
NSTALLATION
Junction
Box
Mounting
Screw
Box
Screw
Crossbar
A
C
B
D
E
White or
HOUSE
Black
WIRES
(Hot)
Smooth
FIXTURE
WIRES
Black or
Ribbed
WIRES
FIXTURE
Bare Copper(Ground)
FIXTURE
WIRES
Copper
(Ground)
HOUSE
(Neutral)
WIRES
White
Bare
Green or
WIRES
HOUSE
NSTALLATION
I NSTALLATION
NSTALLATION INSTRUCTIONS
Flush
For
Flush
For Flush
Flush Mount
INSTRUCTIONS
INSTRUCTIONS
INSTRUCTIONS FOR
Mount
Mount
Mount Ceiling
Ceiling
Ceiling
Ceiling Fixtures
Fixtures
Fixtures
Fixtures
FOR
FOR
FOR
WARNING! SHUT POWER OFF AT FUSE OR CIRCUIT BREAKER .
MOUNTING
MOUNTING
MOUNTING
MOUNTING THE
1. Shut off the power at the circuit breaker box. Remove old
fixture and all hardware from Junction Box.
2. Carefully unpack your new fixture and lay out all the parts on a
clear area. Take care not to lose any small parts necessary for
installation.
3. Attach the mounting screw part way into the side hole of the
crook cross bar , then lock it securely with hex nut until
becoming .
4. Attach the cross bar to the Junction Box with the two Box
screws as shown. The side of the cross bar marked " GND "
must face out.
5. While holding the column assembly towards the ceiling,
connect the electrical wires as Shown in Fig.2, making sure
that all wire nuts are secured.
connections with electrical tape. If your outlet has a ground
wire (green or bare copper) , connect the fixture ground wire
to it . Otherwise connect fixture’s ground wire directly to the
Mounting strap with the green screw provided. After wires
are connected, tuck them carefully inside the Junction Box.
6. P ut the canopy (A) onto the junction box, aligning screws on
cross bar with mounting holes in canopy and lock it securely
with the ball nuts(B).
THE
FIXTURE
THE
FIXTURE
THE FIXTURE
FIXTURE (Fig.1)
(Fig.1)
(Fig.1)
(Fig.1)
You
may have to wrap the
Fig.1
7.
7.
7.
7. Hook the end of pipe(C) to the loop (E) and the glass(D)
8.
8.
8.
8. Install the light bulbs in accordance with the fixture
NOTE:
box
box
box and
NOTE:
NOTE: DO
WATTAGE.
WATTAGE.
WATTAGE.
WATTAGE.
and
and
and test
specifications. NOTE:
SPECIFIED
SPECIFIED
SPECIFIED
SPECIFIED
Your
installation
Your
installation
Your
Your
installation
installation is
junction
junction
junction
junction box
is
is
is now
test
test
test the
DO
DO
DO NOT
now
now
now complete.
the
fixture.
the
fixture.
the fixture.
fixture.
NOT
NOT
NOT EXCEED
complete.
complete.
complete. Return
EXCEED
EXCEED
EXCEED THE
Return
Return
Return power
power
power
power to
to
to
to the
Fig. 2
THE
THE
THE
’
s
the
the
the
MIN 90 ℃ SUPPLY CONDUCTORS