Regency P33-LP3, P33-NG3 User Manual

www.regency-fi re.com
P33-3 Zero Clearance
Direct Vent Gas Fireplace
Owners &
Installation Manual
MODELS: P33-NG3 Natural Gas P33-LP3 Propane
FOR YOUR SAFETY Do not store or use gasoline or other fl ammable vapors and liquids in the vicinity of this or any other appliance.
Installation and service must be performed by a qualifi ed installer, service agency or the gas supplier.
Tested by:
918-262a
FPI FIREPLACE PRODUCTS INTERNATIONAL LTD. 6988 Venture St., Delta, BC Canada, V4G 1H4
Installer: Please complete the details on the back cover
and leave this manual with the homeowner.
Homeowner: Please keep these instructions for future reference.
FOR YOUR SAFETY What to do if you smell gas:
Do not try to light any appliance Do not touch any electrical switch:
do not use any phone in your building.
Immediately call your gas supplier
from a neighbour's phone. Follow the gas supplier's instructions.
If you cannot reach your gas
supplier, call the fi re department.
01/04/06
To the New Owner:
Congratulations!
You are the owner of a state-of-the-art Gas Stove by FPI FIREPLACE PRODUCTS INTERNATIONAL LTD. The
P33-3 has been designed to provide you with all the warmth and charm of a wood fi replace at the fl ick of a switch.
The P33-3 has been approved by Warnock Hersey for both safety and effi ciency. As it also bears our own mark,
it promises to provide you with economy, comfort and security for many trouble free years to follow. Please take a
moment now to acquaint yourself with these instructions and the many features of your Regency Fireplace.
INFORMATION FOR MOBILE/MANUFACTURED HOMES AFTER FIRST SALE
This Regency product has been tested and listed by Warnock Hersey as a Direct Vent Wall Furnace to the following standards: VENTED GAS FIRE­PLACE HEATERS ANSI Z21.88-2002/CSA 2.33-2002 and GAS-FIRED APPLIANCES FOR USE AT HIGH ALTITUDES CAN/CGA-2.17-M91.
This Direct Vent System Appliance must be installed in accordance with the manufacturer's installation instructions and the Manufactured Home Construction and Safety Standard, Title 24 CFR, Part 3280, or the current Standard of Fire Safety Criteria for Manufactured Home Installations, Sites, and Communities ANSI/NFPA 501A, and with CAN/CSA Z240-MH Mobile Home Standard in Canada.
This appliance installation must comply with the manufacturer's installation instructions and local codes, if any. In the absence of local codes follow the current National Fuel Gas Code, ANSI Z223.1 and the current National Electrical Code ANSI/NFPA 70 in the U.S.A., and the current CAN/CGA B149 Gas Installation Code and the current Canadian Electrical Code CSA C22.1 in Canada.
The appliance, when installed, must be electrically grounded in accordance with local codes or, in the absence of local codes, with the National Electrical Code, ANSI/NFPA 70, or the Canadian Electrical Code, CSA C22.1.
Ensure that structural members are not cut or weakened during installation.
This Regency Mobile/Manufactured Home Listed appliance comes factory equipped with a means to secure the unit.
This Regency Mobile/Manufactured Home listed appliance comes equipped with a dedicated #8 ground lug to which an 18 gauge copper wire from the steel chassis ground must be attached.
This appliance may be installed in an aftermar­ket permanently located, manufactured (mobile) home, where not prohibited by local codes.
This appliance is only use with the type of gas indicated on the rating plate. This appliance is not convertible for use with other gases, unless a certifi ed kit is used.
