE COUPLING ON INDUCER WITH ELBOW FOR EASIER REMOVAL)
1b - REMOVE TRAP AND HOSES. RETAIN HOSE D FOR LATER USE.
(NOTE:TO REMOVE TRAP REMOVE (2) SCREWS AND PULL STRAIGHT OUT).
1a - REMOVE FLUE TRANSITION, TRANSITION COUPLING, AND ELBOW.
(NOTE: REMOVE COUPLING ON INDUCER WITH ELBOW FOR EASIER REMOVAL)
1b - REMOVE TRAP AND HOSES. RETAIN HOSE D FOR LATER USE.
(NOTE:TO REMOVE TRAP REMOVE (2) SCREWS AND PULL STRAIGHT OUT).
2a-REMOVE 3-3/8" FLUSH MOUNT PLUG FROM JACKET - DISCARD.
2b-RELOCATE 2-3/8" FLUSH MOUNT PLUG FROM JACKET TO TOP PLATE.
2c-RELOCATE 1/2" VINYL CAP (YELLOW) IN INDUCER COUPLING.
2d-INSTALL 2-5/8" FLUSH PLUG IN TOP PLATE.
1a - REMOVE FLUE TRANSITION, TRANSITION COUPLING, AND ELBOW.
(NOTE: REMOVE COUPLING ON INDUCER WITH ELBOW FOR EASIER REMOVAL).
1b - REMOVE TRAP AND HOSES. RETAIN HOSE D FOR LATER USE.
(NOTE:TO REMOVE TRAP REMOVE (2) SCREWS AND PULL STRAIGHT OUT).
TION OF EXHAUST FLOW.
MAKE SURE THE ARROW
POINTS IN THE CORRECT
DIRECTION.
2a-REMOVE 3-3/8" FLUSH MOUNT PLUG FROM JACKET - DISCARD.
2b-RELOCATE 2-3/8" FLUSH MOUNT PLUG FROM JACKET TO TOP PLATE.
2c-RELOCATE 1/2" VINYL CAP (YELLOW) IN INDUCER COUPLING.
2d-INSTALL 2-5/8" FLUSH PLUG IN TOP PLATE.
TION OF EXHAUST FLOW.
MAKE SURE THE ARROW
POINTS IN THE CORRECT
ST-A1194-30-02
2a-REMOVE 3-3/8" FLUSH MOUNT PLUG FROM JACKET - DISCARD.
2b-RELOCATE 2-3/8" FLUSH MOUNT PLUG FROM JACKET TO TOP PLATE.
2c-RELOCATE 1/2" VINYL CAP (YELLOW) IN INDUCER COUPLING.
Field Conversions
19
ST-A1194-30-02
ROTATE
UNIT
5b
5a
5a - PRE-DRILL (2) Ø 3/16" HOLES IN JACKET AS SHOWN FOR CONDENSATE TRAP BRACKET.
5b - ROTATE UNIT 180°
DRILL (2)
Ø3/16" HOLES
5
.559
DRAIN PLUG
4c
4a
4b
DISCARD
4a - REMOVE THE SMALL MOUNTING BRACKET AND THE .403"
DRAIN PLUG - DISCARD.
4b - INSTALL THE DOWN FLOW CONDENSATE TRAP BRACKET WITH
(2) SCREWS AS SHOWN.
4c - INSTALL .559" DRAIN PLUG IN THE CONDENSATE TRAP.
4
3d
3c
3a
3
b
3a - RELOCATE .403" DRAIN PLUG IN THE COLLECTOR BOX.
3b - INSTALL 2" PIPE GROMMET
3c - INTAKE COUPLING IN JACKET AS SHOWN.
3d - INSERT AIR DIFFUSER INTO COUPLING UNTIL TABS ARE SEATED.
3
INSERT AIR
DIFFUSER UNTIL
TABS ARE FULLY
SEATED
INSTALL
M
O
V
E
NOTE:
DIFFUSER MAY HAVE A TENDENCEY TO FALL
OUT OF THE COUPLING AT THIS STEP. THE
INSTALLER MAY ELECT TO INSTALL THE
DIFFUSER AFTER ROTATING THE FURNACE
TO THE HORIZONTAL POSITION.
Field Conversions
20
9b - RIGHT SIDE DRAIN OPTION
ATTACH HOSE A (FACTORY INSTALLED) TO BULKHEAD COUPLING.
OPTION
9b
DRAIN RIGHT SIDE
HOSE A
ATTACH SIDE "2" TO BULKHEAD
COUPLING
OPTION
DRAIN LEFT SIDE
9a
TUBE C
CUT TO FIT
CABINET WIDTH
1
2
TUBE C
HOSE B
8
INSTALL BULKHEAD COUPLING USING (2) SCREWS.
INSTALL IN JACKET WITH THE BARBED FITTING
POINTED INTO THE VESTIBULE.
