REMKO KPS300 User Manual

REMKO TANK SYSTEMS
Storage tank for hot/cold water KPS 300
Operation · Technology
Edition GB - D07
Safety notes
4
Environmental protection and recycling
Warranty
Intended use
Operation
Description
Decommissioning
Care and maintenance
Installation instructions for qualified personnel
Installation
Assignment of the connection ports
Commissioning
Unit dimensions and technical data
5
5
5
5
6
6
7
7-8
8-9
9-10
10
11
Made by REMKO
Read these operating instructions carefully before commissioning / using the device!
These instructions are an integral part of the unit and must always be kept in the vicinity of the installation location or on the unit itself.
Subject to modifications; no liability accepted for errors or misprints!
3
REMKO KPS 300
Safety notes
Carefully read the operating manual before placing the unit in service for the first time. It contains useful tips and notes ! such as hazard warnings to prevent injury and material damage. Failure to follow the directions in this manual can result in endangerment to persons, the environment and the equipment itself and will void any claims for liability.
Keep this manual in the vicinity of
the units.
The units and components should
be set up and installed only by qualified personnel.
The set-up, connection, and operation
of the unit and its components must take place in accordance with the operating conditions stipulated in this manual and comply with all applicable local regulations.
Modification of units and components
supplied by REMKO is not permitted and can cause malfunctions.
Units and components may not be
operated in areas where there is an increased risk of damage. Observe the minimum clearances.
The electrical supply is to be adapted
to the requirements of the units.
The operational safety of units and
components is only assured if they are fully assembled and used as intended. Safety devices may not be modified or bypassed.
Do not operate units or components
with obvious defects or signs of damage.
The units and components must
be kept an adequate distance from flammable, explosive, combustible, abrasive and dirty areas or atmospheres.
Installation, repair and maintenance
work may be carried out only by authorised specialists. Visual inspections and cleaning can be performed by the operator as long as power is disconnected from the equipment.
To preclude any danger from the unit,
take appropriate hazard-prevention measures when performing installation, repair or maintenance work or cleaning the units.
4
Environmental protection and recycling
Intended use
Disposing of packaging
All products are packed for transport in environmentally friendly materials. You can make a valuable contribution to reducing waste and sustaining raw materials by only disposing of packaging at approved collection points.
Disposal of components
The manufacturing process for the units is subject to continuous quality control. Only high-grade materials are processed, the majority of which are recyclable. You can also contribute to environmental protection by only disposing of components in accordance with local regulations and in an environmentally safe manner, e.g. through authorised disposal and recycling specialists or at collection points.
The storage tanks are employed for the storage of hot water in all types of warm water central heating systems (solid fuel/oil-fired boilers, heat pumps, solar energy systems, gas/electric instantaneous water heaters) within enclosed spaces and for the storage of cold water for cooling processes or heat recovery purposes. Any different or additional use shall be classed as non-intended use. The manufacturer/supplier assumes no liability for damages arising from such use. The user bears the sole risk in such cases. Intended use also includes working in accordance with the operating manual and installation instructions and complying with the maintenance requirements.
Operation
Manual operation is not necessary.
Warranty
The warranty conditions are listed in the "General terms and conditions". Please contact your contractual partner in he first instance.
5
REMKO KPS 300
Description
The storage tanks are employed for the storage of hot water in all types of warm water central heating systems (solid fuel/oil-fired boilers, heat pumps, solar energy systems, gas/electric instantaneous water heaters) within enclosed spaces and for the storage of cold water for cooling processes or heat recovery purposes.
The tank volume can be adapted to your particular needs by connecting several storage tanks to form batteries. The storage tanks may be used universally, either as parallel storage (hydraulic switch) or series storage.
The insulation of the storage tank is comprised of 50 mm directly applied, CFC-free, fine-pore PU foam. The external cladding applied at the factory is comprised of a powder-coated steel sheet cladding in the colour: silvery-grey; the insulation of the KPS 300 is water vapour diffusion-tight.
All storage tanks are manufactured from quality steel in accordance with DIN EN 10025/10111. An electric booster heater (immersion heater) can be fitted into each storage tank in a 6/4" socket. For retrofitting a fin-tube heat exchanger, a D180 (f=180mm) blank flange cover is included. The storage tanks have 4 connection ports 5/4"AG. A sensor channel enables variable positioning of a temperature sensor.
Decommissioning
Temporary shutdown
1. Disconnect the electrical connection at all poles.
2. Drain the tank in areas where it is at risk from frost and before the onset of winter.
3. Then also drain all cold water pipes or hot water carrying lines leading to the heating elements and to the heater/cooler as well as all water-carrying fittings and lines (including heating circuit = register) back as far as the frost-proof section of the domestic water system (domestic water connection).
Permanent decommissioning
Ensure that equipment and components are disposed of in accordance with local regulations, e.g. through authorised disposal and recycling specialists or at collection points. REMKO GmbH & Co. KG or your contractual partner will be pleased to provide a list of certified firms near you.
! ATTENTION
When emptying the tank, hot water may escape!
! ATTENTION
When placing the tank back into service, ensure that it is filled with water and that water which is free of bubbles is escaping from the valves!
6
Care and maintenance
Care
Only clean the units with a damp cloth (adding, for instance, a liquid household cleaner. Do not use any harsh, scouring or solvent-based cleaners.)
Maintenance
We recommend concluding a maintenance contract with a specialist firm, which includes annual maintenance services.
NOTE
This ensures the operational reliability of your equipment!
Regularly check the function of the safety valve.
