Rapid UHDX 75, UHDX 100, UHDX 125, UHDS 125, UHDS 75 Installation, Operation & Service Manual

...
Page 1
FOR YOUR SAFETY If you smell gas:
1. Open windows.
2. DO NOT try to light any appliance.
3. DO NOT use electrical switches.
4. DO NOT use any telephone in your building.
5. Extinguish any open flame.
6. Leave the building.
7. Immediately call your local gas supplier after leaving the building. Follow the gas supplier’s instructions.
8. If you cannot reach your gas supplier, call the Fire Department.
WARNING
Fire Hazard
UHD-Series
Tubular Duct Furnace
(Low Profile Range)
Installation, Operation
Models UHD[X][S]
75, 100, 125
Keep all flammable objects, liquids and vapors the minimum required clear­ances to combustibles away from heater.
Some objects will catch fire or explode when placed close to heater.
Failure to follow these instructions can result in death, injury or property damage.
WARNING
Improper installation, adjustment, alteration, service or maintenance can result in death, injury or property damage. Read the Installation, Operation and Service Manual thoroughly before installing or servicing this equipment.
Installation must be done by a contractor qualified in the installation and service of gas-fired heating equipment or your gas supplier.
Installer
Please take the time to read and understand
these instructions prior to any installation.
Installer must give a copy of this manual to the owner.
Owner
Keep this manual in a safe place in order to provide
your service technician with necessary information.
Rapid Engineering LLC
1100 Seven Mile Road NW Comstock Park, MI 49321 Telephone: +1.616.784.0500 Fax: +1.616.784.1910 Toll Free: 800.536.3461
© 2014 Rapid Engineering LLC
www.rapidengineering.com
P/N RP113000NA 11/14 Rev E
Page 2
Page 3
POUR VOTRE SECURITE
Si vous sentez une odeur de gaz:
1. Ouvrir les fenêtres.
2. N’essayer pas d’allumer un appareil.
3. N’utiliser pas d’interrupteurs électriques.
4. N’utiliser pas de téléphone dans votre bâtiment.
5. Eteindre flamme nue.
6. Quitter le bâtiment.
7. Après avoir quitté le bâtiment, appelez immédiatement votre fournisseur local de gaz. Suivre les instructions du fournisseur de gaz.
8. Si vous ne pouvez pas joindre votre fournisseur de gaz, appeler le service d’incendie.
UHD-Series
Appareil de chauffage conduit à
échangeur tubulaire
(Gamme compacte)
AVERTISSEMENT
Risque d’incendie
Garder tous les objets, liquides ou vapeurs inflammables à la distance minimale de l’unité de chauffage requise avec les matériaux combustibles.
Certains objets prendront feu ou exploseront s’ils sont placés à proximité de l’unité de chauffage.
Le non respect de ces instructions peut entraîner la mort, des blessures corporelles ou des dommages matériels.
Manuel d’installation,
d’operation, et de service
Modèles UHD[X][S]
75, 100, 125
AVERTISSEMENT
L’installation, le réglage, la modification, la réparation ou la maintenance inadapté peut entraîner la mort, des blessures ou des dommages matériels. Lire attentivement le manuel d'installation, d'utilisation et d'entretien avant d’installer ou de réparer cet équipement.
L’installation doit être effectuée par un entrepreneur qualifié dans l'installation et l'entretien d'appareils de chauffage au gaz ou par votre fournisseur de gaz.
© 2014 Rapid Engineering LLC
Installateur
Vouloir prendre le temps de lire et de comprendre ces
instructions avant toute installation. L’installateur doit
donner un exemplaire de ce manuel au propriétaire.
Propriétaire
Garder ce manuel dans un endroit sûr pour fournir les
informations nécessaires au personnel d’entretien.
Rapid Engineering LLC
1100 Seven Mile Road NW Comstock Park, MI 49321 Téléphone: +1.616.784.0500 Fax: +1.616.784.1910 Numéro sans fraís: 800.536.3461
www.rapidengineering.com
P/N RP113000FC 11/14 Rev E
Page 4
Page 5
TABLE OF CONTENTS
SECTION 1: Heater Safety...................................................... 1
1.1 Manpower Requirements .............................................1
1.2 Safety Labels and Their Placement..............................1
1.3 California Proposition 65 .............................................. 1
SECTION 2: Installer Responsibility .....................................4
2.1 Wall Tag .......................................................................4
2.2 Corrosive Chemicals....................................................4
2.3 National Standards and Applicable Codes................... 4
SECTION 3: Critical Considerations .....................................5
3.1 Basic Information .........................................................5
3.2 Manufactured Units......................................................5
3.3 Location and Suspension ............................................5
3.4 Minimum Required Installation Clearances .................5
3.5 Ventilation ....................................................................5
3.6 Gas Supply .................................................................. 5
3.7 Electrical Supply .......................................................... 5
3.8 Vent ..............................................................................5
SECTION 4: Clearances to Combustibles.............................6
4.1 Required Clearances to Combustibles......................... 6
4.2 Clearances to Combustibles ........................................6
SECTION 5: National Standards and Applicable Codes......7
5.1 Gas Codes................................................................... 7
5.2 Aircraft Hangars ...........................................................7
5.3 Parking Structures and Repair Garages...................... 7
5.4 Electrical ...................................................................... 7
5.5 Venting .........................................................................7
5.6 High Altitude.................................................................7
SECTION 6: Duct Heater Installation.....................................8
6.1 General ........................................................................8
6.2 Shelf Mounting and Suspension ..................................9
6.3 Wall Mounting ..............................................................9
SECTION 7: Venting .............................................................. 11
7.1 Changing Vent and Air Intake Orientation................... 11
7.2 Venting........................................................................ 11
7.3 Vent Installation .......................................................... 11
7.4 Horizontal Venting.......................................................12
7.5 Vertical Venting ........................................................... 12
7.6 Length Requirements .................................................12
7.7 Vent Material............................................................... 12
7.8 Replacing an Existing Heater in a Venting System ..... 12
SECTION 8: Air Supply......................................................... 18
8.1 Separated Combustion Installation ............................18
8.2 Building Ventilation..................................................... 18
8.3 Outside Combustion Air Supply .................................18
SECTION 9: Gas Piping ........................................................19
9.1 Connections............................................................... 19
SECTION 10: Wiring ..............................................................21
10.1 Positioning Thermostats........................................... 21
10.2 Low Voltage Thermostat with One Heater................21
10.3 UHD[X][S] Series Internal Wiring Diagram...............22
10.4 UHD[X][S] Series Ladder Wiring Diagram ...............23
10.5 Electrical Connection to the Heater..........................24
SECTION 11: Operation and Maintenance ......................... 25
11.1 Pre-Start-Up Checks ................................................ 25
11.2 Begin Start-Up ......................................................... 25
11.3 Pressure Switch........................................................ 27
11.4 Turning Off the Heater .............................................. 27
11.5 External Controls...................................................... 27
11.6 Complete Start-Up ................................................... 27
11.7 Instruction to the User .............................................. 27
SECTION 12: User Instructions........................................... 28
12.1 Heater Operation..................................................... 28
12.2 Common User Controls........................................... 28
12.3 Lighting Instructions ................................................ 29
12.4 Simple Troubleshooting ........................................... 29
SECTION 13: Servicing ........................................................ 30
13.1 Servicing Instructions .............................................. 30
13.2 Burner Maintenance................................................ 30
13.3 Heat Exchanger Maintenance ................................. 30
13.4 Gas Valve Maintenance ........................................... 30
13.5 Flue Blower ............................................................. 30
13.6 Venting and Air Intake Pipe ..................................... 31
13.7 Maintenance Checklist ............................................ 31
SECTION 14: Troubleshooting............................................. 33
14.1 General.................................................................... 34
14.2 Troubleshooting For Automatic Ignition Burner
Systems.................................................................. 35
14.3 Troubleshooting for Flame Supervision System....... 36
14.4 Troubleshooting for Gas Valves ............................... 37
14.5 Troubleshooting for Flue Blower .............................. 37
SECTION 15: Replacement Parts........................................ 38
15.1 Gas Valve ................................................................ 38
15.2 Burner Injectors....................................................... 39
15.3 Ignition Electrode and Flame Probe ........................ 40
15.4 Heat Exchanger....................................................... 40
15.5 Flue Blower Vertical Installation for UHD[X][S]75
Only ......................................................................... 41
15.6 Pressure Switch....................................................... 42
15.7 Ignition Control ........................................................ 42
15.8 Limit Switches ......................................................... 42
SECTION 16: Specifications................................................ 43
16.1 Dimension Data ....................................................... 43
16.2 General Technical Data Table .................................. 44
16.3 Technical Data Table................................................ 44
SECTION 17: RAPID
®
UHD-Series Warranty....................... 45
© 2014
Rapid Engineering LLC
All rights reserved. No part of this work covered by the copyrights herein may be reproduced or copied in any form or by any means - graphic, electronic, or mechanical, including photocopying, recording, taping or information storage and retrieval systems - without the written permission of Rapid Engineering LLC.
Printed in U.S.A.