INSTALL
1/8" DRILL
DISCARD
7/8" PLUG
1/8" DRILL
DISCARD
7/8" PLUG
DETERMINE RIGHT OR LEFT DRAIN OPTION.
LOCATE 7/8" HOLE IN JACKET SIDE AND REMOVE PLUG - DISCARD.
DRILL (2)
1/8" HOLES FOR BULKHEAD COUPLING.
OPTION: RIGHT DRAIN
OPTION: LEFT DRAIN
7
6
b
6
e
6
d
6
c
6
HOSE E
HOSE D
6b - INSTALL CONDENSATE TRAP BY MOUNTING BRACKET TO JACKET USING (2) SCREWS
6c - CUT 1/4” VENT TUBE TO FIT (APPROX. 10-1/2"). INSTALL AS SHOWN.
6d - INSTALL HOSE D (REMOVED IN STEP 1) FROM INDUCER COUPLING TO THE FLUE
TAP IN THE CONDENSATE TRAP.
6e - INSTALL HOSE E FROM COLLECTOR BOX TO TOP OF CONDENSATE TRAP.
-2010°
APPROXIMATELY 10-20° TILT
O
N INDUCER COUPLING
GROUND
ROTATE INDUCER COUPLING TO ENSURE
DOWNWARD FLOW OF CONDENSATE FROM
FLUE VENTING
6a
N
OTE:
USE SOAPY WATER TO FACILITATE EASY
H
OSE AND TUBE ASSEMBLY
1/4” TUBE CUT
TO FIT (APPROX
10-1/2”)
ST-A1194-30-02
NOTE: REMAINING STEPS SHOWN WITH FURNACE IN DOWN FLOW ORIENTATION
S
EE CRITICAL HOSE CLAMP LOCATION NOTE
IN THE GENERAL COVERSION INSTRUCTIONS.
(X3)
9a - LEFT SIDE DRAIN OPTION.
9a-1 - REMOVE HOSE “A” (FACTORY INSTALLED) ON CONDENSATE TRAP & REPLACE
WITH HOSE “B” REUSING SUPPLIED CLAMP.
9a-2 - CUT TUBE “C” ON MARKED LINES CORRESPONDING TO CABINET WIDTH.
9a-3 - SLIDE (2) WIRE CLAMPS OVER TUBE “C” AND (1) WIRE CLAMP OVER
SIDE “2” OF HOSE-DOUBLE ELBOW.
9a-4 - CONNECT HOSE - DOUBLE ELBOW END “1” TO TUBE “C”, CONNECT END
“2” TO BULKHEAD COUPLING. CONFIRM ALL (4) CLAMPS ARE PLACED
CORRECTLY.
NOTE: PLIERS NECCESSARY TO ADD OR REMOVE CLAMPS
Field Conversions
21
ST-A1194-30-02
Notes:
Checklist:
__ VERIFY ALL HOSES ARE SECURE AND FULLY SEATED.
_
_ ALL DRAIN PORTS ARE PLUGGED
__ UNIT HAS FORWARD PITCH
__ HEAT TAPE INSTALLED(IF REQUIRED)
__ CONFIRM THAT ALL HOSES ARE FREE OF KINKS
__ CONFIRM ALL HOSES AND OTHER DRAIN PARTS HAVE A
SLOPE IN DIRECTION OF WATER FLOW
__ BOTH WORM DRIVES ON THE HOSE CLAMPS OF THE IDB COUPLING
MUST BE LOCATED ON THE TOP OF THE COUPLING. SEE LOCATION
DETAIL IN THE GENERAL CONVERSION INSTRUCTIONS AT THE
BEGINNING OF THIS SECTION
__ ALL CLAMPS AND COUPLINGS ARE TIGHTENED
__ DOUBLE CHECK DIFFUSER IS INSTALLED IN INTAKE COUPLING
Field Conversions
22
DOWN FLOW ZERO CLEARANCE
DOWN FLOW ZERO CLEARANCE
PARTS NEEDED FOR THIS CONVERSION REQUIRE ITEMS
FROM THE PARTS BAG
!
DOWN FLOW ZERO CLEARANCE
PARTS NEEDED FOR THIS CONVERSION REQUIRE ITEMS
PARTS BAG, CONVERSION KIT RXGY-CK
DOWN FLOW ZERO CLEARANCE
PARTS NEEDED FOR THIS CONVERSION REQUIRE ITEMS
AND RXGY-ZK
FROM PARTS BAG(PROVIDED W/UNIT)
COUPLING
3
*
"
8
0
-
'
PARTS NEEDED:
FROM PARTS BAG(PROVIDED W/UNIT)
INTAKE
COUPLING
W/ NUT
BULKHEAD
COUPLING
PARTS NEEDED:
FROM PARTS BAG(PROVIDED W/UNIT)
#8 X 1/2"
SCREW
(X2)
HOSE
C
LAMP
PARTS NEEDED:
FROM THE PARTS BAG
YOU MUST HAVE THE OUTLINED PARTS FROM THESE KITS BEFORE PROCEEDING.