Regency P33-3 Zero Clearance Direct Vent Gas Fireplace
TABLE OF CONTENTS
P33-3 ZERO CLEARANCE
DIRECT VENT GAS FIREPLACE
Page Page
Safety Label
Safety Label ............................................................... 4
Installation
Important Message ..................................................... 5
Before You Start ......................................................... 5
General Safety Information ........................................ 5
Manufactured Home Additional Requirements ........... 5
Installation Checklist ................................................... 6
Unit Dimensions ......................................................... 6
HeatWave Duct System Option .................................. 6
Locating Your Gas Stove ............................................ 6
Clearances ................................................................. 7
Combustible Mantel Clearances ................................ 7
Mantel Leg Clearances .............................................. 7
Framing and Finishing ................................................ 8
Unit Assembly Prior to Installation .............................. 9
Venting Introduction .................................................... 9
Exterior Vent Termination Locations ......................... 10
Venting - Regency Direct Vent System (Flex)
Horizontal Terminations only .....................................11
Venting - Installation of Regency Direct Vent
System (Flex) ..................................................... 12
Venting - Rigid Pipe Venting Systems ...................... 13
Rigid Pipe Venting Components List ........................ 14
Venting Arrangements - Vertical Terminations .......... 15
Venting Arrangements - Horizontal Terminations .... 17
Vertical Terminations - Co-Linear Flex System ......... 21
Venting Arrangements .............................................. 22
Venting - Horizontal Installations .............................. 23
Venting - Vertical Termination ................................... 24
Gas Line Installation ................................................. 24
Pilot Adjustment ........................................................ 25
High Elevation .......................................................... 25
System Data ............................................................. 25
Gas Pipe Pressure Test ............................................ 25
SIT Valve Description ............................................... 25
Conversion to Propane ............................................. 26
Optional Brick Panels ............................................... 27
Log Installation ......................................................... 27
Flush Door - Standard .............................................. 28
Flush Trim (optional) ................................................. 28
Louvers - Flush ........................................................ 29
Double Screen Door ................................................. 29
Bay Front (optional) .................................................. 29
Bay Trim (optional) ................................................... 29
Louvers - Bay ........................................................... 30
Full Screen Front ...................................................... 31
Remote Control (optional) ........................................ 33
Wall Thermostat (optional) ....................................... 33
Remote Wall Switch (optional) ................................. 33
Wiring Diagram ......................................................... 34
Fan Installation (optional) ......................................... 35
Operating Instructions
Lighting Plate Instructions ........................................ 36
Operating Instructions .............................................. 37
Lighting Procedure ................................................... 37
Shutdown Procedure ................................................ 37
First Fire ................................................................... 37
Aeration Adjustment ................................................. 37
Normal Operating Sounds of
Gas Appliances .................................................. 38
Maintenance
Maintenance Instructions ........................................ 38
General Vent Maintenance ....................................... 38
Gold-Plated or Brass Louvers .................................. 38
Gold Plated or Brass Trim ........................................ 38
Log Replacement ..................................................... 38
Thermopile/Thermocouple ....................................... 39
Glass Gasket ............................................................ 39
Door Glass: Flush and Bay Glass ............................ 39
Removing Valve ........................................................ 40
Installing Valve .......................................................... 40
Parts List
Replacement/Spare Parts List .................................. 41
Warranty
Warranty ................................................................... 47
Regency P33-3 Zero Clearance Direct Vent Gas Fireplace
SAFETY LABEL
This is a copy of the label that accompanies each P33-3 Zero Clearance Direct Vent Gas Fireplace. We have printed a copy of the contents here for your review. The safety label is located on the front inside base of the unit, visible when the bottom louver is open.
NOTE: Regency units are constantly being improved. Check the label on the unit and if there is a difference, the label on the unit is the correct one.
For the State of Massachusetts, installation and repair must be done by a plumber or gasfi tter licensed in the Commonwealth of Massachusetts.
For the State of Massachusetts, fl exible connectors shall not exceed 36 inches in length.
For the State of Massachusetts, the appli­ances individual manual shut-off must be a t-handle type valve.
Regency P33-3 Zero Clearance Direct Vent Gas Fireplace
INSTALLATION
IMPORTANT:
SAVE THESE
INSTRUCTIONS
The P33-NG3 or P33-LP3 Direct Vent Fireplace must be installed in accordance with these in­structions. Carefully read all the instructions in this manual fi rst. Consult the "authority having jurisdiction" to determine the need for a permit prior to starting the installation. It is the respon­sibility of the installer to ensure this fi replace is installed in compliance with manufacturer's instructions and all applicable codes.
BEFORE YOU START
Safe installation and operation of this appli­ance requires common sense, however, we are required by the Canadian Safety Standards and ANSI Standards to make you aware of the
INSTALLATION AND REPAIR SHOULD BE DONE BY A QUALI­FIED SERVICE PERSON. THE APPLIANCE SHOULD BE IN­SPECTED BEFORE USE AND AT LEAST ANNUALLY BY A PROFES­SIONAL SERVICE PERSON. MORE FREQUENT CLEANING MAY BE REQUIRED DUE TO EXCES­SIVE LINT FROM CARPETING, BEDDING MATERIAL, ETC. IT IS IMPERATIVE THAT CONTROL COMPARTMENTS, BURNERS AND CIRCULATING AIR PAS­SAGEWAYS OF THE APPLIANCE BE KEPT CLEAN.
DUE TO HIGH TEMPERATURES, THE APPLIANCE SHOULD BE LOCATED OUT OF TRAFFIC AND AWAY FROM FURNITURE AND DRAPERIES.
YOUNG CHILDREN SHOULD BE CAREFULLY SUPERVISED WHEN THEY ARE IN THE SAME ROOM AS THE APPLIANCE.
CLOTHING OR OTHER FLAM­MABLE MATERIAL SHOULD NOT BE PLACED ON OR NEAR THE APPLIANCE.
GENERAL SAFETY
INFORMATION
1) The appliance installation must conform with
local codes or, in the absence of local codes, with the current Canadian or National Gas Codes, CAN1-B149 or ANSI Z223.1 Installation Codes.
