Raypak 2-10VDC Installation Manual

This manual should be maintained in legible condition and kept adjacent to the heater or in another safe place for future reference.
Catalog No. 5000.64B Effective: 09-19-08 Replaces: 03-25-08 P/N 241224 Rev. 3
INSTALLATION & OPERATING
INSTRUCTIONS
Used with Y-200 Series Electronic
Boiler Sequencer & Outdoor Reset
Y-305 4-20 mA / 2-10 VDC
Input Control Module
2
Introduction
The Raypak Y-200 Series Controller, equipped with the Y-305 4-20 mA / 2-10 VDC Module, provides the ultimate in temperature setpoint control for Raypak boiler applications. The Y-305 4-20 mA / 2-10 VDC Module provides a conversion, from either a milliamp or a voltage input from an outside control source, to a setpoint temperature reading on the Y-200 series con­troller LCD panel.
The Module is provided in a kit which includes the nec­essary hardware to install the board onto the Y-200 control board. This manual should be used in conjunc­tion with the Y-200 Series Installation & Operating Manual (Catalog No. 5000.62, P/N 241125).
Important Safety Instructions
IMPORTANT NOTICE: These instructions are
intended for use by qualified personnel who are specifically trained and experienced in the installa­tion of this type of equipment and related system components. Some states may require that installa­tion and service personnel be licensed. Only quali­fied persons shall attempt to repair this equipment. Repair must be done according to the instructions provided.
WARNING: Improper installation, adjustment, alteration, service or maintenance may damage the equipment, create a hazard resulting in asphyxia­tion, explosion, fire, electric shock, personal injury or property damage, and void the warranty.
CAUTION: This appliance has provisions to be connected to more than one (1) supply source. To reduce the risk of electric shock, disconnect all con­nections before servicing.
CAUTION: Risk of electric shock: More than one (1) disconnect switch may be required to de-ener­gize the equipment before servicing.
NOTE: Minimum 18 AWG, 105°C, stranded wire must be used for all low voltage (less than 30 volts) external connections to the unit. Solid conductors should not be used because they can cause exces­sive tension on contact points. Install conduit as appropriate. All high voltage wires must be the same size (105°C, stranded wire) as the ones on the unit or larger.
Installation
1. Verify that the control signal is within the 4-20 mA / 2-10 VDC parameter.
2. Turn off the power to the Y-200.
3. Open the front cover of the Y-200 to access the display/keypad door.
4. Open the display/keypad door to access the Y-200 Control Board (P/N 601670).
5. Secure the nylon standoff (P/N 550767) onto the Y-200 Control Board as shown in Fig. 1.
6. Plug the Y-305 4-20 mA / 2-10 VDC Module into the Y-200 Control Board at the J20 expansion port (10-pin plug), securing Module with nylon standoff.
7. Attach 4-20 mA / 2-10 VDC signal wires to 2-pin plug connector (P/N 650935).
8. Plug 2-pin connector into either the J1 or J2 con­nection of Module (J1 for 4-20 mA operation, J2 for 2-10 VDC operation).
Rev. 3 reflects the following: Changes to: The text in paragraph one of the Introduction section on page 2; steps 5 and 6 of the Installation section on page 2; Fig. 1 on page 3; steps 1 and 2 of the 4-20 mA Mode section on page 4; steps 1 and 2 of the 2-10 VDC Mode section on page 4.
3
Fig. 1: Components
Hole for nylon stand-off
Y-305 4-20 mA /2-10 VDC Module
(P/N 601740)
Nylon stand-off (P/N 550767)
2-pin plug connector (P/N 650935)
Y-200 Control Board (P/N 601670)
Loading...
+ 5 hidden pages