!
(X3)
TUBE C
PARTS BAG, CONVERSION KIT RXGY-CK
YOU MUST HAVE THE OUTLINED PARTS FROM THESE KITS BEFORE PROCEEDING.
HOSE -
DOUBLE ELBOW
INTAKE AIR
DIFFUSER
AND RXGY-ZK.
YOU MUST HAVE THE OUTLINED PARTS FROM THESE KITS BEFORE PROCEEDING.
HOSE -
DOUBLE ELBOW
F
ROM CONVERSION KIT RXGY-CK
2-5/8" FLUSH
MOUNT PLUG
#8 X 1/2"
SCREW
(X4)
FROM ZERO-CLEARANCE CONVERSION KIT RXGY-ZK
F
ROM CONVERSION KIT RXGY-CK
1/4" BLACK
VENT TUBING
#8 X 1/2"
SCREW
FROM ZERO-CLEARANCE CONVERSION KIT RXGY-ZK
.559" CONDENSATE
TRAP DRAIN PLUG
5/8" DRAIN
HOSE B
1/2" DRAIN
HOSE E
.559" CONDENSATE
TRAP DRAIN PLUG
CONDENSATE
TRAP BRACKET
(
DOWN FLOW)
O-RING
#8 X 1/2"
SCREW
(X10)
ELECTRIC DRILL
TOOLS/MATERIALS NEEDED:
PIPE
COLLAR/GASKET
ASSEMBLY
(X2)
TOOLS/MATERIALS NEEDED:
3/16" DRILL BIT
INTAKE
PIPE
TOOLS/MATERIALS NEEDED:
TUBING CUTTER
1/4" HEX HEAD DRIVER
5/16 HEX HEAD DRIVER
INTAKE
FLUE PIPE
ASSEMBLY
PVC GLUE AND PRIMER
HAMMER
1/4" HEX HEAD DRIVER
5/16 HEX HEAD DRIVER
W/ O-RING
FLUE PIPE
ASSEMBLY
PVC GLUE AND PRIMER
W/ O-RING
O-RING
1/8" DRILL BIT
1
NOTE: STEPS 1- 4 SHOWN WITH FURNACE IN “AS SHIPPED CONDITION”
NOTE: THESE CONVERSION INSTRUCTIONS ARE INTENTIONALLY GENERIC, SOME PARTS MAY BE DIFFERENT IN YOUR FURNACE
PLIERS
TRANSITION
COUPLING
(RETAIN)
FLUE TRANSITION (DISCARD)
ELBOW “RETAIN”
NOTE: STEPS 1- 4 SHOWN WITH FURNACE IN “AS SHIPPED CONDITION”
NOTE: THESE CONVERSION INSTRUCTIONS ARE INTENTIONALLY GENERIC, SOME PARTS MAY BE DIFFERENT IN YOUR FURNACE
5/16 HEX HEAD DRIVER
TRANSITION
COUPLING
(RETAIN)
FLUE TRANSITION (DISCARD)
ELBOW “RETAIN”
2
2a
NOTE: STEPS 1- 4 SHOWN WITH FURNACE IN “AS SHIPPED CONDITION”
NOTE: THESE CONVERSION INSTRUCTIONS ARE INTENTIONALLY GENERIC, SOME PARTS MAY BE DIFFERENT IN YOUR FURNACE
FLAT HEAD SCREWDRIVER
5/16 HEX HEAD DRIVER
2-5/8"
2a
INSTALL
NOTE: THESE CONVERSION INSTRUCTIONS ARE INTENTIONALLY GENERIC, SOME PARTS MAY BE DIFFERENT IN YOUR FURNACE
FLAT HEAD SCREWDRIVER
O
V
E
2c
NOTE: THESE CONVERSION INSTRUCTIONS ARE INTENTIONALLY GENERIC, SOME PARTS MAY BE DIFFERENT IN YOUR FURNACE
1a
1b
IDB COUPLING
(RETAIN)
VENT HOSE
(RETAIN)
HOSE “D”
(RETAIN)
IDB COUPLING
(RETAIN)
VENT HOSE
(RETAIN)
HOSE “D”
(RETAIN)
M
O
2d
1a - REMOVE ELBOW, (2) COUPLINGS, AND FLUE TRANSITION.
(RETAIN ELBOW AND COUPLINGS FOR LATER USE.)
(NOTE: REMOVE COUPLING ON INDUCER WITH ELBOW
FOR EASIER REMOVAL).
1b - REMOVE TRAP AND HOSES. RETAIN HOSE D FOR LATER USE.
(NOTE: TO REMOVE TRAP REMOVE (2) SCREWS AND PULL STRAIGHT OUT).
1a - REMOVE ELBOW, (2) COUPLINGS, AND FLUE TRANSITION.