2) The appliance when installed, must be
electrically grounded in accordance with local codes, or in the absence of local codes with the current National Electrical Code, ANSI/NFPA 70 or CSA C22.1 Canadian Electrical Code.
3) See general construction and assembly
instructions. The appliance and vent should be enclosed.
4) This appliance must be connected to the
specifi ed vent and termination cap to the outside of the building envelope. Never vent to another room or inside a building. Make sure that the vent is fi tted as per Venting instructions.
5) Inspect the venting system annually for
blockage and any signs of deterioration.
6) Venting terminals shall not be recessed into a
wall or siding.
10) Be aware of electrical wiring locations in
walls and ceilings when cutting holes for termination.
11) Under no circumstances should this ap-
pliance be modifi ed. Parts that have to be removed for servicing should be replaced prior to operating this appliance.
12) Installation and any repairs to this appliance
should be done by a qualifi ed service per­son. A professional service person should be called to inspect this appliance annually. Make it a practice to have all of your gas appliances checked annually.
13) Do not slam shut or strike the glass door.
14) Under no circumstances should any solid
fuels (wood, paper, cardboard, coal, etc.) be used in this appliance.
15) The appliance area must be kept clear and
free of combustible materials, (gases and other fl ammable vapours and liquids).
Emissions from burning wood or gas could contain chemicals known to the State of Cali­fornia to cause cancer, birth defects or other reproductive harm.
MANUFACTURED
MOBILE HOME
ADDITIONAL
REQUIREMENTS
1) Ensure that structural members are not cut
or weakened during installation.
2) Ensure proper grounding using the #8
ground lug provided. See page 34.
WARNING: FAILURE TO INSTALL THIS APPLIANCE CORRECTLY WILL VOID YOUR WARRANTY
7) Any safety glass removed for servicing
must be replaced prior to operating the appliance.
AND MAY CAUSE A SERIOUS HOUSE FIRE.
CHILDREN AND ADULTS SHOULD
8) To prevent injury, do not allow anyone who
is unfamiliar with the operation to use the fi replace.
BE ALERTED TO THE HAZARDS OF HIGH SURFACE TEMPERA­TURES, ESPECIALLY THE FIRE-
9) Wear gloves and safety glasses for protec-
tion while doing required maintenance.
PLACE GLASS, AND SHOULD STAY AWAY TO AVOID BURNS OR CLOTHING IGNITION.
Regency P33-3 Zero Clearance Direct Vent Gas Fireplace
INSTALLATION
INSTALLATION
CHECKLIST
1) Locate appliance
a) Room location, page 6 b) Clearances to Combustibles, page 7 c) Mantle Clearances, page 7 d) Framing & Finishing Requirements, page 8 e) Venting Requirements, pages 10 to
15.
2) Assemble Top Facing Support and Side
Nailing Strips, page 9. (NOTE: must be done before installing unit into fi replace.)
3) Install vent, pages 10 to 24.
4) Make gas and electrical connections. Test
the pilot. Must be as per diagram. Page 25. Convert to Propane if desired, page 26.
5) Install brick panels (optional), page 27.
6) Install logs and embers and rockwool where
indicated on page 27.
7) Install Flush Door Front (Standard) and
optional Flush Gold Trim, page 28.
UNIT DIMENSIONS
4) The P33-3 can be installed in a recessed
position or framed out into the room as in A, B, C, D. See Diagram 1.
5) This appliance is Listed for bedroom instal-
lations when used with a Listed Millivolt Thermostat. Some areas may have further requirements, check local codes before installation.
6) The P33-3 Direct Vent Gas Fireplace is ap-
proved for alcove installations, which meet the clearances listed on this page.
7) We recommend that you plan your instal-
lation on paper using exact measurements for clearances and fl oor protection before actually installing this appliance. Have a qualifi ed inspector, dealer, or installer review your plans before installation.
Note: For vent terminations see page 10.
8) Install optional Double Screen Door, page
29.
9) Install Optional Bay Front and optional Bay
Gold Trim, page 29.
10) Install Louvers (Flush or Bay), pages 28
and 29.
11) Install optional Wall Switch, Remote Control,
or Wall Thermostat, page 33.
11) Install Optional Fan, page 35.
13) Final check.
Before leaving this unit with the customer, the installer must ensure that the appliance is fi r­ing correctly and operation fully explained
to customer.
This includes:
1) Clocking the appliance to ensure the correct
fi ring rate (rate noted on label) after burning appliance for 15 minutes.
2) If required, adjusting the primary air to ensure
that the fl ame does not carbon. First allow the unit to burn for 15-20 min. to stabilize.
CAUTION: Any alteration to the product that causes sooting or carboning that results in damage is not the responsibility of the manufacturer.
LOCATING YOUR
GAS STOVE
1) When selecting a location for your stove,
ensure that the clearances outlined on this page are met.