Page 6
Page 7
TABLE OF FIGURES
Figure 1: UHD[X][S] 75 Label Placement..................................2
Figure 2: UHD[X][S] 100-125 Label Placement......................... 3
Figure 3: Clearances to Combustibles ......................................6
Figure 4: Air Flow Direction .......................................................8
Figure 5: Suspension Methods ................................................. 9
Figure 6: Shelf-Mounting Methods.......................................... 10
Figure 7: Wall Shelf Mounting and Suspension ...................... 10
Figure 8: Vent and Roof Detail ................................................ 13
Figure 9: Standard Vented Heater - Vertical and Horizontal
Vent Termination ......................................................14
Figure 10: Standard Vented Heater - Common Vertical Vent
Termination ............................................................ 15
Figure 11: Separated Combustion Heater - Vertical and
Horizontal Vent Termination ...................................16
Figure 12: Concentric Vent Box ............................................... 16
Figure 13: Concentric Vertical and Horizontal Vent
Termination - Separated Combustion Heater.........17
Figure 14: Gas Connection .....................................................20
Figure 15: Automatic Burner Control Sequence...................... 26
Figure 16: Gas Valve for Models UHD[X][S] 75 – 125.............26
Figure 17: Manual Reset Limit Switch.....................................29
Figure 18: LED Diagnostic Codes ...........................................29
There are references in this manual to various trademarks. All trademarks mentioned herein, whether registered or not, are the
property of their respective owners. Rapid Engineering LLC is not sponsored by or affiliated with any of the trademark or registered trademark owners, and makes no representations about them, their owners, their products or services.
Page 8
Page 9
SECTION 1: HEATER SAFETY
Your Safety is Important to Us! This symbol is used throughout the manual to notify you of possible fire, electrical or burn hazards. Please pay special attention when reading and following the warnings in these sections.
Installation, service and, at a minimum, annual inspection of heater must be done by a contractor qualified in the installation and service of gas-fired heating equipment. Read this manual carefully before installation, operation or service of this equipment. Heaters are not approved for residential installations. These instructions, the layout drawing, local codes and ordinances and applicable standards that apply to gas piping, electrical wiring, venting, etc. must be thoroughly understood before proceeding with the installation.
SECTION 1: HEATER SAFETY
1.2 Safety Labels and Their Placement
Product safety signs or labels should be replaced by the product user when they are no longer legible. Please contact Rapid Engineering LLC or your
RAPID
®
independent distributor to obtain replacement signs or labels. See Page 2, Figure 1 through Page 3, Figure 2.
1.3 California Proposition 65
In accordance with California Proposition 65 requirements, a warning label must be placed in a highly visible location on the outside of the equipment (i.e. near equipment's serial plate). See label placement drawing on Page 2, Figure 1 through Page 3, Figure 2 for label location. Avoid placing label on areas with extreme heat, cold, corrosive chemicals or other elements. To order additional labels, please contact Rapid Engineering
LLC or your RAPID
®
independent distributor.
Protective gear is to be worn during installation, operation and service in accordance to the Occupational Safety and Health Administration (OSHA). Gear must be in accordance to NFPA 70E, latest revision when working with electrical components. Thin sheet metal parts have sharp edges. To prevent injury, the use of work gloves is recommended.
Before installation, check that the local distribution conditions, nature of gas and pressure and adjustment of the equipment are compatible.
This heater must be applied and operated under the
general concepts of reasonable use and installed using the best building practices.
This equipment is not intended for use by persons
(including children) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concerning use of the equipment by a person responsible for their safety. Children should be supervised to ensure that they do not play with the equipment. For additional copies of the Installation, Operation and Service Manual, please contact Rapid Engineering LLC.
1.1 Manpower Requirements
To prevent personal injury and damage to the
heater, two persons will be required for installation.
1 of 45
Page 10
UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL
Figure 1: UHD[X][S] 75 Label Placement
Description Part Number
Logo Label 91031102 Vent Length Label 91039505 Vent to Outdoors Label 91010427 Warning Label 91010429 Rating Plate Label 91039804 Installation Label 91010431 Instruction Location Label 91010433 Lighting Instruction Label 91010425 Venting Arrangement Label* 91010426 Manual Reset Switch Label 91010428 Proposition 65 Label 91070015
* For separated combustion units only
2 of 45
Page 11
Figure 2: UHD[X][S] 100-125 Label Placement
SECTION 1: HEATER SAFETY
Description Part Number
Logo Label 91031102 Vent Length Label 91039505 Vent to Outdoors Label 91010427 Warning Label 91010429 Rating Plate Label 91039804 Installation Label 91010431 Instruction Location Label 91010433 Lighting Instruction Label 91010425 Venting Arrangement Label* 91010426 Proposition 65 Label 91070015
* For separated combustion units only
3 of 45
Page 12
UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL
SECTION 2: INSTALLER RESPONSIBILITY
The installer is responsible for the following:
2.2 Corrosive Chemicals
• To install the heater, as well as the gas and electrical supplies, in accordance with applicable specifications and codes. Rapid Engineering LLC recommends the installer contact a Local Building Inspector or Fire Marshal for guidance.
• To use the information given in a layout drawing and in the manual together with the cited codes and regulations to perform the installation.
• To install the heater in accordance with the clearances to combustibles.
• To furnish all needed materials not supplied as standard equipment.
Do not use heater in area containing corrosive chemicals.
Refer to appropriate Material Safety Data Sheets (MSDS).
CAUTION
Product Damage Hazard
• To plan location of supports, vents and air intakes.
• To provide access for servicing.
• To provide the owner with a copy of this Installation, Operation and Service Manual.
• To never use heater as support for a ladder or other access equipment and never hang or suspend anything from heater.
• To ensure there is adequate air circulation around the heater and to supply air for combustion, ventilation and distribution in accordance with local codes.
• To provide a method that ensures that the air flow through the heat exchanger is within the acceptable range indicated on the serial plate prior to energizing the heater, and that such air flow continues at least 90 seconds after the heater is de-energized.
• To ensure the heater is placed in an approved application.
2.1 Wall Tag
A laminated wall tag is included with the heater as a
permanent reminder of the safety instructions and the importance of the required clearances to combustibles. Affix the tag by peeling off the backing of the adhesive strips on the rear surface and position the tag on a wall near the heater.
A copy of the wall tag (P/N 91039833) is illustrated
on the back cover. Know your model number and installed
configuration. Model number and installed configuration are found on the heater serial plate and throughout the Installation, Operation and Service Manual.
Failure to follow these instructions can result in product damage.
Rapid Engineering LLC cannot be responsible for ensuring that all appropriate safety measures are undertaken prior to installation; this is entirely the responsibility of the installer. It is essential that the contractor, the sub-contractor, or the owner identifies the presence of combustible materials, corrosive chemicals or halogenated hydrocarbons* anywhere in the premises.
* Halogenated Hydrocarbons are a family of chemical compounds characterized by the presence of halogen elements (fluorine, chlorine, bromine, etc.). These com­pounds are frequently used in refrigerants, cleaning agents, solvents, etc. If these compounds enter the air supply of the burner, the life span of the heater compo­nents will be greatly reduced. An outside air supply must be provided to the burners whenever the presence of these compounds is suspected. Warranty will be invalid if the heater is exposed to halogenated hydrocarbons.
2.3 National Standards and Applicable Codes
All equipment must be installed in accordance with the latest revision of the applicable standards and national codes. This refers also to the electric, gas and venting installation. Note: Additional standards for installations in public garages, aircraft hangars, etc. may be applicable. See Page 7, Section 5.
4 of 45
Page 13
SECTION 3: CRITICAL CONSIDERATIONS
3.1 Basic Information
UHD[X][S] heaters have automatic ignition burners for ON/OFF operation only.
3.2 Manufactured Units
Gas-fired, power-vented duct furnace with tubular heat exchanger. Units shall have a minimum of 82% thermal efficiency. The standard unit shall consist of a non-separated combustion design with an aluminized heat exchanger and single stage gas valve. Design and heat exchanger alternatives shall be offered as follows:
• Separated Combustion: [S] A separated combustion unit shall consist of a sealed enclosure with a hinged door. Combustion air inlet on rear of heater allows for intake venting from outside of heated space to be attached. Combustion flue gasses shall be ducted from outside the heated space by ductwork connected to unit’s outlet flange.
• Stainless Steel Heat Exchanger: [X] A stainless steel heat exchanger unit shall consist of heat exchanger tubes, heat exchanger tube supports and heat exchanger tube plates produced of 409 stainless steel. Air inlet temperatures below 40 °F (4.4 °C) are not recommended for this application.
SECTION 3: CRITICAL CONSIDERATIONS
• Must be installed in a manner which allows access to all serviceable components.
3.4 Minimum Required Installation Clearances
Clearances around the heater and vent must be as indicated on Page 6, Figure 3 and Page 11, Section 7 to ensure access for servicing and correct operation.
3.5 Ventilation
It is important to ensure that there is adequate air space around the heater to supply air for combustion, ventilation and distribution in accordance with local and national codes. See Page 11, Section 7.
3.6 Gas Supply
It is important that the gas supply pipe is sized correctly to provide the inlet pressure as stated on the heater serial plate. The gas supply pipe and electrical connections must not support any of the heater's weight. See Page 19, Section 9.
3.7 Electrical Supply
A permanent 120 V / 1 Ø/ 60 Hz electrical supply is required for the main electrical power. The heater also requires suitable controls listed on Page 21, Section 10.
3.3 Location and Suspension
All models:
• Must be installed indoors.
• Must be installed on the positive pressure side of the air circulation blower.
• Must be installed in a level position with horizontal discharge.
• May be mounted on a shelf of non-combustible material using shelf mounting brackets. See Page 10, Figure 6 and Page 10, Figure 7 for details.
• May be suspended from above (See Page 9, Section 6.2) or from wall brackets of sufficient strength to support the heater as listed in the
Technical Data Table on Page 44, Section 16.2.
• Drop rods must be a minimum of 3/8" diameter mild steel. Four suspension points (3/8" nuts) are located on top of the heater.
3.8 Vent
Choose heater orientation to allow for proper location of the vent. Each heater must be fitted with a correctly sized sealed vent system.
