Raypak CHX User Manual

Condensing High-efficiency System
for Pool, DHW and Heating
• 98% thermal efficiency at full fire
• Top or rear CHX mounting options: low profile or small footprint, your choice!
• 399,000 - 1,999,000 BTUH in single­heater configurations; up to 4,000,000 BTUH using racked heater / CHX systems
• Improved load-tracking with up to eight firing stages
• Self-contained secondary heat exchanger can be inspected and maintained without disturbing the vent or plumbing connections
• Exceeds all NOx emission standards
• Straight tube heat exchanger outlasts other designs and facilitates scale-free operation – ideal for DHW applications
• Fully-engineered rack systems simplify jobsite installation and set-up
• Indoor / Outdoor installation
• Fully certified vent systems available
• Full range of control options offering Building Management System compati ­bility and single-source accountability
• Front-access heater controls, burner and heat exchanger
Top-mounted CHX shown
The Raypak Hi Delta with CHX achieves an unequaled 98% thermal efficiency at full fire. It combines the reliability of the Hi Delta heater with an optional CHX heat exchanger which prevents condensation in the heater’s primary combustion chamber. The result – an ultra high efficiency heater that lasts.
WITH CHX
LonWorks
®
compatible with
Raypak Y-200 heater control
FROM THE HOT WATER MANAGEMENT EXPERTS
SM
402
through
2002
Models
HI DELTA™ with CHX
Top-mounted CHX
RAYPAK, INC.
2151 Eastman Avenue •Oxnard, CA 93030
805-278-5300 • Fax 800-872-9725
Raypak, Inc. reserves the right to make product changes or improvements at any time without notice. Catalog No.: 1000.17C Effective: 02-15-08 Replaces: 09-01-06 Litho in U.S.A. ©2008 Raypak, Inc.
THE HOT WATER MANAGEMENT EXPERTS
SM
www.raypak.com
Vent System Flexibility
Rear-mounted CHX
DHW (dual pump) piping shown
Stacked Boilers and CHXs
lacipyT
snoitacilppA
uPtaeH
,pm
looP
,tleMwonS,WHD
roolFtnaidaR
,WHD
roolFtnaidaR
,cinordyH
retaWssecorP
Pool Heating or Low-temperature System
(primary/secondary) piping shown
Space Heating (primary/secondary) piping shown
rotcartxE/naFtneV
mumixaM
retaWtelnI
erutarepmeT
F°001otpU
F°021otpU
F°041otF°021
F°041evobA
etatSydaetS
deepSdexiF
detnuom-fooR
repmaD.raB
ItaC
tneV"B"roCVP
ItaC
tneV"B"roCVPC
VItaC
CVPC
ItaC
tneV"B"
dexiF
deepS
enilnI
repmaD.raB
VItaC
CVP
VItaC
CVPC
toN
eR
dednemmoc
VItaC
C4-92LA
deepSdexiF
.dtm-gnilieCro-llaW
repmaD.raB
ItaC
tneV"B"roCVP
ItaC
tneV"B"roCVPC
toN
dednemmoceR
ItaC
tneV"B"
deepSelbairaV llawediS/fooR
repmaD.raBoN
VItaC
CVP
VItaC
CVPC
VItaC
CVPC
VItaC
C4-92LA
Loading...