2) Provide adequate clearances for servic-
ing.
3) The appliance must be installed on a fl at,
solid, continuous surface (e.g. wood, metal, concrete). This may be the fl oor, or raised up on a platform to enhance its visual impact. If the appliance is going to be installed on carpeting, combustible linoleum tile or other combustible material other than wood fl oor­ing, the appliance must be installed on a metal or wood panel extending the full width and depth of the appliance.
Diagram 1
A) Flat on Wall B) Flat on Wall Corner C) Recessed into Wall/Alcove
DUCT SYSTEM
OPTION
KIT #946-556
The HeatWave Air Duct Kit increases the ef­fectiveness of your fi replace by dispersing warm air from the fi replace to remote locations in the same room or other rooms in your home.
Up to two kits may be installed on the fi replace. Please Note: Only 1 HeatWave kit may be operated at one time. This includes the internal blower option as well.
Regency P33-3 Zero Clearance Direct Vent Gas Fireplace
INSTALLATION
CLEARANCES
The clearances listed below are Minimum dis­tances unless otherwise stated:
A major cause of chimney related fi res is failure to maintain required clearances (air space) to combustible materials. It is of the greatest importance that this fi replace and vent system be installed only in accordance with these instructions.
Clearance to Combustibles from: Back 0" (0mm) Side 0" (0mm) Floor 0" (0mm)
NOTE: The minimum fl oor clearance must be maintained from the top surface of the carpet­ing, tile, etc.
Minimum Clearance from Top of Unit to:
Mantel* min. 7" (177mm) Ceiling 30" (762mm)
from top of unit.
Side Wall Clearance
Bay or Flush Front 7-1/2" (191mm)
Minimum Vent Clearances:
2-1/2" (64mm) Horizontal Top 1-1/2" (38mm) Horizontal Side 1-1/2" (38mm) Horizontal Bottom 1-1/4" (32mm) Vertical Vent Clearance (Simpson) 1-1/2" (38mm) Vertical Vent Clearance (Flex)
Alcove Clearances: Max. Depth 36" (914mm) Min. Width 48" (1219mm) Min. Height 59" (1499mm)
* see mantel clearance instructions.
WARNING Fire hazard is an extreme risk if these clearances are not adhered to.
Because of the extreme heat this fi replace emits, the mantel clearances are critical. Com-
bustible mantel clearances from top of unit are shown in the diagram below.
Note: A non-combustible mantel may be installed at a lower height if the framing is made
of metal studs covered with a non-combustible board.
This drawing is to scale at 1:6 (one inch = 6 inches). Mantel can be installed anywhere in shaded area or higher using the above scale.
Note: Ensure the paint that is used on the mantel and the facing is "heat resistant" or the
COMBUSTIBLE MANTELS
paint may discolour.
MANTEL LEG CLEARANCES
Combustible mantel leg clearances as per diagram below:
Clearances for Bay or Flush Front
Regency P33-3 Zero Clearance Direct Vent Gas Fireplace
Maximum 1-1/2" projection at 2" minimum clearance.
The HeatWave Duct Kit has different clear- ance and framing requirements, check the HeatWave manual for details.
INSTALLATION
FRAMING AND FINISHING
1) Determine the total thickness of facing
material (e.g. drywall plus ceramic tiles) to allow the fi nished surface to be fl ush with the front of the unit. Total facing thickness can vary from 1/2" (13mm) to 1-1/4" (32mm) thick.
Install Side Nailing Strips, and Top Facing Support before unit is slipped into position. See page 9 for assembly details.
2) Frame in the enclosure for the unit with
framing material.
Vertical Termination or
Vertical Rise with Horizontal
Termination
For Both Simpson & Flex
NOTE: If this is an outside corner, the
minimum distance between the vent and the outside corner is 6" (15cm) with AstroCap termination cap or 12" (30cm) with Dura-Vent termination cap.
Rear Termination
Simpson Dura-Vent Piping
Flex Piping
For Both Simpson & Flex
NOTE: If this is an outside corner, the minimum
distance between the vent and the outside corner is 6" (15cm) with AstroCap termination cap or 12" (30cm) with Dura-Vent termination cap.
3) For exterior walls, insulate the enclosure to
the same degree as the rest of the house, apply vapour barrier and drywall, as per lo­cal installation codes. (Do not insulate the
fi replace itself.)
4) The top of the unit must not be closer than
30" (762mm) to the ceiling.
5) Combustible material may be brought up to
the top and sides of the unit and be covered with ceramic tiles, bricks, rock or other suit­able combustible fi nishing materials.
Note: The unit does not have to be complete-
ly enclosed in a chase. The clearance on top of the unit is 0" to the standoffs so combustible building materials can be laid directly on top of the standoffs. You must maintain clearance from the vent to combustible materials for fl ex for Simpson Dura-Vent, see page 7.