The expansion water amount at maximum heat (approx. 80°C) represents approx. 3.5% of the tank capacity. When the safety valve test knob is lifted or turned to the “Test” position, the water must flow unhindered out of the safety valve body into the drainage funnel.
! ATTENTION
This can cause the cold water supply and parts of the storage tank connection fitting to become hot!
If the tank is not heated or when warm water is removed, no water should be dripping from the safety valve. If this does occur, either the pressure in the water pipe is greater than the permitted value, or the safety valve is defective. If the pressure in the water pipe is higher than permitted, a pressure relief valve must be used.
Installation instructions for qualified personnel
General instructions prior to installation
Ensure that the area in which the unit is to be operated is free of frost and easily accessible for required maintenance, repairs and even for the possible replacement of the unit (e.g. avoid overly narrow thoroughfares and doorways).
When installing the storage tank in unusual locations, such as in lofts, residential units with floors that are sensitive to water, storerooms, etc. take account of the possibility of leaking water, and ensure that a facility is in place to catch the water, including appropriate drainage methods.
The unit may only be positioned and operated on level surfaces.
7
REMKO KPS 300
Ensure that the area in which the unit is to be operated is free of frost and easily accessible for required maintenance, repairs and even for the possible replacement of the unit (e.g. avoid overly narrow thoroughfares and doorways).
When installing the storage tank in unusual locations, such as in lofts, residential units with floors that are sensitive to water, storerooms, etc. take account of the possibility of leaking water, and ensure that a facility is in place to catch the water, including appropriate drainage methods.
The unit may only be positioned and operated on level surfaces.
When planning the unit's installation surface and selecting the installation location, note the total weight of the storage tank, including the weight of the water (the nominal capacity), in order to ensure that the statics of the load-bearing surface are not exceeded.
! ATTENTION
The storage tank is not suitable for preparing drinking water!
Central heating connection
Before being placed into service, the heat distribution must be rinsed out in order to remove any soiling (e.g. scale) from the heating circuit.
Installation
Check the contents of the packaging for completeness and check the unit for visible transport damage. Immediately notify your contractual partner of any deficiencies.
The unit must be assembled on site.
For all connection ports, ensure that the thread is fully engaged.
Ensure proper clearance from firing systems.
Make sure that units with enclosures, which are installed in small, tight spaces or in suspended ceilings have the connection block (water and electric connections and heater installation) still freely accessible and that there us no buildup of heat.
Leave at least 500mm of space free for the removal of the cleaning/ heating flange.
8
Installation
General Information
Do not continually top up the water level in the storage tank. This will prevent corrosion damage to the tank.
If aggressive water is an issue, please note that special models of the tank can be tested (address all queries to your contractual partner)
In hard water areas, connect
Electric booster heater
a standard descaling device upstream
of the tank.
Use the 6/4" socket to install an electric booster heater (immersion
NOTE
heater)
Installation may only be performed
by authorised specialists. Preparation of the hot water must be in compliance with the
Please note that the electric booster heater must not be used as a permanent heating system.
applicable standards.
NOTE
Installation may only be performed by authorised specialists.
Assignment of the connection ports
Variant 1: Heat pump located to the right of the storage tank
Heating circuit supply
5/4“ AG
Immersion tube
for temperature sensor
Heating circuit return line and
emptying through customer-
provided T-section 5/4" AG
Cleaning flange or
opening for fin-tube
heat exchanger D180
(special accessory)
Top 1" AG connection, for: venting, safety group
Heat pump supply line 5/4“ AG
Optional: Electric booster heating (immersion heating) 6/4" IG
Heat pump return line 5/4“ AG
9
REMKO KPS 300
Variant 2: Heat pump located to the left of the storage tank
Heat pump supply line
5/4“ AG
Immersion tube
for temperature sensor
Heat pump return line
5/4“ AG
Cleaning flange or
opening for fin-tube
heat exchanger D180
(special accessory)
Commissioning
Top 1" AG connection, for: venting, safety group
Heating circuit supply 5/4“ AG
Optional: Electric booster heating (immersion heating) 6/4" IG
Heating circuit return line and emptying through customer­provided T-section 5/4" AG
NOTE
Commissioning should only be performed and documented by specially trained personnel.
1.
Check all connections, even those which were sealed at the factory (flange), for leak-tightness.
2 Then check all pipes for any leaks
and, if necessary, fix them.
10
3. Test the safety module and valves for function.
4. During the heating process, all
expansion water generated in the tank must be captured by an appropriate expansion vessel.
Flange installation port
Depending on the design of your system, fin-tube heat exchangers may
Fitting the flange installation port
Supporting disc
Flange plate
be attached to the boiler flanges.
First tighten the nuts by hand.
Then tighten the nuts, in the sequence specified below, to a torque of 20 Nm to max. 25 Nm.
Unit dimensions and technical data
1514
1420,5
246
983
924,5
Seal
1689
1797
Flange ring
305
Weight
[kg]
Energy consumption in standby
(emission value)
according to DIN 44532
[kWh/d]
Unit type
Nominal capacity
[l]
ø600
Operating
temperature
min/max
[°C]
180
Operat-
ing pres-
sure
[bar]
90°
Tilt
height
[mm]
KPS 300 300 0/95 3 1740 118 2,2
We reserve the right to modify the dimensions and constructional design as part of the ongoing technical development process.
11
REMKO INTERNATIONAL
... and also right in your neighbourhood! Benefit from our experience and advice
REMKO GmbH & Co. KG Air conditioning and heating technology
Im Seelenkamp 12 D-32791 Lage Postfach 1827 D-32777 Lage Telephone +49 5232 606-0 Fax +49 5232 606-2 60 e-mail info@remko.de Website www.remko.de
Loading...