INSTRUCTION
MANUAL
PLEASE READ THESE INSTRUCTIONS CAREFULLY BEFORE USE
English
GENMAN 092009 RevA
R
R
GENERAL COOKING
U
L
R
SANITATION
C
L
A
S
S
I
F
I
E
D
GCB -128
Pourover Brewer
Operating Instructions
Model No.: GCB -128
Voltage: 120/220VAC
Max. Wattage: 1650W.
Capacity: 24 Cups/5.5L.
1. Brewer Body
2. Main Heater Switch
3. Brew Basket
4. Water Pour Over Entrance
5. Coffee Pot (May be purchased separately)
6. Heating Plate
7. Heating Plate Switch
8. "Ready" Indicator
Warnings:
• Never immerse the machine in water. If the
machine has been soaked, it must be dried
and checked by a technician before being put
back into use.
• Never pour hot water into the Water Reservoir.
• Only use the unit indoors and on a firm leveled table or counter.
• When the machine is in use, some parts of the
machine will be very hot. Be sure to keep the
cord away from hot components. Do not to touch any of the hot components.
• Remain in the vicinity of the machine while it is in use.
• The power cord should only be replaced by a qualified person.
• This equipment is to be installed in compliance with the applicable federal, state, or local
plumbing codes.
Caution! Hot Surface!
Don’t open or remove the covers!
No user-serviceable
parts inside.
Installation:
1. Place the Machine on a firm and leveled counter or table.
2. Place the spring into the bottom of the Filter Pan and wedge it well.
3. Slide the Filter Pan into position.
4. Make sure the Main Switch is “OFF” and the power cord is not plugged in to an outlet.
5. Place an empty Coffee Pot at the Lower Hot Plate under the Filter Pan.
6. Slowly pour cool water into the machine from the Water Entrance until there is some water
over-flowing from the Filter Pan into the Glass Jug. Wait 2 minutes for water to force air out from
the unit.
7. Pour out any remaining water from the Coffee Pot and place the Pot back on the Hot Plate.
8. Turn the switch "ON" and the Boiler in the Machine will start to work.
9. When the "Ready to Brew" Indicator lights up, the machine is ready to brew.
Operation:
1. Assemble the Filter Pan and put applicable amount of coffee on the Filter Paper.
2. Slide the Filter Pan into position and make sure that there is an empty Coffee Pot on the Lower
Hot Plate.
3. Make sure the "Ready to Brew" Indicatior is lit.
4. Pour in another pot of cool water into the unit; due to the displacement principle the brew
cycle will now begin.
5. When there is no more coffee flowing out from the Filter Pan, the coffee is ready to serve.
6. The "Ready to Brew" light will be off during the brew cycle.
7. When the "Ready to Brew" light is on again, the machine is ready for another brew cycle.