Simpson Dura-Vent
Minimum Clearances
Top Header
1/2" (13mm) Drywall
1-1/2"
(38mm)
(102mm)
Opening for gas
4"
(76mm)
connection
3"
10" (254mm)
dia. Hole through
wall for Dura-Vent
30”
(762mm)
16-1/2” (419mm) Minimum
Flex Pipe
Minimum Clearances
Top Header
1/2" (13mm) Drywall
1-1/2"
(38mm)
4"
(102mm)
Opening for gas
6) Use steel studs for framing where the 1-1/2" (38mm) clearance from the vent
to combustible material cannot be main­tained.
The HeatWave Duct Kit has different clear- ance and framing requirements, check the HeatWave manual for details.
3"
(76mm)
connection
10" (254mm)
dia. Hole through
wall for Flex
26”
(660mm)
12-3/4” (324mm) Minimum
Regency P33-3 Zero Clearance Direct Vent Gas Fireplace
UNIT ASSEMBLY
PRIOR TO INSTALLATION
INSTALLATION
The Top Facing Support, the Side Nailing Strips and the 2 Top Standoffs must be correctly po­sitioned and attached to the top before the unit is put into position.
Top Standoff Assembly
The top standoffs are shipped in a fl at position and must be pulled up and bent into the cor­rect shape.
1) Remove the standoffs from on top of the
fi rebox by undoing the screws.
2) Take each standoff and bend into the cor-
rect shape. Bend up at the bend lines until the screw holes in the standoff and the pre-punched screw holes on the fi rebox top line-up.
3) Attach the standoffs securely to the top with
4 screws per standoff.
Note: Secure the standoffs to the holes
closest to the edge of the fi rebox top.
Top Facing Support &
Side Nailing Strips
Determine the total thickness of facing mate­rial (e.g. drywall plus ceramic tiles) to allow the fi nished surface to be fl ush with the front of the unit. Total facing thickness can vary from 1/2" (13mm) to 1-1/4" (32mm) thick.
The Top Facing Support & Side Nailing Strips can be mounted in various positions depending on the thickness of the facing material.
1) Mount Top Facing Support using the 3
supplied screws into the three pre-punched screw holes on the top front of the unit. Adjust support to desired facing material depth.
2) Mount Side Nailing Strip using the 3 sup-
plied screws into the three pre-punched screw holes at the front sides of the unit. Adjust support to desired facing material thickness.
For a facing material depth of 1-1/4"(32mm), the top facing support must be reversed.
VENTING INTRODUCTION
The P33-3 uses the "balanced fl ue" technology Co Axial system. The inner liner vents products of combustion to the outside while the outer liner draws outside combustion air into the combustion chamber thereby eliminating the need to use heated room air for combustion and losing warm room air up the chimney.
There are 2 vent systems approved for use with the P33-3: the Regency Direct Vent System (Flex) for Horizontal Terminations only (see pages 11-12), and the Simpson Dura-Vent Systems for Horizontal and Vertical Terminations (see pages 13-24).
Note: These fl ue pipes must not be connected to any other appliance.
The gas appliance and vent system must be vented directly to the outside of the building, and never be attached to a chimney serving a separate solid fuel or gas burning appliance. Each direct vent gas appliance must use it's own separate vent system. Common vent systems are prohibited.
NOTE: Ensure compliance with the outside vent terminal location before cutting hole as both dimensions must be met.
Regency P33-3 Zero Clearance Direct Vent Gas Fireplace
INSTALLATION
EXTERIOR VENT TERMINATION LOCATIONS
18"
24"
Vertical
Termination
A
L
V
N
j
H
V
B
A
B
Closed
K
Fixed
V
V
Openable
B
V
B
A
Area where terminal is not permited
from the centerline of the regulator.
any other appliance *(12"/30cm) #(9"/23cm)
H= Not to be installed above a meter/regulator assembly within (3'/90cm) horizontally
J= Clearance to service regulator vent outlet *(min. 36"/90cm)
K= Clearance to non-mechanical air supply inlet to building or the combustion air inlet to
*(min. 84"/2.1m)
L= Clearance to a mechanical air supply inlet *(min. 72"/1.8m)
#3' (91cm) above if within 10' (3m) horizontally.
M= Clearance above paved sidewalk or a paved driveway located on public property
N= Clearance under veranda, porch, deck, or balcony *(min. 12"/30cm)
Inside
corner detail
V
G
Vertical
Termination
Air supply outlet
A
Openable
Fixed
Closed
C
A
V
.
B
24"
E
V
D
M
V
B
V
F
Vent terminal
V
Dura-Vent Termination Cap (12"/30cm)
distance of (24"/60cm) from the centerline of the terminal (min. 18"/46cm) check with
local code.