(RETAIN ELBOW AND COUPLINGS FOR LATER USE.)
(NOTE: REMOVE COUPLING ON INDUCER WITH ELBOW
1b - REMOVE TRAP AND HOSES. RETAIN HOSE D FOR LATER USE.
(NOTE: TO REMOVE TRAP REMOVE (2) SCREWS AND PULL STRAIGHT OUT).
1b - REMOVE TRAP AND HOSES. RETAIN HOSE D FOR LATER USE.
(NOTE: TO REMOVE TRAP REMOVE (2) SCREWS AND PULL STRAIGHT OUT).
2a - INSTALL 2-5/8" FLUSH MOUNT PLUG.
2b - REMOVE LEFT 2-3/8" FLUSH PLUG IN BLOWER SHELF - DISCARD.
2c - RELOCATE RIGHT 2-3/8" FLUSH MOUNT PLUG FROM BLOWER SHELF TO
TOP PLATE.
2d - RELOCATE .403" DRAIN PLUG IN THE COLLECTOR BOX.
2a - INSTALL 2-5/8" FLUSH MOUNT PLUG.
2b - REMOVE LEFT 2-3/8" FLUSH PLUG IN BLOWER SHELF - DISCARD.
2c - RELOCATE RIGHT 2-3/8" FLUSH MOUNT PLUG FROM BLOWER SHELF TO
TOP PLATE.
2d - RELOCATE .403" DRAIN PLUG IN THE COLLECTOR BOX.
DISCARD
2b
2b - REMOVE LEFT 2-3/8" FLUSH PLUG IN BLOWER SHELF - DISCARD.
2c - RELOCATE RIGHT 2-3/8" FLUSH MOUNT PLUG FROM BLOWER SHELF TO
2d - RELOCATE .403" DRAIN PLUG IN THE COLLECTOR BOX.
ST-A1194-31-04
Field Conversions
23
3
4
IF THE IDB COUPLING IS
REMOVED, IT MUST BE
REPLACED IN THE PROPER
O
RIENTATION. AN ARROW IS
NOTE:
IF THE IDB COUPLING IS
REMOVED, IT MUST BE
REPLACED IN THE PROPER
O
RIENTATION. AN ARROW IS
NOTE:
ST
ALL
4a
O
4
b
O
RIENTATION. AN ARROW IS
PRESENT ON THE COUPLING
TO INDICATE THE DIRECTION OF EXHAUST FLOW.
MAKE SURE THE ARROW
P
OINTS IN THE CORRECT
DIRECTION.
O
RIENTATION. AN ARROW IS
PRESENT ON THE COUPLING
TO INDICATE THE DIRECTION OF EXHAUST FLOW.
MAKE SURE THE ARROW
P
OINTS IN THE CORRECT
DIRECTION.
5
INSTALL HOSE E ON COLLECTOR BOX AS SHOWN.
LET THE OPEN END HANG FREE UNTIL STEP 11.
NOTE:
USE SOAPY WATER TO FACILITATE EASY HOSE AND TUBE ASSEMBLY
RELOCATE JUNCTION BOX AND DOOR SWITCH
SEE ELECTRICAL WIRING SECTION
REMOVE KNOCKOUTS
INSTALL HOSE E ON COLLECTOR BOX AS SHOWN.
LET THE OPEN END HANG FREE UNTIL STEP 11.
USE SOAPY WATER TO FACILITATE EASY HOSE AND TUBE ASSEMBLY
RELOCATE JUNCTION BOX AND DOOR SWITCH
SEE ELECTRICAL WIRING SECTION
REMOVE KNOCKOUTS
5
b
4a - RE-INSTALL ELBOW AND COUPLINGS (REMOVED IN STEP 1) IN THE
ORIENTATION AS SHOWN.
4b - RELOCATE 1/2" VINYL CAP (YELLOW) ON INDUCER COUPLING TO
OPPOSITE SIDE.
NOTE: LEAVE COUPLING CLAMP CONNECTIONS LOOSE UNTIL STEP 11.
USE SOAPY WATER TO FACILITATE EASY HOSE AND TUBE ASSEMBLY
RELOCATE JUNCTION BOX AND DOOR SWITCH
4a - RE-INSTALL ELBOW AND COUPLINGS (REMOVED IN STEP 1) IN THE
ORIENTATION AS SHOWN.
4b - RELOCATE 1/2" VINYL CAP (YELLOW) ON INDUCER COUPLING TO
NOTE: LEAVE COUPLING CLAMP CONNECTIONS LOOSE UNTIL STEP 11.
4a - RE-INSTALL ELBOW AND COUPLINGS (REMOVED IN STEP 1) IN THE
4b - RELOCATE 1/2" VINYL CAP (YELLOW) ON INDUCER COUPLING TO
NOTE: LEAVE COUPLING CLAMP CONNECTIONS LOOSE UNTIL STEP 11.
