Radwin WinLink 1000 Installation And Operation Manual

W
n
k
0
Installation and Operation Manual
i
Point-to-Point Wireless Product Family
Revision 3.0
Lin
WinLink 1000
Point-to-Point Wireless TDM/IP Revision 3.0
Installation and Operation Manual
Notice
This manual contains information that is proprietary to RADWin Ltd. ("RADWIN"). No part of this publication may be reproduced in any form whatsoever without prior written approval by RADWIN Ltd.
Right, title and interest, all information, copyrights, patents, know-how, trade secrets and other intellectual property or other proprietary rights relating to this manual and to the WinLink 1000 and any software components contained therein are proprietary products of RADWIN protected under international copyright law and shall be and remain solely with RADWIN.
WinLink 1000 is a registered trademark of RADWIN. No right, license, or interest to such trademark is granted hereunder, and you agree that no such right, license, or interest shall be asserted by you with respect to such trademark.
You shall not copy, reverse compile or reverse assemble all or any portion of the Manual or the WinLink 1000. You are prohibited from, and shall not, directly or indirectly, develop, market, distribute, license, or sell any product that supports substantially similar functionality as the WinLink 1000, based on or derived in any way from the WinLink 1000. Your undertaking in this paragraph shall survive the termination of this Agreement.
This Agreement is effective upon your opening of the WinLink 1000 package and shall continue until terminated. RADWIN may terminate this Agreement upon the breach by you of any term hereof. Upon such termination by RADWIN, you agree to return to RADWIN the WinLink 1000 and all copies and portions thereof.
For further information contact RADWIN at the address below or contact your local distributor.
International Headquarters RADWIN Ltd.
32 Habarzel Street Tel Aviv 69710 Israel Tel: 972-3-7662900 Fax: 972-3-7662902 E-mail: support@radwin.com
U.S. Headquarters RADWIN Inc.
900 Corporate Drive Mahwah, NJ 07430 USA Tel: (201) 529-1100Fax: (201) 529­5777 E-mail: support-usa@radwin.com
FCC-15 User Information
This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures:
-- Reorient or relocate the receiving antenna.
-- Increase the separation between the equipment and receiver.
-- Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. Consult the dealer or an experienced radio/TV technician for help.
Changes or modifications to this equipment not expressly approved by the party responsible for compliance (RADWIN) could void the user’s authority to operate the equipment.
It is the responsibility of the installer to ensure that when using the outdoor antenna kits in the United States (or where FCC rules apply), only those antennas certified with the product are used. The use of any antenna other than those certified with the product is expressly forbidden in accordance to FCC rules CFR47 part 15.204.
Warning
Installing WinLink 1000 Units 1
Quick Start Guide
Installation of WinLink 1000 should be carried out only by a qualified technician. If you are familiar with WinLink 1000, use this guide to prepare the units for operation.
1. Installing WinLink 1000 Units
ODU Package Contents:
ODU
Mast/Wall mounting kit
WinLink 1000 Management software installation CD
Mounting instructions
Spare RJ-45 connector
ODU to IDU cable at length ordered (optional)
IDU-E Package Contents:
IDU-E
110V/240V adaptor
IDU wall-mounting drilling template
Spare RJ-45 connector
(Optional) IDU-C Package Contents:
IDU-C
For AC model, 110v/240 VAC with 3-prong connector cable
For DC model, -48 VDC with 3-pin terminal block connector (green)
IDU standard 1-U, 19” carrier rack
Spare RJ-45 connector
Equipment Required:
RJ-45 crimp tool (If pre-assembled cable is not used)
Quick Start Guide WinLink 1000 Installation and Operation Manual
2 Installing WinLink 1000 Units
Drill (for wall mounting only)
IDU and ODU grounding cable
13 mm or 1/2 socket spanner
ODU to IDU cable if not ordered (Outdoor class, CAT-5e, 4 twisted
pairs)
Cable ties
Laptop running Windows 2000 or Windows XP
Before the installation
1. Install the WinLink 1000 software on the laptop.
2. Verify that all equipment and tools are available.
Performing Installation
Î
To install the ODU:
1. At site A, route the ODU cable from the ODU location (on the roof) to the IDU location (inside the building). The maximum length is 100m.