A= Clearance above grade, veranda, porch, deck, or balcony *(min. 12"/30cm)
B= Clearance to window or door that may be opened *(12"/30cm) #(9"/23cm)
C= Clearance to permanently closed window *(min. 12"/30cm)
Regency P33-3 Zero Clearance Direct Vent Gas Fireplace
E= Clearance to unventilated soffi t (min. 15"/38cm)
D= Vertical clearance to ventilated soffi t located above the terminal within a horizontal
Vent Termination Cap (12"/30cm)
G= Clearance to inside corner: with AstroCap Termination Cap (min. 6"/15cm), with Dura-
F= Clearance to outside corner: with AstroCap Termination Cap (min. 6"/15cm), with
Note:
- A vent shall not terminate directly above a sidewalk or paved driveway which is located between two single family dwellings and serves both dwellings.
- Only permitted if veranda, porch, deck, or balcony is fully open on a minimum of two sides beneath the fl oor.
- If the vent termination is accessible, a certifi ed guard shall be installed.
* As specifi ed in CGA B149 Installation Code. Note: Local codes or regulations may require different clearances.
# In accordance with the current ANSI Z223.1/NFPA 54, Natioinal Fuel Gas Code.
INSTALLATION
REGENCY DIRECT VENT SYSTEM (FLEX)
HORIZONTAL TERMINATIONS ONLY
This venting system, in combination with the P33-3 Direct Vent Gas Fireplace, have been tested and listed as a direct vent heater system by Warnock Hersey. The location of the termination cap must conform to the requirements in the Vent Terminal Locations diagram on page 10.
Regency Direct Vent (Flex) System Termination Kit (Part # 946-513) includes all the parts needed to install the P33-3 with a maximum run of 2 feet. If installing the P33 with a continuous vent length of more than 2 ft (.6m) to a maximum of 10 ft. (3.0m) using Kit # 946-515 (4 ft) or
946-516 (10 ft) or see page 13 for alternate venting arrangements.
1) 6-7/8" dia. fl exible liner (2 ft. length)
2) 4" dia. fl exible liner (2 ft. length)
3) spring spacers (3)
4) thimble (2)
5) AstroCap termination cap (1)
6) screws (12)
7) tube of Mill Pac (1)
8) plated screws (8)
9) screws #8 x 1-1/2" drill point, stainless steel (4)
Notes:
1) Liner sections should be continuous without any joints or seams.
2) Only Flex pipe purchased from Regency may be used for Flex installations.
4" (102mm)
dia. flue pipe
Wall Thimble (2 pc)
(required in
Canada only)
spring spacer
AstroCap
Termination Cap
(Part# 946-523/P)
See also
Figure 1 below.
TM
Important
If using any Cabinet Mantels with Part # 510956, 510958, 510962, 510964 and 510834 the wall thimble must be secured fi rst and venting must be attached to unit before sliding into fi nal position.
Also Simpson Dura-Vent venting can­not be used with any of the mantels
noted above.
Minimum
Simpson Dura-Vent Center-Line
6-7/8"
(173mm)
dia. Flue pipe
Minimum Flex Kit Center-Line
Alternate Hori-
zontal Termi-
nation Caps
Figure 1
Wherever necessary due to external location of cap, the AstroCap can be replaced with the FPI Riser Vent Termination Cap or the Dura-Vent Snorkel Termination Cap.
Regency P33-3 Zero Clearance Direct Vent Gas Fireplace
INSTALLATION
INSTALLATION PROCEDURES
for Regency Direct Vent System (Flex)
1) Locate the unit in the framing, rough in the
gas (preferably on the right side of the unit) and the electrical (Junction block is on the left side) on the left. Locate the centerline of the termination and mark wall accordingly. Cut a 10"(254mm) hole in the wall (inside dimension).
Note: To make the installation more aes-
thetically pleasing, we recommend framing out a square to mount the terminal to.
Note: A 2-1/2" (64mm) horizontal top and
1-1/2" (38mm) horizontal sides & bottom clearance around the liner must be maintained except that only a 1" (25mm) clearance is needed at the termination end. We recommend framing a 10"(254mm) x 10"(254mm) (inside dimensions) hole to give structural rigidity for mounting the termination.
Note: If installing termination on a siding
covered wall, furring strips must be used to ensure that the termination is not recessed into the siding.
2) Level the fi replace and fasten it to the fram-
ing using nails or screws through the nailing strips.
3) Assemble the vent assembly by applying
Mill Pac to the 4"(100mm) inner collar of the termination and slipping the 4"(100mm) liner over it at least 1-3/8" (35mm). Fasten with the 3 screws (drilling pilot holes will make this easier). Apply Mill Pac or high temperature silicone to the 6-7/8"(175mm) fl ex pipe and slip it over the 6-7/8" outer collar of the vent terminal at least 1-3/8"(35mm) and fasten with the 3 screws.