If vented horizontally, no other equipment may be connected to the vent. See Page 11, Section 7.
5 of 45
Page 14
UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL
SECTION 4: CLEARANCES TO COMBUSTIBLES
4.1 Required Clearances to Combustibles
WARNING
Fire Hazard
Keep all flammable objects, liquids and vapors the minimum required clearances to combustibles away from heater.
Some objects will catch fire or explode when placed close to heater.
Failure to follow these instructions can result in death, injury or property damage.
Clearances are the required distances that combustible objects must be away from the heater to prevent a fire hazard. Combustibles are materials that may catch on fire and include common items such as wood, paper, rubber, fabric, etc. Maintain clearances to combustibles at all times for safety. Clearances for all heater models are located on the serial plate, wall tag and throughout the manual. Check the clearances on the serial plate to make sure the product is suitable for your application and the clearances are maintained. Read and follow the safety guidelines below:
• Keep gasoline or other combustible material including flammable objects, liquids, dust or vapors away from this heater or any other equipment.
• Do not spray aerosols in the vicinity of this heater.
• The stated clearances to combustibles represents a surface temperature of 90° F (50° C) above room temperature. Building materials with a low heat tolerance (such as plastics, vinyl siding, canvas, tri-ply, etc.) may be subject to degradation at lower temperatures. It is the installer's and owner's responsibility to assure that adjacent materials are protected from degradation.
• Maintain clearances from heat sensitive equipment and work stations.
• Consult local Fire Marshal, Fire Insurance Carrier or other authorities for approval of proposed installation when there is a possibility
of exposure to combustible airborne materials or vapors.
4.2 Clearances to Combustibles
Clearances must be as indicated on Page 6, Figure
3. If clearances to combustibles are not indicated,
then installation clearances apply. All distances are minimum clearance requirements for service access, air flow and safety.
Figure 3: Clearances to Combustibles
Clearance to Vent: 2" (5 cm)
*23" (58.4 cm) minimum is necessary for servicing.
6 of 45
Page 15
SECTION 5: NATIONAL STANDARDS AND APPLICABLE CODES
SECTION 5: NATIONAL STANDARDS AND APPLICABLE CODES
5.1 Gas Codes
The type of gas appearing on the serial plate must be the type of gas used. Installation must comply with national and local codes and requirements of the local gas company.
United States: Refer to NFPA 54/ ANSI Z223.1 ­latest revision, National Fuel Gas Code.
Canada: Refer to CSA B149.1 Natural Gas and Propane Installation Code.
5.2 Aircraft Hangars
Installation in aircraft hangars must be in accordance with the following codes:
United States: Refer to Standard for Aircraft Hangars, NFPA 409 - latest revision.
Canada: Refer to Natural Gas and Propane Installation Code, Standard CSA B149.1 - latest revision.
5.3 Parking Structures and Repair Garages
5.5 Venting
The venting must be installed in accordance with the requirements within this manual and the following codes:
United States: Refer to NFPA 54/ANSI Z223.1 ­latest revision, National Fuel Gas Code.
Canada: Refer to CSA B149.1 Natural Gas and Propane Installation Code.
5.6 High Altitude
These heaters are approved (without modifications) for installations up to 2000' (610 m) in US and Canada. Heaters installed above 2000' (610 m) must be de-rated. For installations above 2000' (610 m) in US, consult factory for information on burner de-rating. For installations from 2000' (610 m) to 4500' (1370m) in Canada, high altitude conversion kits are available. Heaters installed over 4500' (1370 m) in Canada are not approved and must be approved by the local or provincial authority.
Installation in garages must be in accordance with the following codes:
United States: Standard for Parking Structures, NFPA 88A - latest revision or the Code for Motor Fuel Dispensing Facilities and Repair Garages, NFPA 30A - latest revision.
Canada: Refer to Natural Gas and Propane Installation Code, Standard CSA B149.1 - latest revision.
5.4 Electrical
The heater must be electrically grounded in
accordance with the following codes:
United States: Refer to National Electrical
®
, NFPA 70 - latest revision. Wiring must
Code conform to the most current National Electrical
®
Code
, local ordinances and any special
diagrams furnished.
Canada: Refer to Canadian Electrical Code, CSA C22.1 Part 1 - latest revision.
7 of 45
Page 16
UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL
SECTION 6: DUCT HEATER INSTALLATION
6.1 General
To connect the inlet and outlet ducts to the heater, Duct-Mate or similar flanges may be slid over the duct connector flanges supplied on the unit and secured with screws. The connection to the duct then can be made using the Duct-Mate clips. The ducts must have removable access panels upstream and downstream of the heater. These panels must be of appropriate size and placement so that smoke or reflected light could be observed to indicate the presence of leaks in the heat exchanger. Covers for these openings should be sealed to prevent leakage.
Any transition into the inlet of the heater should be smooth, with a taper of no more than 15 degrees. If elbows are required, they should be of either broad radius or fitted with properly designed turning vanes. Consult a professional to ensure turning vanes are properly designed.
The heater must be installed on the positive pressure side of the circulating air blower. Air flow through the heater must be as shown on Page 8, Figure 4 and may not be reversed. The air flow must be adjusted such that it is within the acceptable range shown on Page 8, Section 6.1.2. The
minimum inlet duct lengths shown on Page 8, Section 6.1.1 should be observed. Pressure drop through the heat exchanger at various air flows is given on Page 8, Section 6.1.2.
Figure 4: Air Flow Direction
OUTLET DUCT
AIR FLOW
INLET DUCT
6.1.1 Minimum Inlet Duct Length
Model Duct Length Duct Size (H x W)
UHD[X][S] 75 32" (81 cm) 16 3/4" x 15 7/8" (43 cm x 40 cm) UHD[X][S] 100 &125 37" (94 cm) 21 3/4" x 15 7/8" (55 cm x 40 cm)
6.1.2 Temperature Rise and Pressure Drop Ranges
UHD[X][S] 75 UHD[X][S] 100 UHD[X][S] 125
Airflow
(CFM)
850 68 0.06 950 78 0.05 1,020 92 0.06 1,200 48 0.10 1,500 50 0.18 1,650 57 0.14 1,625 36 0.16 2,500 31 0.28 2,340 41 0.27 1,965 30 0.22 3,000 26 0.39 3,480 28 0.56 2,450 24 0.31 3,300 24 0.46 4,240 23 0.80 2,650 22 0.36 3,660 22 0.55 4,750 20 0.98
Temperature
Rise (°F)
Pressure Drop
(in wc)
Airflow
(CFM)
Temperature
Rise (°F)
Pressure Drop
(in wc)
Airflow
(CFM)
Temperature
Rise (°F)
Pressure Drop
(in wc)
8 of 45
Page 17
6.2 Shelf Mounting and Suspension
WARNING
Crush Hazard
Use 3/8" threaded rod minimum.
Failure to follow these instructions can result in death, injury or property damage.
When handling or supporting the heater from below,
ensure that the weight is taken at the support points. For typical suspension, See Page 9, Figure 5. For typical shelf mounting on existing shelf, See Page 10, Figure 6.
The gas or electrical supply lines must not be used
to support the heater.
Do not locate the gas or electrical supply lines directly over the path of the flue products from the heater.
Figure 5: Suspension Methods
SECTION 6: DUCT HEATER INSTALLATION
The heater must be installed in a location that is readily accessible for servicing.
The heater must be installed in accordance with clearances to combustibles as indicated on the serial plate, wall tag and throughout the manual. See Page 6, Section 4.
6.3 Wall Mounting
For typical suspension, See Page 10, Figure 7. Wall mounted heaters blowing parallel to the wall can only be installed with the service door away from the wall.
The wall mounting brackets must be attached to a suitable wall using all mounting holes. Screw sizes less than 3/8" may not be used. In order for the wall mounting brackets to adequately carry the weight of the heater, it must be installed according to best building practices.
9 of 45
Page 18
UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL
Figure 6: Shelf-Mounting Methods
Existing cabinet screws must be re-used.
Description Part Number Qty. Shelf Mounting Bracket Kit 12011000K 1
Shelf Mounting Bracket 111115 1 0 2
Shelf Mounting
Brackets
Screw #10 x 1/2" Type AB Phil HWH Z
Figure 7: Wall Shelf Mounting and Suspension
94311008 2
Hardware provided to construct mounting bracket assembly only.
Description Part Number Qty. Wall Shelf Mounting Bracket Kit 12011002K 1
Wall Suspension Mounting Bracket Kit 12011001K 1 Shelf Mounting Bracket Kit 12011000K 1
Description Part Number Qty. Wall Suspension Mounting Bracket Kit 12011001K 1
Wall Mounting Bracket Arm Left 111WALL1L 1 Wall Mounting Bracket Arm Right 111WALL1R 1 Wall Mounting Bracket Vertical 111WALL2 2 Wall Mounting Bracket Diagonal 111WALL3 2 5/16" x 3 1/2" Bolt 97213925 6 5/16" Lock Nut with Nylon Insert 92114000 6 5/16" Flat Washer 95211600 6 5/16" Lockwasher 96411600 6
10 of 45
Page 19
SECTION 7: VENTING
WARNING
Carbon Monoxide Hazard
Heaters must be vented outdoors.
Heaters must be installed according to the installation manual.
Failure to follow these instructions can result in death or injury.
SECTION 7: VENTING
7.2.1 United States Requirements
Vent must terminate at least 3' (.9 m) above any forced air inlet located within 10' (3.1 m).
Vent must terminate at least 4' (1.2 m) below, 4' (1.2 m) horizontally from, or 1' (.3 m) above any door, operable window, or gravity air inlet into any building.