ROTATE
UNIT
5a
SEE ELECTRICAL WIRING SECTION
FOR INSTRUCTIONS
5c
SEE ELECTRICAL WIRING SECTION
FOR INSTRUCTIONS
5c
DRILL (2)
1/8" HOLES
IN BLOWER
SHELF
5d
6
5a - ROTATE UNIT 180°
5b - REMOVE KNOCKOUTS WITH HAMMER AND FLAT HEAD SCREWDRIVER.
5c - THE JUNCTION BOX WILL HAVE TO BE RELOCATED FOR FLUE PIPE INSTALLATION.
SEE ELECTRICAL WIRING SECTION FOR INSTRUCTIONS.
5d - RE-DRILL (2) Ø1/8" HOLES IN BLOWER SHELF AS SHOWN FOR FLUE PIPE ASSEMBLY.
5e - PRE-DRILL (2) Ø3/16" HOLES IN JACKET AS SHOWN FOR CONDENSATE TRAP BRACKET.
5b - REMOVE KNOCKOUTS WITH HAMMER AND FLAT HEAD SCREWDRIVER.
5c - THE JUNCTION BOX WILL HAVE TO BE RELOCATED FOR FLUE PIPE INSTALLATION.
SEE ELECTRICAL WIRING SECTION FOR INSTRUCTIONS.
5d - RE-DRILL (2) Ø1/8" HOLES IN BLOWER SHELF AS SHOWN FOR FLUE PIPE ASSEMBLY.
5e - PRE-DRILL (2) Ø3/16" HOLES IN JACKET AS SHOWN FOR CONDENSATE TRAP BRACKET.
7
7b
5b - REMOVE KNOCKOUTS WITH HAMMER AND FLAT HEAD SCREWDRIVER.
5c - THE JUNCTION BOX WILL HAVE TO BE RELOCATED FOR FLUE PIPE INSTALLATION.
5d - RE-DRILL (2) Ø1/8" HOLES IN BLOWER SHELF AS SHOWN FOR FLUE PIPE ASSEMBLY.
5e - PRE-DRILL (2) Ø3/16" HOLES IN JACKET AS SHOWN FOR CONDENSATE TRAP BRACKET.
DRILL (2)
3/16" HOLES
5e
DIFFUSER
FULLY SEATED
.559
DRAIN PLUG
(X2)
.559
DRAIN PLUG
7a
7c
DISCARD
7c
FULLY SEATED
INSTALL INTAKE COUPLING IN BLOWER
SHELF HOLE AS SHOWN.
INSERT AIR DIFFUSER INTO COUPLING
UNTIL TABS ARE SEATED.
INSTALL INTAKE COUPLING IN BLOWER
INSERT AIR DIFFUSER INTO COUPLING
7a - REMOVE THE SMALL MOUNTING BRACKET AND THE .403" DRAIN PLUG - DISCARD.
7b - INSTALL .559" DRAIN PLUG IN CONDENSATE TRAP.
7c - INSTALL DOWN FLOW CONDENSATE TRAP BRACKET WITH (2) SCREWS AS SHOWN.
7a - REMOVE THE SMALL MOUNTING BRACKET AND THE .403" DRAIN PLUG - DISCARD.
7b - INSTALL .559" DRAIN PLUG IN CONDENSATE TRAP.
7c - INSTALL DOWN FLOW CONDENSATE TRAP BRACKET WITH (2) SCREWS AS SHOWN.
7a - REMOVE THE SMALL MOUNTING BRACKET AND THE .403" DRAIN PLUG - DISCARD.
7c - INSTALL DOWN FLOW CONDENSATE TRAP BRACKET WITH (2) SCREWS AS SHOWN.
ST-A1194-31-04
Field Conversions
24
8
1
/8" DRILL
1/8" DRILL
DISCARD
DISCARD
7/8" PLUG
9
DETERMINE RIGHT OR LEFT DRAIN OPTION.
LOCATE 7/8" HOLE IN JACKET SIDE REMOVE PLUG - DISCARD.
DRILL (2)
1/8" HOLES FOR THE BULKHEAD COUPLING.
LEFT DRAIN OPTION
7/8" PLUG
DETERMINE RIGHT OR LEFT DRAIN OPTION.
LOCATE 7/8" HOLE IN JACKET SIDE REMOVE PLUG - DISCARD.
1/8" HOLES FOR THE BULKHEAD COUPLING.
LEFT DRAIN OPTION
RIGHT DRAIN OPTIONRIGHT DRAIN OPTION
INSTALL BULKHEAD COUPLING USING (2) SCREWS.
INSTALL IN JACKET WITH THE BARBED FITTING POINTED INTO THE VESTIBULE.
INSTALL BULKHEAD COUPLING USING (2) SCREWS.
INSTALL IN JACKET WITH THE BARBED FITTING POINTED INTO THE VESTIBULE.
