Red Barrel Studio W005270726 Installation & Assembly

Page 1
STEP 3
1/4” DRILL BIT
Hardware List Qty
1SET
WALL
Assembly Instruction
5 Tier Corner Display Rack Multipurpose
Shelving Unit
Approx. 10 minutes
Recomm. 1 Person
CABLE TIE
Recommended Maximum Weight
10
10
10
10
10
*Unit in Pound(lbs)
No Tools Required
WARNING:
>This unit has been designed to support the maximum loads shown. Exceeding these load limits could cause sagging, instability, product collapse, and/or serious injury.
>DO NOT allow children to climb on unit.
>Put heavier items on lower shelves.
4 1
Page 2
No Hardware List Qty No QtyParts List
Top / Shelf Panel
1
2
3
Long Pole
Top Cap
Round Leg
12pcs
4pcs
4pcs
A 4pcs
Bottom Panel
B 1pc
2
A
STEP 1
1.1 Attach Long Pole (1), Top Cap (2) and Round Leg (3) to Bottom Panel (B).
1.2 Attach Shelf Panel (A) and tigthen Long Pole (1) , as shown:
STEP 2
Attach Top Panel (A) and tighten Top Cap (2), as shown:
1
A
A
A
B
3
USEFUL HINTS BEFORE YOU START:
1. Read each step carefully before starting.
2. It is important that each step is performed in correct order to avoid difficulties.
3. Identify, sort and count the parts before assembly.
4. Assemble your furniture on packaging cardboard to prevent scratch or damage.
5. Clean the product with mild cleanser using soft damped cloth. Do not use harsh or abrasive cleanser.
6. Using uncompatible hardware might cause damage to product.
A
finished surface
A
finished surface
A
finished surface
finished
B
surface
STEP 1.4
STEP 1.3
STEP 1.2
STEP 1.1
Long Pole - 12pcs
Top Cap - 1pc
Round Leg - 4pcs
A
A
A
A
B
Top Cap - 3pcs
FINISHED SURFACE
2 3
Loading...