Reznor B125 Installation Manual

WARNING: Improper installation, adjustment, alteration, service, or maintenance can cause property damage, injury or death. Read the installation, operation, and maintenance instructions thoroughly before installing or servicing this equipment.
Horizontal/Vertical
Vent Outlet
INST ALLATION FORM I-F/B125-HV
Obsoletes RGM 434-HV125
®
Model F and B 125 unit heaters require field assembly of the vent outlet. Using 17, #10 x 1/2" sheetmetal screws (16 in the plastic bag and the two screws used to hold the vent outlet pieces in place during shipping), carefully follow the illustrated instructions on page 2 to assemble the vent outlet.
DANGER: Failure to provide proper venting could result in death, serious injury, and /or property damage. The unit must be installed with a vent connection and proper vent to the outside of the building. Follow the instructions on page 2 and the venting instructions in the installation manual.
Applies to: Models F125 and B125
SEE PAGE 2
REQUIRES ASSEMBLY
INSTRUCTIONS ON
THIS SHEET.
OF FLUE OUTLET.
THIS HEATER
! CAUTION:
REFER TO
REFER TO
! CAUTION:
THIS HEATER
OF FLUE OUTLET.
THIS SHEET.
INSTRUCTIONS ON
REQUIRES ASSEMBLY
Form I-F/B125-HV, P/N 132794 (Rev 2), Page 1
ASSEMBLY INSTRUCTIONS FOR VENT OUTLET -- Models F 125 and B 125
These instructions and illustrations show the vent outlet being assembled in the horizontal position. To assemble the vent outlet in the vertical position, follow the instructions reversing the positions of the flue collar assembly (Step 3) and the cover (Step 4).
1. Remove the two center screws (one on each side) that are holding the
three flue outlet pieces in place during shipping. Use these screws and the 16 screws (#10x1/2" sheetmetal screws) in the plastic bag.
The three pieces are: P/N Flue Collar Support 131992 Flue Collar Assembly 132765 Cover 132764
2. Attach the Flue Collar Support
Flue Collar
Support
Position the support with the opening
toward the back of the heater.
Slide the flange on the front of the flue
collar support under the drafthood (top of the heater).
Fasten with five sheetmetal screws.
3. Attach the Flue Collar Assembly
Position the flue collar
assembly over the rear
Flue Collar
Assembly
opening.
Fasten with four
sheetmetal screws.
Installation NOTE: For vertical vent outlet, reverse the positions of the flue collar assembly (Step 3) and the cover (Step 4).
Front Flange MUST slide under top of heater
Flue Collar Support
Flue Collar Assembly
Slide the flange on the front of the flue collar support under­neath the drafthood.
Drafthood
Sheetmetal Screws (5)
Sheetmetal Screws (4)
4. Attach the Cover
Position the flat cover.
Fasten on the top and
back with eight sheet­metal screws.
5. Installation of the vent outlet is complete. When the outlet is in the horizontal position, it is recom­mended that a 12-18" piece of straight pipe be connected to the flue pipe before installing an elbow. Follow the instructions in the installation manual for venting the heater.
Cover
(800) 695-1901, www.RezSpec.com
©2014 Reznor, LLC. All rights reserved. Printed in the U.S.A.
Trademark Note: Reznor® is registered in the United States and other countries.
Form I-F/B125-HV, P/N 132794 (Rev 2), Page 2
0514 OG POD Form I-F/B125-HV (Version 0.1)
Sheetmetal Screws (8)
Cover
Loading...