NFPA 54/ANSI Z223.1 - latest revision, National Fuel Gas Code specifies a 4' (1.2 m) horizontal vent terminal clearance from gas and electric meters, regulators and relief equipment.
7.1 Changing Vent and Air Intake Orientation
The heater is sold with rear horizontal vent and air
intake connections as standard. (only separated combustion models have air intake connection). If vertical vent and air intake connections are required, follow the instructions on Page 41, Section 15.5.
7.2 Venting
This heater must be vented in accordance with the
rules contained in this manual and with the following national codes and any state, provincial or local codes which may apply: United States: Refer to NFPA 54/ANSI Z223.1 - latest revision, National Fuel Gas Code; Canada: Refer to CSA B149.1 Natural Gas and Propane Installation Code.
Any portion of vent pipe passing through a
combustible wall must have a listed thimble to conform with the above codes.
The bottom of the vent or air intake terminal shall not
be located less than 1' (.3 m) above grade level.
The vent shall not terminate less than 7' (2.1 m)
above grade where located adjacent to public walkways.
Vent terminal must be installed at a height sufficient
to prevent blockage by snow and building materials protected from degradation by flue gasses.
Vent terminal must be beyond any combustible
overhang. Secure all joints with corrosion resistant #8 x 3/8"
sheet metal screws. For single wall venting, pressure sensitive aluminum
tape or silicone sealant must be used to seal all joints.
Aluminum tape shall have a minimum temperature
rating of 400° F (204° C) and meet SMACNA AFTS­100-73 standards. High temperature silicone sealant must have a minimum temperature rating of 480° F (250° C).
7.2.2 Canadian Requirements
The vent shall not terminate within 6' (1.8 m) of a mechanical air supply inlet to any building.
The vent shall not terminate within 3' (.9 m) of a window or door that can be opened in any building, any non-mechanical air supply inlet to any building, or of the combustion air inlet of any other piece of equipment.
7.3 Vent Installation
Maintain clearances to combustibles at all times for safety. Clearances are the required distances that combustible objects must be away from the heater to prevent serious fire hazard. See Page 6, Figure 3. For vented units, the vent must terminate outside of the building. Vents must be fully sealed and correctly sized for the model. If the vent passes through a wall or ceiling of combustible material, it must be enclosed by a listed thimble and be separated from the thimble by at least a 2" (5 cm) air gap.
For separated combustion models, vents and air intakes must be a fully sealed system and correctly sized for the model. Vent should be assembled as detailed on Page 13, Figure 8 through Page 17, Figure 13. The joints between the vent terminal and the roof or wall must be properly sealed.
Vents and air intakes must be adequately
supported so that the heater does not bear the weight of the pipes.
For vent termination See Page 13, Figure 8 through Page 17, Figure 13.
11 of 45
Page 20
UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL
7.3.1 Standard Vented Heaters (Models UHD[X] 75 - 125)
The vent must be fitted with a low resistance
terminal. See Page 13, Figure 8 through Page 15, Figure 10. Standard vented heaters do not allow outdoor air intake for combustion air.
7.3.2 Separated Combustion Heaters (Models UHD[X]S 75 - 125)
The heaters are designed to be installed as
separated combustion heaters. The vent and air intake are run as separate pipes to the wall or roof terminals. See Page 16, Figure 11. As an option, the vent and air intake are run as separate pipes to a concentric vent box and a concentric vent/air intake pipe penetrates the wall or roof. See Page 16, Figure 12 and Page 17, Figure 13.
For separated combustion installation, the vent and air intake must be fitted with an individual and correctly sized sealed system and the vent and air intake must terminate at approved wall and roof terminals.
Separated combustion units may not be common vented.
7.4 Horizontal Venting
Horizontally vented heaters must be individually vented, no common venting.
Vent pipe must be sloped ¼" (.6 cm) downward for
every 1' (.3 m). For vent lengths greater than 10' (3 m), condensation will form. Insulation is recommended and condensation drains may be desired. For vents pitched up towards the vent terminal, place the condensation drain within 10' (3.0 m) of the heater.
In noncombustible walls only, vent terminal (P/N 02537801-1P) may be used.
For 4'' (10 cm) vents in either combustible or noncombustible walls, use vent terminal (P/N
90502100) or equivalent insulated vent terminal. Follow the manufacturer's instructions for proper installation.
Instead of an insulated vent terminal, a listed thimble with 2" (5 cm) air gap may be used with a 4" (10 cm) vent cap (P/N 90502102).
7.5 Vertical Venting
Vertically vented standard-vented heaters can be
common vented (up to four heaters). For vent lengths greater than 10' (3.0 m), condensation will form. Insulation is recommended and condensation drains may be desired. Venting
through the top of the heater cabinet is not recommended if vent lengths are longer than 10' (3 m) UHD[X][S]75 only. In this case, vent from the rear of the heater cabinet then run the vent vertically and use a condensate drain at the bottom of the vertical vent.
For 4'' (10 cm) common vent, an approved vent cap (P/N 90502102) must be used.
For 6'' (15 cm) common vent, an approved vent cap (P/N 90502103) must be used.
For common vertical venting of more than two heaters, See Page 15, Figure 10.
A vent shall not extend less than 2' (.6 m) above the highest point where it passes through a flat roof of a building.
7.6 Length Requirements
If using vent lengths greater than 10' (3.0 m), condensation will form in the vent pipe. Insulation and additional sealing measures (high temperature silicone at all seams) are required. The entire vent should be insulated with foil faced fiberglass insulation (1/2" thick, 1-1/2# density minimum).
7.6.1 Maximum Vent Lengths Table
Model UHD[X][S] 75 - 125 # of Elbows
30 ft (9.1 m) 1
25 ft (7.6 m) 2 20 ft (6.1 m) 3 15 ft (4.5 m) 4 10 ft (3.0 m) 5
7.7 Vent Material
Vent material may be single wall 26 ga. (minimum) galvanized steel or equal thickness stainless steel. Completely seal all joints, refer to Page 11, Section
7.3. If penetrating a combustible wall or roof, a listed thimble with 2" (5 cm) clearance must be used. Where local codes permit, a single section of type B-1 vent material may be used at the roof or wall penetration instead of a thimble. Ensure vent manufacturer's clearance from vent material is maintained. Seal annular space of the type B-1 vent as well as all joints in the remaining vent.
7.8 Replacing an Existing Heater in a Venting System
When replacing an existing heater in a venting system, the venting system may not be properly sized to vent the new heater. The following steps must be followed with each piece of equipment connected to the venting system placed in
12 of 45
Page 21
SECTION 7: VENTING
operation, while any other equipment connected to the venting system are not in operation.
1. Seal any unused openings in the venting system.
2. Inspect the venting system for proper size and horizontal pitch, as required by the NFPA 54/ ANSI Z223.1 - latest revision, National Fuel Gas Code (US) or Standard CSA B149.1 Natural Gas and Propane Installation Code (Canada) and these instructions. Determine that there is no blockage or restriction, leakage, corrosion and other deficiencies which could cause an unsafe condition.
3. Close all building doors and windows and all doors between the space in which the piece(s) of equipment connected to the venting system are located and other spaces of the building. Turn on clothes dryers and any exhaust fans, such as range hoods and bathroom exhausts so that they shall operate at maximum speed. Do not operate a summer exhaust fan. Close fireplace dampers.
4. Follow the lighting instructions. Place the equipment being inspected in operation. Adjust thermostat so that the equipment will operate continuously.
5. For any equipment having a draft hood, test for draft hood equipment spillage at the draft hood relief opening after five minutes of main burner operation. Use the flame of a match or candle.
6. After it has been determined that each piece(s) of equipment connected to the venting system properly vents when tested as outlined above, return doors, windows, exhaust fans, fireplace dampers and any other gas-burning piece(s) of equipment to their previous conditions of use.
7. If improper venting is observed during any of the above tests, the venting system must be corrected by a contractor qualified in the installation and service of gas-fired equipment or your local gas supplier. If the venting must be resized, use appropriate tables in (US) Appendix G of NFPA 54/ANSI Z223.1 - latest revision, National Fuel Gas Code (US) or Standard CSA B149.1 Natural Gas and Propane Installation Code (Canada) to determine minimum size. All vent corrections must be in accordance with the appropriate local codes and the NFPA 54/ANSI Z223.1 ­latest revision, National Fuel Gas Code (US) or
Standard CSA B149.1 Natural Gas and Propane Installation Code (Canada).
Figure 8: Vent and Roof Detail
13 of 45
Page 22
UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL
Figure 9: Standard Vented Heater - Vertical and Horizontal Vent Termination
Model Vent Diameter Part Number
UHD[X] 75 - 125 4" (10 cm) 90502102
14 of 45
Page 23
Figure 10: Standard Vented Heater - Common Vertical Vent Termination
Type "B" vent cap (7" [18 cm] or 8" [20 cm]) may be
SIDE VIEW
2'(.6 m)
Minimum
used. (These are not available from the manufacurer.)
Type "B" Vent Pipe
Roof
Flashing
Roof
SECTION 7: VENTING
The last section of vent pipe passing through the roof or wall may be Type "B" vent pipe. All other vent materials in the building must be single wall vent pipe.
4" (10 cm)
Single Wall Pipe
TOP VIEW
"D"
Approved
Thimble
(If Applicable)
Single Wall Pipe
"D" Area must equal sum
of open area of
individual vents.
4" (10 cm)
Single Wall Pipe
Requirements:
• Maximum of four heaters can be commonly vented through the roof.
• Heaters must be of the same BTU output.
• Heaters must be controlled by a common thermostat.
• Connections to a common stack must be positioned to avoid direct opposition between streams of
combustion gases.
