V-Cone Metering Program User Manual (for ROC800-Series)
Page
Revision
All Pages
June-2016
All Pages
October-2013
All Pages
May-2012
All Pages
October-2011
ii, 1, 5, 6
April-2004
Initial Issue
September-2003
Revision Tracking Sheet
June 2016
This manual may be revised periodically to incorporate new or updated information. The revision date
of each page appears at the bottom of the page opposite the page number. A change in revision date to
any page also changes the date of the manual that appears on the front cover. Listed below is the
revision date of each page (if applicable):
ii Revised June-2016
V-Cone Metering Program User Manual (for ROC800-Series)
Contents
Chapter 1 – Introduction 1
1.1 Scope and Organization ................................................................................................................ 1
3.5 Saving the Configuration ............................................................................................................. 19
Chapter 4 – Reference 21
4.1 Point Type 61/71: V-Cone Metering Configuration ..................................................................... 22
Revised June-2016 iii
V-Cone Metering Program User Manual (for ROC800-Series)
[This page is intentionally left blank.]
iv Revised June-2016
V-Cone Metering Program User Manual (for ROC800-Series)
Chapter 1 – Introduction
This chapter describes the structure of this manual and presents an
overview of the V-Cone® Metering program for the ROC800-Series
Remote Operations Controller (ROC800).
1.1 Scope and Organization
This document serves as the user manual for the V-Cone Metering user
program, which is intended for use in ROC800. This manual describes
how to download and configure the V-Cone Metering user program
(referred to as the “V-Cone program” or “the program” throughout the rest
of this manual). You access and configure the program using ROCLINK
800 Configuration Software (version 2.00 or greater) loaded on a personal
computer (PC) running Microsoft® Windows® 2000 (with Service Pack 2),
Microsoft Windows XP, Microsoft Windows Vista™, or Microsoft
Windows 7 (32-bit or 64-bit).
The sections in this manual provide information in a sequence appropriate
for first-time users. Once you become familiar with the procedures and the
software running in a ROC800, the manual becomes a reference tool.
ROCLINK 800 Configuration Software User Manual (for ROC800-
1.2 Product Overview
The V-Cone program allows a ROC800 to calculate a corrected
volumetric flow rate at a specified base pressure and temperature for a
McCrometer V-Cone or Wafer-Cone flowmeter. The V-Cone or WaferCone flowmeter is very similar to an orifice plate calculation, uses many
of the same configuration parameters, and produces many of the same
calculated values. For this reason, the user program makes use of existing
orifice meter run points already provided by the ROC800 firmware. In
addition to the standard orifice point parameters, the ROC800 also
calculates an actual volumetric flow rate, a fluid velocity, a thermal
expansion factor, and the percent pressure loss in accordance with the
(part D301217X012).
Series) (part D301250X012).
Revised June-2016 Configuration 1
V-Cone Metering Program User Manual (for ROC800-Series)
v. 3.30
v. 2.16
v. 3.30
v. 2.16
McCrometer specification McCrometer Flow Calculations for the V-Cone
Flowmeter, October 2002.
As part of the V-Cone program point configuration, you assign the VCone or the Wafer-Cone calculation to an orifice meter point. When the
calculation is assigned, the standard AGA3 calculation is bypassed and the
McCrometer calculation is performed instead. All standard orifice
parameters, as well as the additional V-Cone program parameters, are
available for assignment to Modbus registers, PID control loops, historical
archiving, and FST and DS800 database functions.
1.3 Program Requirements
The V-Cone program version 1.11 is compatible with ROC800-Series 2
firmware version 3.30 (or greater), ROC800-Series 1 firmware version
2.16 (or greater), ROC800L firmware version 1.20 (or greater), and with
version 2.00 (or greater) of ROCLINK 800 configuration software. The
program requires you to install an AGA 3/7/8 hardware-based license key
to enable the calculations, and a V-Cone license key to enable the user
program.
File Name
V-Cone.61.tar
V-Cone.71.tar
Target
Unit/
Version
ROC800-
Series 2
ROC800-
Series 1
ROC800-
Series 2
Notes:
Two versions of the program are included. Installation and operation
are identical between the two programs, but they use different point
type locations, different display numbers. V-Cone.61.tar uses point
types 61 and uses display 61. V-Cone.71.tar uses point types 71 and
uses display 71. Install the program version that avoids point type
conflicts with currently installed programs.
The installation process and functionality is the same for all versions
of the V-Cone program.
Program specifics include:
User Defined
Point (UDP)
61 16151 408 73728 2.00 61
71 16151 408 73728 2.00 71
Flash Used
(in bytes)
SRAM Used
(in bytes)
DRAM
Used (in
bytes)
ROCLINK
800
Version
Display
Number
ROC800-
Series 1
For information on viewing the memory allocation of user programs, refer
to Section 7.7 of the ROCLINK 800 Configuration Software User Manual (for ROC800-Series) (part D301250X012).
Revised June-2016 Configuration 2
V-Cone Metering Program User Manual (for ROC800-Series)
DOC0422A
J1
U1
1.3.1 License Keys
License keys, when matched with valid license codes, grant access to
applications such as the V-Cone program. An AGA3/7/8 license key must
be present to provide the required number of meter runs, and a separate
license key is also required to enable the V-Cone user program.
The term “license key” refers to the physical piece of hardware that can
contain up to seven different licenses (refer to Figure 1–1). Each ROC800
can have none, one, or two license keys installed. If you remove a license
key after enabling an application, the firmware disables the task from
running. This prevents unauthorized execution of protected applications in
a ROC800.
Figure 1-1. License Key
Revised June-2016 Configuration 3
V-Cone Metering Program User Manual (for ROC800-Series)
[This page is intentionally left blank.]
Revised June-2016 Configuration 4
V-Cone Metering Program User Manual (for ROC800-Series)
DOC0423A
Chapter 2 – Installation
This section provides instructions for installing the V-Cone program into
the ROC800. Read Section 1.3 of this manual for program requirements.
Notes:
The computer running ROCLINK 800 must be connected to the Local
Operator Interface (LOI) port before you begin the download.
The program and license key can be installed in any order. The manual
shows the installation of the license key first.
The installation process and functionality is the same for all versions
of the V-Cone program.
2.1 Installing the License Key
If you order the V-Cone program for a new ROC800, your ROC800 is
delivered with the license key installed. Go to Section 2.2. If you order the
program for an existing ROC800, you must install the license key
yourself.
Caution
Failure to exercise proper electrostatic discharge precautions, such as
wearing a grounded wrist strap may reset the processor or damage
electronic components, resulting in interrupted operations.
When working on units located in a hazardous area (where explosive
gases may be present), make sure the area is in a non-hazardous state
before performing these procedures. Performing these procedures in a
hazardous area could result in personal injury or property damage.
To install a license key:
1. Remove power from the ROC800.
2. Remove the wire channel cover.
3. Unscrew the screws from the Central Processing Unit (CPU) faceplate.
4. Remove the CPU faceplate.
5. Place the license key in the appropriate terminal slot (P4 or P6) in the
CPU.
Figure 2-1. License Key Installation
Note: When using a single license key, install it in slot P4.
Revised June-2016 Configuration 5
Loading...
+ 19 hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.