
RAPID SPAN
Multiple packages
IMPORTANT - ASSEMBLY INSTRUCTIONS
AIS015
1 Join the upright Frames A using front and rear
beams C at the desired heights.
2 Insert the beam safety pin F.
3 Add chipboard supports E if the Heavy Duty
levels have been ordered.
For quantities per level see over.
4 Fit shelves D between front and rear beams C.
5 Secure the unit to the floor with fixings B, if
required.
NB: This shelving system is not designed to
be loaded by mechanical means, e.g. fork lift
truck. Always load and unload by hand.
ASSEMBLY
A
A
We advise the use of protective
gloves and goggles, or eyeglasses
when assembling this product.
Tools required: Rubber mallet, electric drill and metric spanners
C
D
E
B
F
C
E
D
B
If you have any problems with this product or its assembly, please contact your local distributor or
call our helpline on 01285 686868 where a team of experts will be pleased to help.

Upright frames
2 off
COMPONENTS
RAPID SPAN
Multiple packages
IMPORTANT - ASSEMBLY INSTRUCTIONS
AIS015
A
Keep heavier items
on the bottom shelves
Do not climb
on your shelving
Make sure it is on a
level and even floor
Keep your
shelving dry
SAFETY
C
Front and rear beams
1150 mm, 1500 mm, 1850 mm,
2250 mm or 2700 mm
D
Chipboard shelves
F
Beam safety pins
2 per beam - 4 per level
1 off per shelf level, width
and depth to suit
B
Floor fixing
2 off per frame
E
Chipboard supports
2000mm, 2500mm or 3000mm H
600mm or 900mm D
1150 mm beam - 2 per level
1500 mm beam - 3 per level
1850 mm beam - 4 per level
2250 mm beam - 5 per level
2700 mm beam - 6 per level
If you have any problems with this product or its assembly, please contact your local distributor or
call our helpline on 01285 686868 where a team of experts will be pleased to help.