15 of 45
Page 24
UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL
Figure 11: Separated Combustion Heater - Vertical and Horizontal Vent Termination
Model
UHD[X]S 75 - 125 4" (10 cm) 90502102
Air Intake &
Vent Diameter
Part Number
Figure 12: Concentric Vent Box
Seal joint between single wall and Type B vent with silicone sealant.
Combustion Air to Heater
Exhaust from Heater
4" (10 cm) Single Wall Vent Pipe (By Others)
One piece of 4" (10 cm) diameter, 1/4" (6 cm) airspace type
“B” vent. Selkirk Model RV or equivalent. (By others)
6" (15 cm) Single Wall Inlet Air Pipe (By Others)
Use 3 sheetmetal screws equally spaced around joint.
Concentric Vent Box
Use 3 sheetmetal screws equally spaced around collar.
Toward Outside
16 of 45
Page 25
SECTION 7: VENTING
Figure 13: Concentric Vertical and Horizontal Vent Termination - Separated Combustion Heater
Description Part Number Qty. Concentric Vent Kit UHVK1
Concentric Vent Box Top & Side Assembly 90504113 1 Concentric Vent Box Bottom Assembly 90504112 1 Screw #6 x 3/8 Self Drilling 91119100 14 4" (10 cm) Vent Terminal with Baffle Plate 90502102R 1 6" (15 cm) Combustion Air Terminal 90502103 1
17 of 45
Page 26
UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL
SECTION 8: AIR SUPPLY
WARNING
Explosion Hazard
Equipment must have access to uncontaminated air at all times.
Failure to follow these instructions can result in death, injury or property damage.
8.1 Separated Combustion Installation
When installed as a separated combustion heater
(UHD[X]S), the air for combustion is drawn in from outside the building.
8.2 Building Ventilation
Where ventilation is required, air must be taken from
an outside point where it is not likely to be contaminated or obstructed.
8.3 Outside Combustion Air Supply
If outside combustion air supply is required, separated combustion model (UHD[X]S) heaters must be used.
Caution: If the building has a slight negative pressure or corrosive contaminants such as halogenated hydrocarbons are present in the air, an outside combustion air supply to the heater is required. Seal all combustion air pipe joints.
The outside air terminal must not be more than 1'
(31 cm) above the vent terminal.
8.3.1 Length Requirements
Follow the constraints listed on Page 12, Section 7.6.
18 of 45
Page 27
SECTION 9: GAS PIPING
SECTION 9: GAS PIPING
Fire Hazard
Connect gas supply according to Figure 14.
Do not use gas supply pipe and electrical connections to support the heater’s weight.
Gas can leak if not installed properly.
Failure to follow these instructions can result in death, injury or property damage.
WARNING
Explosion Hazard
Leak test all components of gas piping before operation.
Gas can leak if piping is not installed properly.
Do not high pressure test gas piping with heater connected.
Failure to follow these instructions can result in death, injury or property damage.
A gas meter is connected to the service pipe by the
gas supply company. An existing meter should be checked, preferably by the company, to ensure that the meter is adequate for the rate of gas supply required.
Installation pipes must be fitted in accordance with local and national codes. Pipes of smaller size than the heater inlet gas connection should not be used.
Gas lines must meet applicable codes: United States: Flexible stainless steel gas hose
(US models) is certified per the standard for connectors for gas applications. ANSI Z21.21/CSA
6.10 – latest revision. Canada: Rubber type 1 gas hose (Canadian
models) is certified as being in compliance with the
standard for elastomeric compostite hose and hose couplings for conducting propane and natural gas, CAN/CGA 8.1 – latest revision.
9.1 Connections
Connect the heater to the gas supply ensuring that the final connections are as follows:
• Gas supply pipe work is run in medium or heavy gauge tubing in compliance with local and national codes.
• Meter and service must be large enough to handle all the burners being installed plus any other connected load. The gas pipe which feeds the system must be large enough to supply the required gas with a maximum pressure drop of 1/2 in wc. When gas piping is not included in the layout drawing, contact the local gas supplier.
• An isolating valve and union connection should be used and fitted into the supply adjacent to the heater.
• A minimum 1/8'' NPT plugged tapping accessible for test connection must be installed immediately upstream of the gas supply connection to the heater.
• For suspended heaters, an approved metal flexible connection between the isolating valve and the heater may be used. To reduce
pressure loss, use one pipe size larger than the heater gas connection.
IMPORTANT - The complete installation must be
purged and tested for gas soundness in accordance with local and national codes.
Caution: Do not high pressure (in excess of 1/2 psi [14 in wc]) test the gas piping with the burner connected. Close manual shut-off valve during any pressure testing equal to or less than 1/2 psi (14 in wc).
Check the pipe and tubing ends for leaks before placing heating equipment into service. When checking for gas leaks, use a soap and water solution; never use an open flame.
19 of 45
Page 28
UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL
Figure 14: Gas Connection
20 of 45
Page 29
SECTION 10: WIRING
DANGER
Electrical Shock Hazard
Disconnect electric before service.
More than one disconnect switch may be required to disconnect electric from equipment.
Equipment must be properly grounded.
Failure to follow these instructions can result in death or electrical shock.
SECTION 10: WIRING
All heater models require constant 120 V/1Ø/ 60 Hz
power supply. Check heater serial plate for electrical rating for proper circuit sizing. For servicing, a disconnect switch of proper electrical rating should be installed in the vicinity of the heater.
All heaters are equipped with thermostat
connections suitable to power a 24 V thermostat. Heater must be wired and electrically grounded in
accordance with local codes. In the absence of local codes in accordance with: United States: refer to National Electrical Code
®
NFPA 70 - latest revision; Canada: refer to Canadian Electrical Code CSA C22.1 Part I - latest revision.
10.2 Low Voltage Thermostat with One Heater
10.1 Positioning Thermostats
A room thermostat should be mounted on a vibration-free wall or column at a height of approximately 5' (1.5 m) from the floor to measure the ambient temperature. It should be clear of both cold drafts and the direct path of warm air from the heater. Avoid mounting thermostat on outside walls or in areas directly exposed to radiant heat or sunlight. Install wall tag in a visible location near thermostat. See Page 4, Section 2.1 for wall tag details.
21 of 45
Page 30
UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL
10.3 UHD[X][S] Series Internal Wiring Diagram
IMPORTANT:
For field wiring into service junction box, or if any of the original wire supplied with the heater must be replaced, it must be replaced with wiring material having a temperature rating of at least 221° F (105° C) and 600 V. For supply connections, use No. 14 AWG or larger wires.
22 of 45
Page 31
10.4 UHD[X][S] Series Ladder Wiring Diagram
SECTION 10: WIRING
IMPORTANT:
For field wiring into service junction box, or if any of the original wire supplied with the heater must be replaced, it must be replaced with wiring material having a temperature rating of at least 221° F (105° C) and 600 V. For supply connections, use No. 14 AWG or larger wires.
23 of 45
Page 32
UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL
10.5 Electrical Connection to the Heater
IMPORTANT: Junction box is not provided with heater.
Conduit can also be attached directly to heater with wire junction made within the heater cabinet.
24 of 45
Page 33
SECTION 11: OPERATION AND MAINTENANCE
SECTION 11: OPERATION AND MAINTENANCE
DANGER
Electrical Shock Hazard
Disconnect electric before service.
Heater must be connected to a properly grounded electrical source.
Failure to follow these instructions can result in death, electric shock, injury or property damage.
Read this manual carefully before installation, operation, or service of this equipment. All components are accessed via the hinged door. Opening the door exposes live electrical connections and hot components.
Prior to any maintenance or service of the heater, shut off, lockout and tagout the electrical disconnect and gas valve that supplies the unit in accordance with OSHA regulations.
11.1 Pre-Start-Up Checks
All pre-start-up checks must be carried out before
lighting the heater. Ensure that the heater and all controls are suitable
for the gas, pressure and electrical supply to which they are to be connected.
Explosion Hazard
Turn off gas supply to heater before service.
WARNING
Burn Hazard
Allow heater to cool before service.
Tubing may still be hot after operation.
11.2 Begin Start-Up
11.2.1 Before Operating the Heater
To ensure that all the controls are in safe working order, operate the heater for the first time with the isolating gas valve turned off and power supply turned on.
1. Turn off the isolating gas valve.
2. Turn up the thermostat above room temperature. The automatic ignition sequence will now begin as described on Page 26, Figure 15.
There will be no ignition of the burner and lockout will occur, which proves the controls are operating correctly.
Cut/Pinch Hazard
Wear protective gear during installation, operation and service.
Edges are sharp.
11.1.1 Electrical Checks
1. Check that all site wiring is connected in accordance with the appropriate wiring diagram on Page 22, Section 10.3.
11.1.2 Gas Supply
All aspects of the gas installation including the gas
meter must be inspected, tested for gas tightness and purged in accordance with local and national codes.
Ensure that the air is fully purged from the heater inlet pipe up to the main gas valve inlet test nipple.
11.1.3 Mechanical Checks
1. Check that the flue (and air intake for separated combustion units) is installed in accordance with the instructions in this manual and local regulations. See Page 11, Section 7.
25 of 45
Page 34
UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL
Figure 15: Automatic Burner Control Sequence
Burner Sequence for Ignition Control
Thermostat 24 V
RUNSTART
SHUT DOWN
Flue Blower
Pressure
Switch
Ignition Spark
Start Gas Valve
Flame Signal
NO
P
C
NC
*Purge time begins at pressure switch change over.
30 Seconds Purge*
ts = 10 Seconds
Required Incoming Signals
If at any stage the flame fails, the control will retry
Signals Output By Control
for ignition. The control has four trials for ignition before a one hour lockout.