INSTALL IN JACKET WITH THE BARBED FITTING POINTED INTO THE VESTIBULE.
10
COVER PLATE
“BOTTOM
10a
“BOTTOM”
PRE-DRILL 1/8"
HOLES AND
ATTACH W/SCREWS
(2) PLACES
X10
O-RING
PVC GLUE JOINTPVC GLUE JOINT
10b
INSTALL
SCREWS
10c
10a - INSTALL INTAKE PIPE
SLIDE INTAKE PIPE THROUGH THE LEFT SIDE KNOCKOUT ON COVER PLATE CLEAN AND PVC GLUE TO INTAKE COUPLING AS SHOWN
10b - INSTALL FLUE PIPE ASSEMBLY
INSERT FLUE PIPE ASSEMBLY THROUGH RIGHT SIDE KNOCKOUT ON COVER PLATE (NOTE: SLIDE FROM UNDER PLATE).
SLIDE ANGLED END THROUGH OPENING IN BLOWER SHELF AND ALIGN WITH ELBOW COUPLING.
SECURE PIPE ASSEMBLY TO BLOWER SHELF WITH (2) SCREWS AS SHOWN. ENSURE O-RING IS PROPERLY SEATED.
10c - SLIDE PIPE COLLAR ASSEMBLIES FROM STEP 7 OVER THE (2) PIPES AND DRILL (8)
PVC GLUE JOINT
SLIDE INTAKE PIPE THROUGH THE LEFT SIDE KNOCKOUT ON COVER PLATE CLEAN AND PVC GLUE TO INTAKE COUPLING AS SHOWN
10b - INSTALL FLUE PIPE ASSEMBLY
INSERT FLUE PIPE ASSEMBLY THROUGH RIGHT SIDE KNOCKOUT ON COVER PLATE (NOTE: SLIDE FROM UNDER PLATE).
SLIDE ANGLED END THROUGH OPENING IN BLOWER SHELF AND ALIGN WITH ELBOW COUPLING.
SECURE PIPE ASSEMBLY TO BLOWER SHELF WITH (2) SCREWS AS SHOWN. ENSURE O-RING IS PROPERLY SEATED.
10c - SLIDE PIPE COLLAR ASSEMBLIES FROM STEP 7 OVER THE (2) PIPES AND DRILL (8)
PVC GLUE JOINT
SLIDE INTAKE PIPE THROUGH THE LEFT SIDE KNOCKOUT ON COVER PLATE CLEAN AND PVC GLUE TO INTAKE COUPLING AS SHOWN
INSERT FLUE PIPE ASSEMBLY THROUGH RIGHT SIDE KNOCKOUT ON COVER PLATE (NOTE: SLIDE FROM UNDER PLATE).
SLIDE ANGLED END THROUGH OPENING IN BLOWER SHELF AND ALIGN WITH ELBOW COUPLING.
SECURE PIPE ASSEMBLY TO BLOWER SHELF WITH (2) SCREWS AS SHOWN. ENSURE O-RING IS PROPERLY SEATED.
10c - SLIDE PIPE COLLAR ASSEMBLIES FROM STEP 7 OVER THE (2) PIPES AND DRILL (8)
SLIDE INTAKE PIPE THROUGH THE LEFT SIDE KNOCKOUT ON COVER PLATE CLEAN AND PVC GLUE TO INTAKE COUPLING AS SHOWN
INSERT FLUE PIPE ASSEMBLY THROUGH RIGHT SIDE KNOCKOUT ON COVER PLATE (NOTE: SLIDE FROM UNDER PLATE).
SECURE PIPE ASSEMBLY TO BLOWER SHELF WITH (2) SCREWS AS SHOWN. ENSURE O-RING IS PROPERLY SEATED.
SLIDE INTAKE PIPE THROUGH THE LEFT SIDE KNOCKOUT ON COVER PLATE CLEAN AND PVC GLUE TO INTAKE COUPLING AS SHOWN
ST-A1194-31-04
Field Conversions
25
11
SEE CRITICAL HOSE CLAMP
1/4” TUBE CUT
APPROXIMATLY 10-20° TILT
11a
APPROXIMATLY 10-20° TILT
LOCATION NOTE IN THE
GENERAL CONVERSION
INSTRUCTIONS.
HOSE D
I
N
T
S
A
L
L
1
1
d
)
HOSE E
A
A
L
L
11c
1/4” TUBE CUT
TO FIT (APPROX
1
1
e
10°
ON INDUCER COUPLING
ROTATE INDUCER COUPLING TO ENSURE
DOWNWARD FLOW OF CONDENSATE FROM
-2010°
ON INDUCER COUPLING
GROUND
ROTATE INDUCER COUPLING TO ENSURE
DOWNWARD FLOW OF CONDENSATE FROM
1
1b - INSTALL CONDENSATE TRAP BY MOUNTING
BRACKET TO JACKET USING (2) SCREWS.
