Red Barrel Studio RDBS5422 Owner Manual

Page 1
Page 1 of 11
Page 2
Page 2 of 11
Page 3
Page 3 of 11
Page 4
Page 4 of 11
Page 5
CAM LOCK FASTENER ASSEMBLY INSTRUCTIONS
Page 5 of 11
Page 6
Page 7
ASSEMBLY INSTRUCTIONS
Identifying Drawer's Rails (a.k.a. Runners, Glides, Slides or Guides)
An assembly of ONE drawer requires a set of 4 different rails: right panel rail, left panel rail, right drawer rail and left drawer rail. To identify which rail belongs to which part, please read completely first before assembling.
To Determine Right/Left Panel Rail: Place the panel rail flat on its back with the roller position on the left hand side. If there are two holes above the roller and the other end is slightly downward angle then it is the LEFT PANEL RAIL. If there are two holes below the roller and the other end is slightly upward angle, then it is the RIGHT PANEL RAIL. The right and left panel rails are mirror image of each other. If needed, label or separate each rail for easy identification.
To Determine Right/Left Drawer Rail: Place the drawer rail with the round and oval holes resting
flat on the surface with its roller on the right hand side. If the roller is facing the top, then it is the LEFT DRAWER RAIL and if the roller is facing the bottom, then it is the RIGHT DRAWER RAIL. The right and left drawer rails are mirror image of each other. If needed, label or separate each rail for easy identification.
Mounting the Panel Rail: The panel rail is constructed to be mounted flat. Make sure the roller is position on the front of the panel and the screw holes are aligned with the pre-drilled holes of the panel.
Mounting the Drawer Rail: The drawer rail is constructed to be mounted on the side of the drawer . Make sure the roller is position on the SIDE REAR of the drawer and the screw holes are aligned
with the pre-drilled holes on the side of the drawer .
6
STEP : 1
Hardware 1 x 2 pcs Hardware 2 x 2 pcs Hardware 3 x 2 pcs Hardware 6 x 4 pcs Hardware 7 x 2 pcs drawer rails Hardware 8 x 4 pcs Hardware 9 x 1 set
9
8
I
7
2
3
3
Dowel hole
H
Right Drawer Rail
Front View
Side View
6
H
7
8
Page 7 of 11
Page 8
ASSEMBLY INSTRUCTIONS
STEP : 2
Hardware 1 x 12 pcs Hardware 3 x 6 pcs Hardware 7 x 2 pcs panel rails Hardware 8 x 4 pcs
B
3
3
F
G
Dowel hole
3
X4
7
D
D
Right Panel Rail
Page 8 of 11
Page 9
STEP : 3
Page 9 of 11
Hardware 2 x 2 pcs
finish
ASSEMBLY INSTRUCTIONS
finish
F
2
2
Dowel hole
STEP : 4
Hardware 2 x 2 pcs Hardware 5 x 4 pcs
D
2
F
D
2
B
5
Page 10
Page 10 of 11
STEP : 5
Hardware 2 x 4 pcs
ASSEMBLY INSTRUCTIONS
STEP : 6
Hardware 2 x 4 pcs
Page 11
Page 11 of 11
STEP : 7
Hardware 10 x 4 pcs
Hardware 11 x 4 sets
ASSEMBLY INSTRUCTIONS
STEP : 8
Make sure the unit is rested on a flat
surface and does not feel loose or wobbly. If it does, double check all
bolts/screws are secured and properly
tightened.
ASSEMBLY IS COMPLETED
Loading...