Figure 16: Gas Valve for Models UHD[X][S] 75 – 125
30 Seconds Post
TOP VIEW
Regulator
Gas Inlet
END VIEW
Inlet Pressure
½PSI IN
C
ON
OFF
Description Part Number
Gas Valve 75 – 125 NG 90032505 Gas Valve 75 – 125 LP 90032506
Outlet Pressure
26 of 45
Page 35
SECTION 11: OPERATION AND MAINTENANCE
11.2.2 Start-Up the Gas Valve (All Gases)
11.2.2.1 Check Burner Gas Pressure
1. Remove the plug in the outlet (burner) pressure test point and connect a pressure tap and a manometer.
2. With the burner firing, measure the pressure on the manometer. To adjust the burner pressure, remove the regulator cover from the valve and turn the regulator adjustment screw to set the required burner pressure as stated in the Technical Data Table for the correct gas and model on Page 44, Section 16.3.
NOTE: If the correct burner pressure cannot be reached, then check the inlet pressure to the valve with the burner firing. See Technical Data Table on Page 44, Section 16.3 for inlet pressure requirement.
Do not continue to adjust the regulator if the pressure is not changing.
11.6 Complete Start-Up
Ensure that all covers are fitted correctly and all test points are properly sealed.
11.7 Instruction to the User
Explain the controls of the heater to the user including how to turn it on and off, using the controls equipped on site.
Give this manual to the user. Ensure that the user is shown and understands the
importance of maintaining clearances to combustibles on Page 6, Figure 3, installer responsibility on Page 4, Section 2, user instructions on Page 28, Section 12 and all warnings defined in this manual.
If the inlet pressure is too low to allow correct burner pressure setting, then the gas inlet pressure must be corrected before completing the start-up.
11.2.2.2 Check Gas Rate
1. After burner pressure adjustment, allow the heater to operate for at least 15 minutes and then re-check settings. Adjust pressure setting if necessary.
2. Check gas flow rate at gas meter.
3. Turn off heater and electrical supply.
4. Remove the manometer and refit all covers to the valve and tighten the screw of the outlet pressure tap.
11.3 Pressure Switch
The pressure switch is factory pre-set for each
model and is not adjustable.
11.4 Turning Off the Heater
Set the thermostat to the "OFF" position or lowest setting and the main burner will stop.
11.5 External Controls
External controls may include time switch, interlock switch, room thermostat and frost thermostat. Operate each control to ensure that they function correctly. Set the switches (if equipped) and thermostat(s) to the users’ requirements.
27 of 45
Page 36
UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL
SECTION 12: USER INSTRUCTIONS
DANGER
Electrical Shock Hazard
Disconnect electric before service.
Heater must be connected to a properly grounded electrical source.
Failure to follow these instructions can result in death, electric shock, injury or property damage.
The UHD[X][S] Series heaters are fully automatic
and operate from the external controls fitted on site.
The only user control at the heater is the Manual
Reset Limit Switch - See Page 28, Section 12.2. See Page 40, Section 15.3 for manual reset limit switch location inside control housing.
Explosion Hazard
Turn off gas supply to heater before service.
WARNING
Burn Hazard
Allow heater to cool before service.
Tubing may still be hot after operation.
12.2 Common User Controls
12.2.1 Manual Reset Limit Switch
Cut/Pinch Hazard
Wear protective gear during installation, operation and service.
Edges are sharp.
WARNING
12.1 Heater Operation
When the heater has been switched on by the
thermostat installed on site, the main burner will automatically turn on.
The burner control module will control the safe
ignition of the flame.
All heaters require a constant gas and electricity
supply which must not be interrupted during the normal operation of this heater.
Explosion Hazard
Do not make more than one attempt to restart the heater if manual reset limit switch locks out.
The vent or heat exchanger may be blocked.
The fault must be traced and repaired.
Failure to follow these instructions can result in death, injury or property damage.
The limit thermostat is located inside the hinged access door of the heater. See Page 40, Section
15.3. This control protects against excessive heat build-up inside the burner compartment.
28 of 45
Page 37
SECTION 12: USER INSTRUCTIONS
Figure 17: Manual Reset Limit Switch
Reset Button
To reset manual reset limit switch, press reset button. NOTE: To reset, the switch must be cool.
Description Part Number
Manual Reset Limit Switch 90412106
12.3 Lighting Instructions
12.3.1 To Turn On Heater
1. Ensure that the electrical and gas supplies to the heater are on. Check that the on site controls are "ON".
IMPORTANT: The thermostat setting must be above the ambient temperature for the heater to operate.
12.4.1 Simple Troubleshooting (Burner Faults)
If the burner fails to ignite for any reason, it will retry for ignition (four trials total). After four unsuccessful ignition trials, the control will put the heater into lockout for one hour.
Lockout should not occur during normal operation of the heater and indicates there is a fault condition which must be corrected. There is an LED light on the ignition control that flashes codes to assist in fault correction. See Page 29, Figure 18 for LED indication codes.
Figure 18: LED Diagnostic Codes
LED INDICATION FAULT MODE
Slow Flash Normal Operation - No call for heat.
Fast Flash Normal Operation - Call for heat.
2 Flashes Ignition Lockout - No flame detected.
3 Flashes Airflow Fault - Pressure switch open or closed.
4 Flashes Temperature Limit or
Manual Reset Limit Switch Open
5 Flashes Flame Sense Error - Gas valve not energized.
Steady On Internal Control Failure
2. The automatic firing sequence will begin as described on Page 26, Figure 15. The heater will now operate automatically under the control of the on site controls.
12.3.2 To Turn Heater Off
Set the thermostat to the "OFF" position or lowest setting. The burner will turn off immediately.
To restart, turn the thermostat on or above room
temperature.
12.4 Simple Troubleshooting
Some possible reasons for the heater not operating are:
1. Gas supply not "ON".
2. Electricity supply not "ON".
3. The time and/or temperature controls are not "ON".
4. A limit switch may have operated. This may be caused by an interruption of the electrical supply, failure of the distribution fan or vent or heat exchanger blockage.
If a temperature limit switch persistently trips, there is a fault which must be investigated by a contractor qualified in the installation and service of gas-fired heating equipment.
29 of 45
Page 38
UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL
SECTION 13: SERVICING
DANGER
Electrical Shock Hazard
Disconnect electric before service.
Heater must be connected to a properly grounded electrical source.
Failure to follow these instructions can result in death, electric shock, injury or property damage.
13.1 Servicing Instructions
After start-up, the heater will require maintenance to
be carried out, at a minimum, annually. If the heater is used in a dirty or dusty area, more frequent maintenance may be required.
IMPORTANT: Prior to any maintenance or service of the heater, shut off, lockout and tagout the electrical disconnect and gas valve that supplies the unit in accordance with OSHA regulations. After any maintenance or repair work, always test fire the heater in accordance with the start-up instructions
on Page 25, Section 11 through Page 27, Section
11.7 to ensure all safety systems are in working order
before leaving the heater to operate. Minor faults may be traced by using the troubleshooting charts
on Page 33, Section 14 through Page 37, Section
14.5.
IMPORTANT: Check all gas pipes and pipe joints to ensure there are no cracks or gas leaks. Any cracks in the pipes or pipe joints must be repaired.
IMPORTANT: Inspect all suspended components and hardware. Ensure that they are in good condition, properly tightened, and corrosion free.
13.2 Burner Maintenance
1. Open the hinged door via tooled access and remove from the hinges. Set door aside. See
Page 39, Section 15.2
2. Remove burner side panel. Electrode and flame probe should remain attached. See Page 40, Section 15.3.
3. Remove burner assembly from cabinet via four screws, two on top and two on bottom. Clean
Explosion Hazard
Turn off gas supply to heater before service.
WARNING
Burn Hazard
Allow heater to cool before service.
Tubing may still be hot after operation.
any deposits from the main burner which may have formed in the injectors or venturi of the burner.
4. Check condition of ignition electrode and flame probe. Clean off any deposits which may have formed, check condition of ceramic insulators. Replace as necessary. See Page 40, Section
15.3.
13.3 Heat Exchanger Maintenance
The heat exchanger will remain clean unless a problem has developed with combustion. Inspect the heat exchanger. Look for signs of overheating at the front of the tubes which may indicate burner over firing or persistently low air flows.
13.4 Gas Valve Maintenance
No regular maintenance is required on this device. To change gas control valves, See Page 38, Section
15.1.
Do not repair or disassemble gas valve.
Replace faulty gas valves with replacement parts sold and supplied by Rapid Engineering LLC.
13.5 Flue Blower
The flue blower should not require maintenance. However, if the air pressure switch is causing burner lockout, then remove the flue blower from the vent box by unscrewing the screws at the mounting plate. Screw quantity will vary by model size. Remove the screws attaching the mounting plate to the fan inlet See Page 41, Section 15.5. Ensure that the fan is free to run and that the fan wheel is clean.
Cut/Pinch Hazard
Wear protective gear during installation, operation and service.
Edges are sharp.
30 of 45
Page 39
SECTION 13: SERVICING
13.6 Venting and Air Intake Pipe
Inspect all venting and air intake pipe. Ensure that all seams are sealed and suspension points secure. Repair suspension points if any part of the venting or combustion air pipe is sagging. Check to make sure any insulation is not missing or in poor condition. Replace as necessary. Check all venting and air intake components to ensure they are in good condition, gas tight and corrosion-free.
supplied by Rapid Engineering LLC and conform to all requirements set forth in the RAPID
®
manuals and all applicable governmental authorities pertaining to the installation, service, operation and labeling of the equipment.
