Red Arrow SNCF550 Installation Instructions

BASTION SITE 110V LED NON-CORROSIVE FITTINGS
FOR MODEL: SNCF220, SNCF220E, SNCF420, SNCF420E, SNCF525, SNCF525E, SNCF550, SNCF550E
INTRODUCTION
The new 110V waterproof LED Non-Corrosive, with a streamlined body, quick terminal connector and multiple entry options.
SPECIFICATION
LED
1800-
4500lm
• Dimensions: SNCF220/E: L: 600 x W: 95 x D: 75mm SNCF420/E: L: 1200 x W: 95 x D: 75mm SNCF525/E & SNCF550/E: L: 1500 x W: 95 x D: 75mm
Automatic Circuit Breaker Type
Rated Current
INSTALLATION INSTRUCTIONS
(Ampere)
Installation (mm²)
20W 25/20 100/80 100/80 100/80 160/140 100/80 100/80 100/80 160/140
25W 20/15 80/60 80/60 80/60 130/110 80/60 80/60 80/60 130/110
50W 10/8 40/32 40/32 40/32 64/54 40/32 40/32 40/32 64/54
• LED: 96-264pcs of 0.2W 2835
• Working Temperature: Standard: -10°C - 40°C / Emergency: 0°C - 40°C
• 1 x Base
• 1 x Diuser
• 1 x LED Tray
• 6/10/12 Diuser Clips (dependent on length of fitting)
• 20mm Gland
• Mounting Brackets
• Screws
110817 PO 2900
Red Arrow Trading
Elsworth House, Herries Road South Sheeld, S6 1QS
50/
80 Ra
20W-
50W
T: 0800 195 0006 F: 0870 195 0006 E: sales@redarrowtrading.com www.redarrowtrading.com
110V
IP65
B6 B10 B13 B16 B20 C10 C13 C16 C20
6A 10A 13A 16A 20A 10A 13A 16A 20A
1.5 1.5 1.5 1.5 2.5 1.5 1.5 1.5 1.5
IK07
4000K
60Hz
L
LF
W
H
L
LF
340
830
940
Emergency
8mm
BASTION SITE 110V LED NON-CORROSIVE FITTINGS
FOR MODEL: SNCF220, SNCF220E, SNCF420, SNCF420E, SNCF525, SNCF525E, SNCF550, SNCF550E
SAFETY WARNING
• The installation should be carried out by a qualified electrician in compliance with the current edition of the IEE Wiring Regulations.
• Prior to installation carry out the necessary risk assessment considering the people who could be at risk, the level of risk and the precautions required to control the risk.
• Ensure that the circuit supply is isolated either by the circuit supply fuse being removed or the applicable circuit breaker being turned o before installation or any maintenance.
• Check the total load on the circuit including the luminaire does not exceed the rating of the circuit cable, fuse or circuit breaker.
• If the fitting incorporates control gear, ensure careful sizing to avoid instances of nuisance tripping of the protective device used in the installation.
Follow the provided installation instructions, using the fixings supplied or recommended.
INSTALLATION DIAGRAMS
1. Mark the locations of where the fitting is to be placed, then drill 6mm holes for the brackets.
2. Insert the expansion plug into the holes drilled and fix the brackets using the screws.
3. Clip the body of the fitting to the brackets in the correct positions and insert the supply cable through the compression gland.
INSTALLATION INSTRUCTIONS
4. Raise the LED tray to the body and attach the supply cable into the terminal block on the back of the LED tray, tighten the compression gland and then clip the LED tray into the body. Standard Emergency
5. Place the diuser into the body and ensure all the diuser clips are clipped into place and seated correctly.
6. Turn the power back on to the circuit being worked on and make sure the fitting is working correctly.
Red Arrow Trading
Elsworth House, Herries Road South Sheeld, S6 1QS
T: 0800 195 0006 F: 0870 195 0006 E: sales@redarrowtrading.com www.redarrowtrading.com
BASTION SITE 110V LED NON-CORROSIVE FITTINGS
FOR MODEL: SNCF220, SNCF220E, SNCF420, SNCF420E, SNCF525, SNCF525E, SNCF550, SNCF550E
TESTING
Product Type: .................................. Product Location: ................................
MONTH TEST FIRST
1 FUNCTIONAL
2 FUNCTIONAL
3 FUNCTIONAL
4 FUNCTIONAL
5 FUNCTIONAL
6 FUNCTIONAL
7 FUNCTIONAL
8 FUNCTIONAL
9 FUNCTIONAL
10 FUNCTIONAL
11 FUNCTIONAL
12 FUNCTIONAL
INSTALLATION INSTRUCTIONS
YEAR
Signed Date Signed Date Signed Date Signed Date Signed Date
SECOND
YEAR
THIRD
YEAR
FOURTH
YEAR
FIFTH YEAR
Installed By: .................................. Installation Date: ................................
Contact Details: ..........................................................................................................
...........................................................................................................
Red Arrow Trading
Elsworth House, Herries Road South Sheeld, S6 1QS
T: 0800 195 0006 F: 0870 195 0006 E: sales@redarrowtrading.com www.redarrowtrading.com
BASTION SITE 110V LED NON-CORROSIVE FITTINGS
FOR MODEL: SNCF220, SNCF220E, SNCF420, SNCF420E, SNCF525, SNCF525E, SNCF550, SNCF550E
MAINTENANCE
• Clean with a soft dry cloth, do not use any aggressive cleaning products or solvents which may damage the fitting.
• When this fitting comes to the end of it’s life or you choose to replace it, please do not dispose of it with your normal household waste. Please recycle where the facilities exist, check with your local authority or retailer for suitable options.
ADDITIONAL INFORMATION
• 90lm/W
• Yellow finish
• Opal diuser
INSTALLATION INSTRUCTIONS
GUARANTEE
This product is guaranteed for a period of 2 years from the date of purchase. The guarantee is invalid in the case of improper use, tampering, removal of the Q.C. date label, installation in an improper working environment or installation not according to the current edition of the I.E.E. Wiring Regulations (BS7671). The guarantee is also invalidated if the luminaire has been Mega tested. Should this product fail during the guarantee period it will be replaced free of charge, subject to correct installation and return of the faulty unit. We do not accept responsibility for any installation costs associated with the replacement of this product. Your statutory rights are not aected. We reserve the right to alter specifications without prior notice.
Red Arrow Trading
Elsworth House, Herries Road South Sheeld, S6 1QS
T: 0800 195 0006 F: 0870 195 0006 E: sales@redarrowtrading.com www.redarrowtrading.com
Loading...