
22W LED Wilson
Bulkheads
Installation Instructions P.1.
For models: WIL22LEDE, WIL22LEDCE
This installation must be carried out by an electrician.
Please read these instructions carefully before installation.
Leave a copy for the user/maintenance engineer for future reference.
Specification
• Bulkhead LED fitting
• Class I (must be earthed)
• Lamp type: 264 SMD LEDs
• Colour Temperature: 4000K
• IP20 Rated.
• Supply voltage: 220-240v
• Polycarbonate Diffuser & powder coated Steel Base.
Important Installation Information
• Installation should be carried out in accordance with the
latest edition of the I.E.E. wiring regulations (BS7671) and
taking into consideration the latest Building Regulations. If
in doubt, consult a qualified electrician.
IMPORTANT: Ensure that ALL electrical connections
are tight with no loose strands, including factory made
connections.
• All luminaires run hot. It is the installer’s responsibility to
consider fire risk and take appropriate precautions.
• Input voltage – 220-240v 50HzAC
• The luminaire must not, under any circumstances, be
covered with any insulation materials and luminaires must
not be installed close to flammable materials.
• Before commencing installation or maintenance, ensure
electricity is switched off at the mains.
Important User Information
• Always switch off mains supply before servicing.
Installation Instructions
• Select the required position for the luminaire and provide
a suitable power supply to this point, taking into account the
possible power entry points of the luminaire.
• Remove the Diffuser cover from the body.
• Feed the power cables into the enclosure.
• Fix the base to the wall or ceiling as required. Locate
joists, be aware of water pipes and electric cables when
applying the fixing screws.
• Connect the mains supply cables to the terminal blocks
supplied as follows:
• Permanent LIVE 1 - to terminal marked L1.
• Switched LIVE 2 - to terminal marked L2.
• NEUTRAL - (blue) to terminal marked N.
• EARTH - (green / yellow) to terminal marked N.B. These
luminaires must be earthed.
• Please Note: For Emergency versions there will also be
an un-switched permanent LIVE which is connected to the
terminal marked Permanent Live.
• Ensure there are no exposed conductors, loose strands or
trapped insulation.
• Refit the diffuser cover.
• Switch on the power supply.
Product is suitable for
mounting on flammable
material
Product complies with
all relevant European
standards
Guarantee
This product is guaranteed for a period of 2 years from the date of purchase. The guarantee is invalid in the case of improper use, tampering, removal of the Q.C. date label, installation
in an improper working environment or installation not according to the current edition of the I.E.E. Wiring Regulations (BS7671). The guarantee is also invalidated if the luminaire has
been Mega tested. Should this product fail during the guarantee period it will be replaced free of charge, subject to correct installation and return of the faulty unit. We do not accept
responsibility for any installation costs associated with the replacement of this product. We reserve the right to alter specifications without prior notice.
Red Arrow Trading
Elsworth House, Herries Road South
Sheffield, S6 1QS
T: 0800 195 0006 F: 0870 043 3946
E: sales@redarrowtrading.com www.redarrowtrading.com

22W LED Wilson
Bulkheads
Installation Instructions P.2.
For models: WIL22LEDE, WIL22LEDCE
Testing
The emergency light must be tested and inspected regularly in accordance
with local codes of practice. Note: for safety reasons, tests should be carried
out during daylight hours.
The minimum recommended test schedule is as follows:
After installation, allow 36 hours to ensure full battery charge, and then
interrupt the supply; check after 3 hours that the LED is still illuminated.
1. Check that the charge indicator LED is working
2. Monthly – interrupt the power supply for a short period and check the LED is still illuminated.
3. Six-monthly – check one hour duration
4. At the end of 3rd year, and annually thereafter – check 3 hour duration: batteries must be replaced when they can no
longer support 3 hour operation.
5. Complete record sheet on installation and retain in maintenance file.
6. Update file with on-going test records for inspection by fire officer or other duly authorised person.
Installation and Maintenance Record
Month Test Year 1 Year 2 Year 3 Year 4 Year 5
signed date signed date signed date signed date signed date
1
short
2
short
3 short
4 short
5 short
6 1 hour
7 short
8 short
9 short
10 short
11 short
12 short x x x x
3 hour x x x x x x
Red Arrow Trading
Elsworth House, Herries Road South
Sheffield, S6 1QS
T: 0800 195 0006 F: 0870 043 3946
E: sales@redarrowtrading.com www.redarrowtrading.com