To help facilitate optimum performance and safety, Rapid Engineering LLC recommends that a qualified contractor conduct, at a minimum, annual
inspections of your RAPID
®
equipment and perform
service where necessary, using only replacement
13.7 Maintenance Checklist
parts sold and supplied by Rapid Engineering LLC.
Installation Code and Annual Inspections:
All installation and service of RAPID
®
equipment must be performed by a contractor qualified in the installation and service of equipment sold and
Annual Fall Start-up Follow entire start-up procedure at this time and check control settings and
operation.
The Vicinity of the Heater Do not store or use flammable objects, liquids or vapors near the heater.
Immediately remove these items if they are present.
See Page 5, Section 3.
Vehicles and Other
Objects
Maintain the clearances to combustibles.
Do not hang anything from, or place anything on, the heater.
Make sure nothing is lodged in between the heat exchanger tubes.
Immediately remove objects in violation of the clearances to combustibles.
See Page 6, Section 4.
Vent Pipe/Terminals Venting must be intact. Using a flashlight, look for obstructions, cracks on the
pipe, gaps in the sealed areas or corrosion.
The area must be free of dirt and dust.
Remove any carbon deposits or scale using a wire brush.
If the vent terminal has a screen built in, remove any dirt, dust or deposits from the screen.
See Page 11, Section 7 through Page 18, Section 8.
Cabinet Exterior After installation, touch up scratches. Periodic painting should be done there-
after as required. Warning labels and logo labels should be legible and accu-
®
rate. Please contact Rapid Engineering LLC or RAPID
independent distributor if you need replacement warning labels or logo labels. See Page 2, Figure 1 through Page 3, Figure 2
Combustion Air Intake Pipe
Intake pipe and inlet must be intact. Look for obstructions, cracks on the pipe, gaps in the sealed areas or corrosion.
The area must be free of dirt and dust.
Clean and reinstall as required.
See Page 18, Section 8.
31 of 45
Page 40
UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL
Heat Exchanger Make sure there are no cracks.
Make sure there is no sagging, bending or distortion.
Clean or replace as required.
Gas Line and Shut-off
Valves
Burner Observation
Window
Flue Blower Scroll, Wheel
Check for gas leaks.
See Page 19, Section 9.
Make sure it is clean and free of cracks or holes.
Clean and replace as required.
Compressed air or a vacuum cleaner may be used to clean dust and dirt.
and Motor Inshot Burners and
Orifices
Clear obstructions (even spider webs will cause problems).
Carefully remove any dust and debris from the burner.
Direct-Spark Igniter Replace if there are cracked ceramics, excessive carbon residue, or erosion
of the electrode.
The electrode gap should be 1/8" (3.2 mm).
Thermostat There should be no exposed wire or damage to the device or wiring.
See Page 21, Section 10.
Suspension Points Make sure the heater is hanging securely.
Look for signs of wear on the suspension materials or ceiling.
See Page 9, Figure 5.
Silicone Tubing Ensure tight, secure fit on all pressure fittings at pressure switch and vent box.
Gas Valve Verify that cap covering pressure regulator adjustment screw is secure and
has not been tampered with.
Verify all wiring connections.
Condensate Drain
Flush drain and clear any obstructions.
(when installed) Ductwork Consult an indoor air quality professional for proper cleaning procedures.
Air Circulation Blower For a complete inspection, see the manufacturer’s installation, operation and
service manual.
Wall Tag If wall tag is present, make sure it is legible and accurate. Please contact
®
Rapid Engineering LLC or your RAPID
independent distributor if you need a
wall tag. See Page 4, Section 2.1.
32 of 45
Page 41
SECTION 14: TROUBLESHOOTING
SECTION 14: TROUBLESHOOTING
DANGER
Electrical Shock Hazard
Disconnect electric before service.
Heater must be connected to a properly grounded electrical source.
Failure to follow these instructions can result in death, electric shock, injury or property damage.
Explosion Hazard
Turn off gas supply to heater before service.
WARNING
Burn Hazard
Allow heater to cool before service.
Tubing may still be hot after operation.
Cut/Pinch Hazard
Wear protective gear during installation, operation and service.
Edges are sharp.
33 of 45
Page 42
UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL
14.1 General
34 of 45
Page 43
14.2 Troubleshooting For Automatic Ignition Burner Systems
SECTION 14: TROUBLESHOOTING
If problems persist, contact
Bananza at
www.bananza.com
For optimum heater performance, use only replacement parts sold and supplied by Rapid Engineering LLC. Conduct start-up procedure as shown on Page 25, Section 11.
35 of 45
Page 44
UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL
14.3 Troubleshooting for Flame Supervision System
To measure flame current, connect a 0 - 50 µA DC meter in series with the flame probe. If the meter reads negative values, then reverse the test leads.
START
Connect a DC ammeter in
series with the flame probe.
Is the flame present and
at least 1 µA DC flame
current?
Ye s
Is there a current flowing in the flame probe circuit with
no flame present?
No
Does “lockout” occur when
there is a flame present?
No
Heater Operating
TROUBLESHOOT ENDS.
Use General
Troubleshooting section to
No
Ye s
Ye s
No
trace the fault.
Is the connecting lead damaged? Is the flame probe damaged or touching earthed
components?
Is inlet burner gas pressure
correct? Is live and neutral
polarity correct? Is
flame probe circuit correct?
No
Repair or replace as
required.
If problems persist, contact
Rapid Engineering LLC at
www.rapidengineering.com
Repair or replace as
Ye s
Ye s
required.
Replace ignition control.
NOTE: Minimum flame probe current 1 µA DC. Typical flame probe current 3-5 µA DC.
36 of 45
Page 45
14.4 Troubleshooting for Gas Valves
SECTION 14: TROUBLESHOOTING
START
Is gas pressure at inlet of the
valve correct for gas type?
Note pressure found.
Does gas pressure at outlet
of the valve rise when
valve turns on?
Does gas pressure at
outlet of valve return to zero or
lower when valve turns off?
Valve Operating
TROUBLESHOOT ENDS.
14.5 Troubleshooting for Flue Blower
Ye s
Ye s
Ye s
Ye s
No
No
No
No
Fault elsewhere.
Correct pressure problem.
Valve or ignition control
faulty. Replace with one of correct type.
Valve faulty.
Replace with one of
correct type.
If problems persist, contact
Rapid Engineering LLC at
www.rapidengineering.com
START
Does flue blower run
automatically when there
is a call for heat?
Ye s
Does blower turn on and
off while burner is firing
continously?
No
Blower Operating
TROUBLESHOOT ENDS.
No
Ye s
No
Correct power
supply problem.
Ye s
Blower motor faulty.
Replace with correct type.
Check blower motor leads
for loose connections.
If problems persist, contact
Rapid Engineering LLC at
www.rapidengineering.com
For optimum heater performance, use only replacement parts sold and supplied by Rapid Engineering LLC.
Conduct start-up procedure as shown on Page 25, Section 11.
37 of 45
Page 46
UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL
SECTION 15: REPLACEMENT PARTS
DANGER
Electrical Shock Hazard
Use only genuine RAPID® replacement parts per this installation, operation and service manual.
Failure to follow these instructions can result in death, electric shock, injury or property damage.
See warnings and notes on Page 30, Section 13 before removing or replacing parts
Burner Components
All serviceable burner parts are accessed by the
hinged door on the side of the heater.
15.1 Gas Valve
Remove the gas supply pipe at the heater inlet.
Follow instructions on See Page 39, Section 15.2 to remove gas valve/manifold.
Explosion Hazard
WARNING
Fire Hazard
Replace in reverse order. Verify that the gas flow direction of the valve is correct. Use a minimum amount of gas seal on the thread joint. Check that all the joints are leak free. Reset gas valve. See Page 27, Section 11.2.2.
IT IS IMPORTANT THAT ONLY THE CORRECT GAS VALVE IS USED WHEN REPLACING THESE CONTROLS.
Carbon Monoxide Hazard
.
Description Part Number
Gas Valve, NG (Models UHD[X][S] 75 - 125) 90032505 Gas Valve, LP (Models UHD[X][S] 75 - 125) 90032506
38 of 45
Page 47
15.2 Burner Injectors
SECTION 15: REPLACEMENT PARTS
Remove four screws to remove manifold.
Ensure gas tight fitting of orifices Ensure correct alignment with
burners. Ensure all pipe joints are gas tight.
MODEL UHD[X][S] 75 UHD[X][S] 100 UHD[X][S] 125
Orifice Quantity 5 6 7
Natural Gas
Orifice Marking 49 46 46
P/N 91930049 91930046 91930046
Propane
Orifice Marking 1.15 mm 1.25 mm 1.25 mm
P/N 91930115 91930125 91930125
39 of 45
Page 48
UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL
15.3 Ignition Electrode and Flame Probe
To replace the electrode or flame probe, remove the electrical lead and screw.
Pull out from mounting. Refit in reverse ensuring that the gap to burner is as shown in the front view of the burner compartment.
Description Part Number Qty
Spark Electrode 90427411 1 Automatic Ignition Flame Probe 90439300 1 Transformer 90436900K 1 Ignition Module 90434008 1 Inshot Burners UHD[X][S] 75 92000002 5 Inshot Burners UHD[X][S] 100 92000002 6 Inshot Burners UHD[X][S] 125 92000002 7 Limit Switch 90412104 1 Manual Reset Limit Switch (75 only) 90412106 1
15.4 Heat Exchanger
The heat exchanger consists of a six-pass design with 1.5" outer diameter [aluminized steel] [409 stainless
steel] tube. The tube plates are made of [aluminized steel] [409 stainless steel]. The tube supports are made of [aluminized steel] [409 stainless steel].