4) Separate the 2 halves of the wall thimble and
securely fasten the one with the tabs to the outside wall making sure that the tabs are on top and bottom. Fasten the other thimble half to the inside wall. The thimble halves slip inside each other and can be adjusted for 2 x 4 or 2 x 6 walls. The liners must slip
over the collars a minimum of 1-3/8".
*If this is an outside corner, the minimum distance between the vent and the outside corner is 6" (15cm) with AstroCap termination cap or 12" (30cm) with Dura-Vent termination cap. See "F" on the diagram on page 10.
Minimum and Maximum Vent Clearances
5) Slip the assembled liner and termination
assembly through the thimble making sure the termination cap faces up (there are markings on the cap that show which way is up). This will position the termination cap with proper down slope for draining water. Fasten the cap to the outer wall with the 4 supplied screws.
6) Pull the centre 4"(100mm) liner and outer
6-7/8"(175mm) liner out enough to slip over the fl ue collars of the fi replace.
7) Apply Mill Pac over the fi replace inner collar
and slip the 4"(100mm) liner down over it and attach with 3 supplied screws.
8) Do the same with the 6-7/8"(175mm) liner.
4" (102mm)
dia. flue pipe
with spring spacer
Screws
(3 per
connection)
6-7/8"
(175mm)
dia. air intake
Wall Thimble 2 pieces
(10" (254mm) Outer Diameter)
9) Apply a bead of silicone between the thimble
and termination and around the outer edge of the terminal at the wall in order to keep the water out.
IMPORTANT: Do not locate termination hood where excessive snow or ice buildup may occur. Be sure to check vent termination area after snow falls, and clear to prevent accidental block­age of venting system. When using snow blowers, make sure snow is not directed towards vent termination
area.
2”x4”or2”x6”
(21mm x 102mm
or 21mm x 152mm)
Termination Cap
Screws
(4 per connection)
Regency P33-3 Zero Clearance Direct Vent Gas Fireplace
RIGID PIPE VENTING SYSTEMS
Horizontal or Vertical Terminations
INSTALLATION
The minimum components required for a basic horizontal termination are:
1 AstroCap Horizontal Termination Cap 1 45o Elbow 1 Rigid Pipe Adaptor 1 Wall Thimble 1 Length of pipe to suit wall thickness (see chart)
For siding other than vinyl furring strips may be used, instead of the vinyl siding standoff, to create a level surface to mount the vent terminal. The Terminal must not be recessed into siding.
If a Vinyl Siding Standoff is required (it must be used with vinyl siding), measure to outside surface of wall without siding and add 2 inches.
Alternate Hori-
zontal Termi-
nation Caps
Vertical
Terminal
Storm Collar
Flashing
Ceiling Firestop
Pipe Length
o
90 Elbow
24" (610mm)
Pipe Length
o
45 Elbow
Vinyl Siding
Standoff (Optional)
Adj.Pipe Length
11" - 14-5/8"
(279mm - 372mm)
Wall Thimble
Adj.Pipe Length
11" - 14-5/8"
(279mm - 372mm)
Horizontal
Termination
Cap
Wall Thimble
Horizontal
Termination Cap
Vinyl Siding
Standoff (Optional)
Rigid Pipe Adaptor
WARNING:
Do not combine venting components from different venting systems.
However use of the the AstroCapTM and FPI Riser is acceptable with all systems.
This product has been evaluated by Intertek for using a Dura-Vent Flue Adaptor in conjunction
Flat Wall Installation
Max. Wall Vent Length
Thickness (inches) Required (inches)
7-1/4" 6"
with Selkirk Direct-Temp and Ameri Vent Direct venting systems. Use of these systems with the Direct Vent GS starting collar is deemed accept­able and does not affect the Intertek WHI listing of components.
10-1/4" 9" 13-1/4" 12" 12-1/4" - 15-7/8" 11" - 14-5/8" Adj. Pipe 18-1/4" - 25-1/4" 11" - 14-5/8" Adj. Pipe
The FPI AstroCap American Metal Products, Ameri Vent Direct vent and Selkirk Direct-Temp. FPITM, and FPI AstroCapTM are the proprietary trademarks of FPI Fireplace Products International Ltd. Dura-Vent® and Direct Vent GS are registered and/or proprietary trademarks of Simpson Dura-Vent Co. Inc.
TM
and FPI Riser Vent terminal is certifi ed for installations using FPI venting systems as well as Simpson Dura-Vent®, Direct Vent GS,
When using piping other than Simpson
Dura-Vent, 3 screws must be used to
secure rigid pipe to adaptor.
Regency P33-3 Zero Clearance Direct Vent Gas Fireplace
INSTALLATION
RIGID PIPE VENTING COMPONENTS LIST
All Simpson Dura-Vent components are available directly from FPI.