11c - CUT 1/4" VENT TUBE TO FIT (APPROX.10-1/2").
INSTALL AS SHOWN.
11a - ROTATE INDUCER COUPLING 10°
! NOTE: TIGHTEN ELBOW COUPLING CLAMPS TO
FLUE PIPE WITH 5/16" NUT DRIVER. (NOT SHOWN)
FLUE VENTING
1
1b - INSTALL CONDENSATE TRAP BY MOUNTING
BRACKET TO JACKET USING (2) SCREWS.
11c - CUT 1/4" VENT TUBE TO FIT (APPROX.10-1/2").
11a - ROTATE INDUCER COUPLING 10°
! NOTE: TIGHTEN ELBOW COUPLING CLAMPS TO
FLUE PIPE WITH 5/16" NUT DRIVER. (NOT SHOWN)
NOTE:
USE SOAPY WATER TO FACILITATE EASY HOSE AND TUBE ASSEMBLY
ELBOW NOT SHOWN
FOR CLARITY
USE SOAPY WATER TO FACILITATE EASY HOSE AND TUBE ASSEMBLY
ELBOW NOT SHOWN
11b
USE SOAPY WATER TO FACILITATE EASY HOSE AND TUBE ASSEMBLY
11e - ATTACH HOSE E TO THE TOP OF
CONDENSATE TRAP.
11d - INSTALL HOSE D (REMOVED IN STEP 1) FROM
TRANSITION COULPLING TO THE FLUE TAP ON
THE CONDENSATE TRAP.
11e - ATTACH HOSE E TO THE TOP OF
11d - INSTALL HOSE D (REMOVED IN STEP 1) FROM
TRANSITION COULPLING TO THE FLUE TAP ON
THE CONDENSATE TRAP.
12a
ATTACH SIDE
"2" TO BULKHEAD
COUPLING
OPTION
DRAIN LEFT
SIDE
ATTACH SIDE
"2" TO BULKHEAD
COUPLING
TUBE “C”
CUT TO FIT
CABINET WIDTH
12b
OPTION
DRAIN RIGHT
SIDE
HOSE “B”
(X3)
HOSE A
NOTE: PLIERS NECCESSARY TO ADD OR REMOVE CLAMPS
NOTE: PLIERS NECCESSARY TO ADD OR REMOVE CLAMPS
NOTE: PLIERS NECCESSARY TO ADD OR REMOVE CLAMPS
ST-A1194-31-04
Field Conversions
26
ST-A1194-31-04
Notes:
Checklist:
_
_ VERIFY ALL HOSES ARE SECURE AND FULLY SEATED.
__ CONFIRM THAT ALL HOSES ARE FREE OF KINKS.
__ CONFIRM ALL HOSES AND OTHER DRAIN PARTS HAVE A
SLOPE IN DIRECTION OF WATER FLOW.
__ BOTH WORM DRIVES ON THE HOSE CLAMPS OF THE IDB COUPLING
MUST BE LOCATED ON THE TOP OF THE COUPLING. SEE LOCATION
DETAIL IN THE GENERAL CONVERSION INSTRUCTIONS AT THE
BEGINNING OF THIS SECTION.
__ ALL DRAIN PORTS ARE PLUGGED.
__ UNIT HAS FORWARD PITCH.
__ HEAT TAPE INSTALLED(IF REQUIRED).
__ ALL CLAMPS AND COUPLINGS ARE TIGHTENED
Field Conversions
27
PARTS NEEDED:
PARTS NEEDED FOR THIS CONVERSION REQUIRE ITEMSFROM THE PARTS BAG AND CONVERSION KIT RXGY-CK.YOU MUST HAVE THE PARTS OUTLINED BELOW BEFORE PROCEEDING.
!
NOTE: STEPS 1- 5 SHOWN WITH FURNACE IN “AS SHIPPED CONDITION”
NOTE: THESE CONVERSION INSTRUCTIONS ARE INTENTIONALLY GENERIC, SOME PARTS MAY BE DIFFERENT IN YOUR FURNACE
HORIZONTAL RIGHT / RIGHT VENT
ST-A1194-32-01
2
2a - RELOCATE 1/2" VINYL CAP (YELLOW) ON THE
INDUCER COUPLING
2b - RELOCATE THE .403" DRAIN PLUG IN THE
COLLECTOR BOX.
2c - RELOCATE 1/4" VINYL CAP (YELLOW) ON
COLLECTOR BOX VENT TAP.
2a
2b
2c
MOVE
MOVE
MOVE
1
1a - REMOVE TRAP AND HOSES
(NOTE: TO REMOVE TRAP, REMOVE (2) SCREWS
AND PULL STRAIGHT OUT)
1b - INSTALL INTAKE COUPLING IN TOP PLATE
AS SHOWN.