40 of 45
Page 49
15.5 Flue Blower Vertical Installation for UHD[X][S]75 Only
SECTION 15: REPLACEMENT PARTS
To remove the blower, remove screws securing the fan and mounting plate to the vent box.
To remove the blower from the mounting plate, remove screws.
Refit in reverse order.
To change the vent and air intake orientation from back to top, remove the blower and mounting plate as above.
Remove intake and exhaust covers from top of the heater.
Rotate the blower, mounting plate and gasket clockwise until the flue adapter lines up with the top hole. Secure screws.
If applicable, remove the air intake adapter from the back of the heater and install in the appropriate hole on top.
Install intake and exhaust covers over the back holes.
Ensure sealed joints. Ensure mounting plate orifice is clear and not obstructed.
MODEL UHD[X][S] 75 UHD[X][S] 100-125
Flue Blower P/N 90710404 90710403
IT IS IMPORTANT THAT ONLY THE CORRECT FLUE BLOWER SPECIFIED FOR EACH MODEL TYPE IS USED WHEN REPLACING THESE ITEMS.
Carry out a start-up after working on or changing a flue blower. See Page 25, Section 11.
41 of 45
Page 50
UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL
15.6 Pressure Switch
WARNING
Carbon Monoxide Hazard
Use correct pressure switch specified for each model.
Use of incorrect pressure switch or disabling pressure switch circuit could cause unsafe condition.
Failure to follow these instructions can result in death or serious injury.
Pull off 3 way connector. Spring open plastic clips of mounting cradle. Replace with correct type of pressure switch for model. The pressure switches are color coded for each pressure setting.
Carry out a start-up after working on or changing a pressure switch. See Page 25, Section 11.
MODEL UHD[X][S] 75 UHD[X][S] 100 UHD[X][S] 125
Pressure Switch Kit P/N
Color Code
Set Point in wc
Pressure Switch Snap Ring P/N
90439804 90439805 90439810
white blue black
0.47 0.55 0.35
90439850 90439850 90439850
15.7 Ignition Control
The control mounts to the heat exchanger plate. Pull out ignition cable and wiring from board, noting their
positions. Release the four mounting standoffs. Refit in reverse. Ensure correct location of ignition cable and all other wiring.
15.8 Limit Switches
15.8.1 Removal and Replacement
1. Remove the electrical connections to the switch.
2. Unscrew the two screws securing the switch.
3. Fit a new switch with two screws.
4. Reconnect the electrical connections and test operation.
42 of 45
Page 51
SECTION 16: SPECIFICATIONS
16.1 Dimension Data
SECTION 16: SPECIFICATIONS
Models A B C D E F G H J K L M N P Q R
UHD[X][S]
75
UHD[X][S]
100
UHD[X][S]
125
in cm28.7
73.0
in cm28.7
73.0
in cm28.7
73.0
17.7
45.0
22.7
57.6
22.7
57.6
22.3
56.6
22.3
56.6
22.3
56.6
17.6
44.7
17.6
44.7
17.6
44.7
18.6
47.2
18.6
47.2
18.6
47.2
2.0
5.0
2.0
5.0
2.0
5.0
6.0
2.8
15.2
7.1
6.0
2.7
15.2
6.9
6.0
2.7
15.2
6.9
6.8
2.5
17.3
6.4
8.6
21.8--
8.6
21.8--
3.3
8.4
3.3
8.4
3.3
8.4
1.9
4.8
1.9
4.8
1.9
4.8
20.3
10.4
51.6
26.4
20.3
10.4
51.6
26.4
20.3
10.4
51.6
26.4
0.6
1.5
0.6
1.5
0.6
1.5
0.5
1.4
0.5
1.4
0.5
1.4
43 of 45
Page 52
UHD LOW PROFILE DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL
16.2 General Technical Data Table
Model UHD[X][S] 75 UHD[X][S] 100 UHD[X][S] 125
Full Load Amps @ 120 V A 1 2 2
Minimum Air Volume CFM 850 950 1020
Temperature Rise @ Minimum Air Volume °F (
Heat Exchanger Pressure Drop @ Minimum Air Volume in wc 0.06 0.05 0.06
Maximum Air Volume CFM 2650 3660 4750
Temperature Rise @ Maximum Air Volume °F (
Heat Exchanger Pressure Drop @ Maximum Air Volume in wc 0.36 0.55 0.98
Flue Size/Air Intake** in (cm) 4 (10)-All models
Duct Size (Width) in (cm) 16 3/4 (43) 21 3/4 (55) 21 3/4 (55)
Duct Size (Height) in (cm) 15 7/8 (40) 15 7/8 (40) 15 7/8 (40)
Weight lb (kg) 81 (36.7) 92 (41.7) 97 (44)
Recomended Mounting Height to Heater Base ft (m) 12 (3.66) 20 (6.10) 20 (6.10)
°C)
°C)
68 (37) 78 (43) 92 (51)
22 (12) 22 (12) 20 (11)
*Do not exceed the maximum length of flue stated or heater may not operate properly.
16.3 Technical Data Table
Model UHD[X][S] 75 UHD[X][S] 100 UHD[X][S] 125
Total Input (Btu/h) x (1000) 75 100 125
Total Output (Btu/h) x (1000) 61.5 82 102.5
Efficiency % 82-All models
Natural Gas Data - Inlet Pressure 5.0 in wc Min., 14 in wc Max.
Burner Pressure in wc 3.2 2.7 3.0
LPG / Propane Data - Inlet Pressure 12.0 in wc Min., 14 in wc Max.
Burner Pressure in wc 10.1 8.9 9.15
44 of 45
Page 53
®
SECTION 17: RAPID
UHD-SERIES WARRANTY
RAPID ENGINEERING LLC WILL PAY FOR:
Within 24 months from date of purchase by buyer or 27
months from the date of shipment by Rapid Engineering LLC (whichever comes first), replacement parts will be provided free of charge for any part of the product which fails due to a manufacturing or material defect.
Rapid Engineering LLC will require the part in question to be returned to the factory. Rapid Engineering LLC will, at its sole discretion, repair or replace after determining the nature of the defect and disposition of part in question.
RAPID® Replacement Parts are warranted for a period of 18 months from date of shipment from Rapid Engineering LLC or the remaining RAPID
®
UHD-Series warranty.
RAPID ENGINEERING LLC WILL NOT PAY FOR:
Service trips, service calls and labor charges. Shipment of replacement parts. Claims where the total price of the goods have not
been paid. Damage due to:
• Improper installation, operation or maintenance.
• Misuse, abuse, neglect, or modification of the RAPID UHD-Series in any way.
• Use of the RAPID
®
UHD-Series for other than its
intended purpose.
• Incorrect gas or electrical supply, accident, fire, floods, acts of God, war, terrorism, or other casualty.
• Improper service, use of replacement parts or accessories not specified by Rapid Engineering LLC.
• Failure to install or maintain the RAPID
®
UHD-Series
as directed in the Installation, Operation and Service manual.
• Relocation of the RAPID
®
UHD-Series after initial
installation
• The use of the RAPID
®
UHD-Series in a corrosive
atmosphere containing contaminants.
• The use of the RAPID
®
UHD-Series in the vicinity of a
combustible or explosive material.
• Any defect in the RAPID
®
UHD-Series arising from a
drawing, design, or specification supplied by or on behalf of the consumer.
• Damage incurred during shipment. Claim must be filed with carrier.
WARRANTY IS VOID IF:
The RAPID
qualified in the installation and service of gas-fired heating equipment.
You cannot prove original purchase date and required
annual maintenance history.
The data plate and/or serial number are removed,
defaced, modified or altered in any way.
The ownership of the RAPID
transferred. This warranty is nontransferable. Rapid Engineering LLC is not permitted to inspect the
damaged controller and/or component parts.
®
UHD-Series is not installed by a contractor
®
UHD-Series is moved or
SECTION 17: RAPID® UHD-SERIES WARRANTY
READ YOUR INSTALLATION, OPERATION AND SERVICE MANUAL
If you have questions about your controller, contact your installing professional. Should you need Replacement Parts or have additional questions, call or write:
Rapid Engineering LLC
1100 Seven Mile Road NW Comstock Park, MI 49321 Telephone: +1.616.784.0500 Fax: +1.616.784.1910 Toll Free: 800.536.3461
www.rapidengineering.com
Rapid Engineering LLC' liability, and your exclusive remedy, under this warranty or any implied warranty (including the implied warranties of merchantability and fitness for a particular purpose) is limited to providing replacement parts during the term of this warranty. Some jurisdictions do not allow limitations on
how long an implied warranty lasts, so this limitation may not apply to you. There are no rights, warranties or
®
conditions, expressed or implied, statutory or otherwise, other than those contained in this warranty.
Rapid Engineering LLC shall in no event be responsible for incidental or consequential damages or incur liability for damages in excess of the amount paid by you for the RAPID
®
UHD-Series. Some
jurisdictions do not allow the exclusion or limitation of incidental or consequential damages, so this limitation or exclusion may not apply to you. This warranty gives you specific legal rights, and you may also have other rights which vary from jurisdiction to jurisdiction.
Rapid Engineering LLC shall not be responsible for failure to perform under the terms of this warranty if caused by circumstances out of its control, including but not limited to war, fire, flood, strike, government or court orders, acts of God, terrorism, unavailability of supplies, parts or power. No person is authorized to assume for Rapid Engineering LLC any other warranty, obligation or liability.
LIMITATIONS ON AUTHORITY OF REPRESENTATIVES:
No representative of Rapid Engineering LLC, other than an Executive Officer, has authority to change or extend these provisions. Changes or extensions shall be binding only if confirmed in writing by Rapid Engineering LLC's duly authorized Executive Officer.
45 of 45