Pre-Installation
• Slide Upper Collar through
Outer Riser Pipe. If collar does
not slide freely through pipe,
check to see if pipe is
“out-of-round”. If so, replace
Outer Riser Pipe.
• Backwater valves require
adequate drop between the
ood rim of the lowest xture
and burial depth of the valve in
order to function properly.
We recommend a minimum
slope of 1/4” per foot or as
recommended by the UPC
and IPC codes.
• Additional PVC bushings are
enclosed for use if needed.
Discard if not used.
FINGER HOLE
▼
▲
THUMB SCREW
◄ THREADED PLUG
& ADAPTOR
Optional
NOTCH
▼
▲
REFERENCE
NOTCH
See step 8
Inner Riser Assembly
Outer Riser Assembly
VALVE BODY ▲
SEWER LATERAL ▲
Outer Riser Installation
At proper depth, install the Clean Check Valve Body
1
between the building and the sewer lateral, with the “FLOW”
arrow of the Valve Body pointing downstream away
from the building.
Rotate the Valve Body until the opening is facing directly
2
upward. A level may be used across the top of the Valve Body
to verify horizontal positioning.
Cut the Outer Riser Pipe to the required length. Cement
3
and insert while keeping the inside of the body clean of debris.
CAUTION: Be certain that excess solvent cement has not
impeded proper seating of the Flapper Assembly or the proper
seating of the apper sealing surface of the Valve Body.
Inner Riser Installation
4
Cut the Inner Riser Pipe to a length (3-1/2”) shorter than
the Outer Riser Pipe.
5
Cement the Flapper Assembly to one end of the Inner
Riser Pipe.
OUTER RISER PIPE ►
not included
INNER RISER PIPE ►
Parts not provided
• Standard 8” or 6" ABS or
PVC Outer Riser Pipe of re-
quired length, and one 8" or 6"
Threaded Adaptor & Plug
(8" or 6" Outer Riser Pipe
is determined by the Clean
Check model to be used)
• Standard 4” ABS or PVC
Inner Riser Pipe of required
length.
FLAPPER ASSEMBLY ►
BUSHING ►
Bushings are provided for PVC
schedule 40x SDR-35 installations
Building
not included
◄ FLAPPER
Heavy Duty
Rated at 75 PSI
6
Cement the Upper Collar to the other end of the Inner Riser
Pipe, while aligning the center of the Finger Hole with the center
of the Flapper on the opposite end.
7
When cement is dry, loosen the thumb screw in the Upper Collar
and slide the Inner Riser Assembly – Flapper Assembly rst –
into the Outer Riser Assembly with the at sealing side of the
Flapper facing the inlet side of the Valve Body. Lower the Inner
Riser Assembly into the seating area of the Valve Body, making
certain that the Thumb Screw is inside the inside wall of
the Outer Riser Pipe and NOT on
the resting on the top edge. Seat
the Flapper Assembly by rotating
as necessary until it locks in place.
Visually inspect that the Flapper
Assembly is installed correctly.
IMPORTANT: Prior to installation
8
of the Threaded Adaptor & Plug
(with the Inner Riser Assembly
properly installed) cut a reference
notch into the Outer Riser Pipe.
This saw cut notch should be
aligned with the molded Notch in
the Upper Collar. For future removal,
alignment of the notches will
quickly indicate that the apper is
seated correctly.
VALVE BODY ►
®
Contact: RectorSeal
P F W
9
IMPORTANT: Tighten the ¼” Stainless Steel Thumb Screw
until it seats snugly against the Inner Riser Pipe, xing the Inner
Riser Assembly in place.
Cement the Threaded Adapter to the Outer Riser Pipe
10
riser and screw the Threaded Plug into the
Threaded Adapter to complete installation.
Sewer

Hubsett™ Test Coupling
Application
• Allows the buildings drain waste and vent system to be connected to the
sewer line prior to the initial test • Easily removed with one
quick pull on the release cord
Recommended for
Includes
• Uniquely designed coupling and test device all in one
• ABS • PVC
• Dome • Coupling • Float
Float
Dome
Coupling
R
E
I
A
N
D
-
S
Y
T
T
O
O
C
K
S
H
I
P
FEATURES
• Holdspressureeverytime
• Safetouse
• Nopumporspecialtools
needed
• Testwithairorwater
• 12ft.cord
Scan for more info
Tom-Kap™ Flush-t cleanout adaptor & plug
Application
flush-finished cleanout for DWV systems
Recommended for
Includes
• Threaded adapter cements inside the pipe, providing a
• Schedule 40 • SDR-35 • Foam core
• Top fitting • Cap
FEATURES
• Reducesinstallationcost
• Simplifiesrough-in
RectorSeal®
2601 Spenwick Drive - Houston, TX 77055
ph: 713.263.8001 - 800.231.3345
fax: 713.263.7577 - 800.441.0051
www.rectorseal.com - Like Us on Facebook
Scan for more info