1a
1b
HOSE “D” (DISCARD)
VENT HOSE (DISCARD)
DRILL
1/8" DRILL BIT
PLIERS
FLAT HEAD SCREWDRIVER
5/16 HEX HEAD DRIVER
1/4" HEX HEAD DRIVER
TOOLS/MATERIALS NEEDED:
C
ONDENSATE
TRAP GASKET
.559 DRAIN PLUG
#8 X 1/2"
SCREW
(X3)
1/4" BLACK
VENT TUBE
1
/2" DRAIN
HOSE E
1
/2" DRAIN
HOSE F
FROM CONVERSION KIT RXGY-CK
INTAKE
COUPLING
A
ND NUT
F
ROM PARTS BAG
(PROVIDED WITH UNIT)
AIRFLOW
PARTS NEEDED FOR THIS CONVERSION REQUIRE ITEMS
ROM THE PARTS BAG AND CONVERSION KIT RXGY-CK.
F
OU MUST HAVE THE PARTS OUTLINED BELOW BEFORE PROCEEDING.
Y
Field Conversions
28
SEE CRITICAL HOSE CLAMP LOCATION NOTE IN
THE GENERAL CONVERSION INSTRUCTIONS.
5
CUT
IF REQ’D.
INSTALL
HOSE E
HOSE F
CUT
INSTALL
CUT
INSTALL
ROTATE
UNIT 90°
5a - ROTATE UNIT 90
5b - CUT 1/4" VENT HOSE TO FIT (APPROX. 5-1/2") AND INSTALL AS SHOWN.
5c - CUT HOSE E AT LINE 1- INSTALL
NOTE: MAKE SURE CUT IS STRAIGHT AND SQUARE
5d - CUT HOSE F ON LINE CORRESPONDING TO UNIT WIDTH AND INSTALL
NOTE: 17.5": LINE 1, 21": LINE 2, 24.5": DO NOT CUT
NOTE:
USE SOAPY WATER TO FACILITATE EASY
HOSE AND TUBE ASSEMBLY
1/4” TUBE CUT
TO FIT (APPROX. 4”)
5a
5b
5c 5d
4
4a - REMOVE METAL BRACKET AND THE Ø.403 DRAIN
PLUG- DISCARD.
4b - REMOVE HOSE “A” - DISCARD
4c - INSTALL Ø .559" CONDENSATE DRAIN PLUG AND
CONDENSATE TRAP GASKET AS SHOWN.
4d - INSTALL CONDENSATE TRAP. MAKE SURE THE
CHANNEL AT THE LOCATION SHOWN IN THE “IMPORTANT
SECTION” ENGAGES THE EDGE OF THE JACKET AT THE
LOCATION SPECIFIED.
4e - SECURE USING (3) SCREWS.
NOTE: TO PREVENT DAMAGE TO THE TRAP, THE INSTALLER MAY ELECT TO
INSTALL IT DURING A LATER STEP. (AFTER THE UNIT IS ROTATED)
DISCARD
HOSE A
DISCARD
INSTALL
4a
4b
4c
4d
R
ECTANGLE PLUG
DISCARD
DRILL (3)
Ø1/8" HOLES
3a - REMOVE RECTANGLE FLUSH MOUNT PLUG
FROM JACKET SIDE-DISCARD
3
b - PRE-DRILL (3) Ø 1/8" HOLES AS SHOWN
FOR CONDENSATE TRAP
3a
3b
3
NOTE: REMAINING STEPS SHOWN WITH FURNACE IN HORIZONTAL RIGHT ORIENTATION
ST-A1194-32-01
!! IMPORTANT !!
THIS CHANNEL
MUST ENGAGE
JACKET AT THIS
EDGE TO AVOID
AIR LEAKS TO
THE BURNER
VESTIBULE!
CONDENSATE TRAP
INFORMATION
TRAP
JACKET
I
NSTALL CONDENSATE TRAP
INSTALL CONDENSATE TRAP
Field Conversions
29
ST-A1194-32-01
Notes:
__ VERIFY ALL HOSES ARE SECURE AND FULLY SEATED.
__ CONFIRM THAT ALL HOSES ARE FREE OF KINKS.
__ CONFIRM ALL HOSES AND OTHER DRAIN PARTS HAVE A
SLOPE IN DIRECTION OF WATER FLOW.
__ BOTH WORM DRIVES ON THE HOSE CLAMPS OF THE FLUE TRANSITION
MUST BE LOCATED ON THE TOP OF THE COUPLING. SEE LOCATION
DETAIL IN THE GENERAL CONVERSION INSTRUCTIONS AT THE
BEGINNING OF THIS SECTION.
__ ALL CLAMPS AND COUPLINGS ARE TIGHTENED
__ ALL DRAIN PORTS ARE PLUGGED.
__ UNIT HAS FORWARD PITCH.
__ HEAT TAPE INSTALLED(IF REQUIRED)
Checklist:
Field Conversions
30
Loading...
+ 94 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.