Rapid Racking Rapid2 Budget bin bay 88, BBBAY88 Assembly Manual

Page 1
Rapid2
Budget bin bay 88
Assembly instruction
AIST004
Page 2
If you have any problems whatsoever please call 01285 686868 where a team of experts will be pleased to help.
BBBAY88
IMPORTANT - ASSEMBLY INSTRUCTIONS
Tools required: Rubber mallet
AIST004/88
We advise the use of protective gloves and goggles, or eyeglasses when assembling this product.
A
A
1 Fit plastic feet F to uprights A.
2 Assemble both ends first - A and B starting from
the bottom. Allow 7 clear holes between each shelf support B for the first two entries then 9 clear holes for the top two entries.
3 Tap together using rubber mallet.
4 Join both ends using front and rear beams C.
Add tie straps G.
5 Add shelves D.
6 Add boxes E.
ASSEMBLY
B
B
C
C
D
E
E
F
G
Page 3
If you have any problems whatsoever please call 01285 686868 where a team of experts will be pleased to help.
Uprights 4 of
COMPONENTS
BBBAY88
IMPORTANT - ASSEMBLY INSTRUCTIONS
AIST004/88
A
B
Side beams 10 of
All beams 305 mm D
Keep heavier items
on the bottom shelves
Do not climb
on your shelving
Make sure it is on a level and even floor
Keep your
shelving dry
Tie plates recommended
with more than one bay
4 per Joint
C
Front and rear beams 10 of
All beams 1525 mm W
D
Chipboard shelves 5 of
E
Budget Bins 88 of
SAFETY
All uprights 1600mm H
F
Plastic feet 4 of
28 x PB104B/L & 60 x PB103B/L
G
Wire shelf tie straps
Loading...