Raychem LVSA-3 Installation Manual

Page 1
Product Installation Instructions
LVSA-3 600/1000V 3/C Splice
Plastic- or Rubber-insulated Corrugated- or Interlocked Armored Cable
Raychem Corporation Electrical Products Division
PII-51030, Rev AB DCR C28328 PCN 304126-000 Effective Date: August 21, 1996
Page 2
Suggested Installation Equipment (not supplied with kit)
Cable preparation tools
Raychem P63 cable preparation
kit or cable manufacturer approved solvent
Clean, lint-free cloths
Non-conducting abrasive cloth,
120 grit or finer
• Electrician's tape
Recommended Raychem Torches
Install heat-shrinkable cable accessories with a "clean burning" torch, i.e., a propane torch that does not deposit conductive contaminants on the product.
Clean burning torches include the Raychem FH-2629 (uses refillable propane cylinders) and FH-2616A1 (uses disposable cylinder).
Safety Instructions
General Instructions
Connector(s) and installation tools
Raychem recommended torch
Warning: When installing electrical
power system accessories, failure to follow applicable personal safety requirements and written installation instructions could result in fire or explosion and serious or fatal injuries.
Adjusting the Torch
Adjust regulator and torch as required to provide an overall 12­inch bushy flame. The FH-2629 will
Cleaning the Cable
Use an approved solvent, such as the one supplied in the P63 Cable Prep Kit, to clean the cable. Be sure to follow the manufacturer's instructions. Failure to follow these instructions could lead to product failure.
To avoid risk of accidental fire or explosion when using gas torches, always check all connections for leaks before igniting the torch and follow the torch manufacturer's safety instructions.
To minimize any effect of fumes produced during installation, always provide good ventilation of confined work spaces.
be all blue, the other torches will have a 3- to 4-inch yellow tip. Use the yellow tip for shrinking.
Some newer solvents do not evaporate quickly and need to be removed with a clean, lint-free cloth. Failure to do so could change the volume resistivity of the substrate or leave a residue on the surface.
As Raychem has no control over field conditions which influence product installation, it is understood that the user must take this into account and apply his own experience and expertise when installing product.
Regulator Pressure
FH-2616A1 Full pressure FH-2629 15 psig
Please follow the manufacturer's instructions carefully.
General Shrinking Instructions
Apply outer 3- to 4-inch tip of the
flame to heat-shrinkable material with a rapid brushing motion.
Keep flame moving to avoid scorching.
Unless otherwise instructed, start shrinking tube at center, working flame around all sides of the tube to apply uniform heat.
PII-51030, Rev AB DCR C28328
To determine if a tube has completely recovered, look for the following, especially on the back and underside of the tube:
1. Uniform wall thickness.
2. Conformance to substrate.
3. No flat spots or chill marks.
4. Visible sealant flow if the tube is coated.
2
Note: When installing multiple
tubes, make sure that the surface of the last tube is still warm before positioning and shrinking the next tube. If installed tube has cooled, re-heat the entire surface.
PCN 304126-000 Effective Date: August 21, 1996
Page 3
Installation Instructions
Table 1 Cable Cutback Dimensions
Nominal Connector Cable Length
Kit Size Max A B C D L
LVSA-3-1 #6-#2 AWG 3-1/2” 11” 7” 8” 4” 1/2 connector
(89mm) (279mm) (178mm) (203mm) (102mm)
LVSA-3-2 #1-4/0 AWG 4” 15” 9” 12” 6” 10%
(102mm) (381mm) (229mm) (305mm) (152mm)
LVSA-3-3 250-500 kcmil 5” 19” 12” 14” 7”
(127mm) (483mm) (305mm) (356mm) (178mm)
length plus
1. Prepare cable.
Refer to Table 1 and prepare the cables as shown. Remove any fillers to the armor cutback. Bend back the grounding conductors(s) over the jacket as shown.
2. Clean cables.
Using an approved solv ent, clean the cables as shown.
Note: An armored cable is used as an example. All instructions apply to both armored and unarmored cable unless otherwise stated.
3. Place tubes over phases.
Place one black sealing tube over each phase as shown (on long side).
Grounding Conductor(s)
Black Sealing Tube
C
L
A
C D
Insulation
L
Clean
B
Grounding Conductor(s)
2005
Clean
2006
Protect tubes from end of conductor as they are placed over cable end.
4. Install connectors.
After installation, deburr connectors.
PII-51030, Rev AB DCR C28328
2007
Connector
2008
3
PCN 304126-000 Effective Date: August 21, 1996
Page 4
5. Position blac k sealing tubes; shrink in place.
Make sure each tube is centered ov er the connection area. Shrink all three tubes in place at the same time.
Begin shrinking at center of tubes (1), working torch with a smooth, brushing motion around the tubes. After center portion shrinks, work torch as before toward one end (2), then to the opposite end (3).
Note: Do not point the flame directly at the cable insulation.
6. Connect grounding conductor.
Bend the grounding conductor(s) back over the tubes and splice with a suitable connector .
Black Sealing Tubes
Grounding Conductor
Installation Instructions
2
1
3
Connector
2014
2015
7. Install armorcan.
Center armorcan over splice, equally overlapping the exposed armor on both sides.
Tape the shells together in the center. Pull the aluminum fingers down on the bare cable armor and tape in place.
Clean the cable jackets as shown.
8. Position wraparound sleeve.
Remove or tape over all sharp points to prevent puncture of wr aparound sleeve .
Remove backing from the wraparound sealing sleeve and center sleeve over splice. Slide metal channel(s) onto the butted rails.
Clean Jacket
(150mm)
6"
Tape
Metal Channel
Black Wraparound Sleeve
Clean Jacket
(150mm)
6"
TapeTape
1143a
1143b
418
PII-51030, Rev AB DCR C28328
4
PCN 304126-000 Effective Date: August 21, 1996
Page 5
9. Install channel clip.
If two channels are used, connect the channels with the short channel retention clip. Use pliers to install clip.
Note: Channel(s) must overlap sleeve edge by 1/4"
(5mm)
minimum.
10. Shrink the wraparound sleeve.
Begin shrinking at the center and work toward each end. Post heat the entire sleeve (concentrating on metal channel area) for 30 seconds after completely shrunk.
1/4" min.
(5mm)
Installation Instructions
Channel Clip
1/4" min.
(5mm)
419
This completes the splice. Note: Allow to cool before moving or
placing in service.
Adhesive Flow
(both ends)
420
PII-51030, Rev AB DCR C28328, PCN 304126-000 Effective Date: August 21, 1996
5
1996 Raychem Corporation Printed USA 8/21/96