Description Simpson Dura-Vent Selkirk AmeriventR Direct VentGS
6" Pipe Length, Galvanized 908 4DT-6 N/A 6" Pipe Length, Black 908B 4DT-6B N/A 7" Pipe Length, Galvanized N/A N/A 4D7 7" Pipe Length, Black N/A N/A 4D7B 9" Pipe Length, Galvanized 907 4DT-9 N/A 9" Pipe Length, Black 907B 4DT-9B N/A 12" Pipe Length, Galvanized 906 4DT-12 4D12 12" Pipe Length, Black 906B 4DT-12B 4D12B 18" Pipe Length, Galvanized N/A 4DT-18 N/A 18" Pipe Length, Black N/A 4DT-18B N/A 24" Pipe Length, Galvanized 904 4DT-24 4D2 24" Pipe Length, Black 904B 4DT-24B 4D2B 36" Pipe Length, Galvanized 903 4DT-36 4D3 36" Pipe Length, Black 903B 4DT-36B 4D3B 48" Pipe Length, Galvanized 902 4DT-48 4D4 48" Pipe Length, Black 902B 4DT-48B 4D4B
Adjustable Length, 11"-14", Galv. 911 4DT-AJ N/A Adjustable Length, 11"-14", Black 911B 4DT-AJB N/A Adjustable Length, 17"-24", Black 917B N/A N/A Adjustable Length, 7" Galvinized N/A N/A 4D7A Adjustable Length, 7" Black N/A N/A 4D7AB Adjustable Length, 12" Galvinized N/A N/A 4D12A Adjustable Length, 12" Black N/A N/A 4D12AB
45O Elbow, Galvinized 945 4DT-EL45 4D45L
O
Elbow, Black 945B 4DT-EL45B 4D45LB
45
O
45
Elbow, Swivel, Galvinized 945G N/A N/A
O
Elbow, Swivel, Black 945BG N/A N/A
45 90O Elbow, Galvinized 990 4DT-EL90S 4D90LS
O
90
Elbow, Black 990B 4DT-EL90SB 4D90LBS
O
Elbow, Swivel, Galvinized 990G N/A N/A
90 90O Elbow, Swivel, Black 990BG N/A N/A
Ceiling Support 949 - n/a from FPI 4DT-CS 4DFSP Cathedral Support Box 941 4DT-CSS 4DRSB Wall Support/Band 988 4DT-WS/B 4DWS Offset Support 989 - n/a from FPI 4DT-OS N/A Wall Thimble, Black 942 4DT-WT 4DWT Wall Thimble Support Box/Ceiling Support 940 N/A N/A Firestop Spacer 963 4DT-FS 4DFSP Trim Plate, Black N/A 4DT-TP 4DFPB Brass Trim for Wall Thimble/Ceiling Support 3951 N/A N/A
Attic Insulation Shield 12" N/A N/A 4DAIS12 Attic Insulation Shield - Cold Climates 36" N/A N/A 4DAIS36
Basic Horizontal Termination Kit (A) 970 4DT-HKA 4DHTK2 Horizontal Termination Kit (B) 971 4DT-HKB 4DHTK1 Vertical Termination Kit 978 4DT-VKC 4DVTK
High Wind Vertical Cap 991 N/A N/A High Wind Horizontal Cap 985 N/A N/A Horizontal Square Termination Cap 984 4DT-HHC 4DHC Verical Termination Cap 980 4DT-HVC 4DVC Storm Collar 953 4DT-SC 4DSC
Adjustable Flashing, 0/12-6/12 943 4DT-AF6 4DF Adjustable Flashing, 6/12-12/12 943S 4DT-AF12 4DF12
Vinyl Siding Standoff 950 4DT-VS N/A Vinyl Siding Shield Plate N/A 4DT-VSP N/A
Snorkel Termination 14" 982 4DT-ST14 4D12S Snorkel Termination 36" 981 4DT-ST36 4D36S
R
Direct-Temp
TM
Direct Vent
946-506/P Vent Guard (Optional) 640-530/P Riser Vent Terminal 510-994 Rigid Pipe Adaptor (must use with all rigid piping) 946-205 Vinyl Siding Shield for Riser Vent Terminal
946-208/P Vent Guard (Optional) - Riser Vent Terminal 946-523/P AstroCap Horizontal Cap 946-206 Vinyl Siding Standoff - AstroCap
Regency P33-3 Zero Clearance Direct Vent Gas Fireplace
INSTALLATION
RIGID PIPE VENTING ARRANGEMENTS - VERTICAL TERMINATIONS
(Propane & Natural Gas)
The shaded area in the diagram shows all allowable combinations of straight vertical and offset to vertical terminations , using one 90o elbow, with
rigid pipe vent systems for Propane and Natural Gas.
• Vent must be supported at offsets.
• Firestops are required at each fl oor level and whenever passing through a wall.
• Maintain clearances to combustibles.
Note: Must use optional rigid pipe adapter when using rigid pipevent systems (Part # 510-994).
Regency P33-3 Zero Clearance Direct Vent Gas Fireplace
Loading...
+ 33 hidden pages