2. Mount the ODU unit to the mast or wall, using the mounting kit.
3. Connect the RJ-45 connectors to both ends of the cable, use the pinout table and diagram below:
IDU RJ-45 Wire Color Function ODU RJ-45
1 White/Green Ethernet (RxN) 1
Twisted
2 Green Ethernet (RxT) 2
3 White/Orange Ethernet (TxT) 3
Twisted
4 Blue Power (+) 4
5 White\Blue Power (+) 5
Twisted
6 Orange Ethernet (TxN) 6
7 White/Brown
Power (−)
7
Twisted
8 Brown
Power (−)
8
4. Secure the ODU and ground cables to the mast or brackets using cable ties.
5. Repeat the procedure at site B.
WinLink 1000 Installation and Operation Manual Quick Start Guide
Installing WinLink 1000 Units 3
Î
To align the ODU:
1. Connect power to the IDU.
Do not stand in front of a live outdoor unit.
The antenna used for this transmitter must be installed to provide a separation distance of at least 200 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter.
2. Align the site A ODU in the direction of the site B ODU.
3. Align the site B ODU in the direction of the site A ODU.
4. Alternating between each site, turn each ODU slowly listening to the buzzer beep sequence until optimal alignment is achieved.
5. Secure the site A and site B ODUs to the mast/wall.
6. Monitor the link quality for about 15 minutes to verify stability.
7. Connect the management station to one of the two IDUs in the link.
8. Start the WINLink Manager application.
9. Open the installation wizard and follow the installation steps.
10. After selection of the radio channel and the link rate, verify that the link quality bar in the WinLink manager is within the green range for TDM service and within the yellow range for Ethernet service.
Achieve the best possible link quality values. In case of radio link loss, verify the ODU alignment, or change the radio channel in both sides of the link. When the radio link resumes continue the installation process.
Connecting User Equipment
Î
To connect user equipment to the IDU:
1. Connect the user equipment (such as PBX) to the IDU RJ-45 port designated Trunk:
On the rear panel of the IDU-E.
On the front panel of the IDC-C,
2. Connect user hub/router or any other compatible device to the IDU RJ-45 port designated LAN:
On the rear panel of the IDU-E.
Note
Warning
Quick Start Guide WinLink 1000 Installation and Operation Manual
4 Operating WinLink 1000
On the front panel of the IDU-C.
IDU-C has an integrated LAN switch that provide 2 port of 10/100BaseT. The Integrated LAN switch is not support spanning tree. The two LAN ports can be connected to 2 separated LAN segments but connection of both LAN ports to the same LAN segment will create a loop that fluid the network. Therefore, this configuration is prohibited.
2. Operating WinLink 1000
WinLink 1000 requires no operator attention once installed, with the exception of occasional monitoring of front panel indicators and statistics data. Intervention is only required when WinLink 1000 must be configured to its operational requirements or diagnostic tests are performed:
Normal Indications
Upon turning on WinLink 1000, the PWR LED in the front panel lights to indicate that WinLink 1000 is on. The table below shows the correct status of the indicators after power-up.
Indicator Color Status
PWR Green On (only on IDU-E)
IDU Orange
Green
Blinks for short duration during startup Blinking slowly shows normal operation
ODU Green Blinking slowly shows normal operation
AIR I/F Orange
Green
Blinks for short duration during startup Blinking slowly shows normal operation
SERVICE Green Blinking slowly shows normal operation
OFF when SERVICE selected is Ethernet only
Note
WinLink 1000 Installation and Operation Manual Quick Start Guide
Operating WinLink 1000 5
Troubleshooting
If the WinLink 1000 is not operational, determine the cause and solution from the table below.
Led Status Remedy
PWR Off For the IDU-E, check that AC adapter is connected
to the IDU and the AC power outlet.
IDU Orange Check that the IDU/ODU cable is properly wired
and connected.
ODU Red Check that the IDU/ODU cable is properly wired
and connected.
Orange Complete the installation procedure from the
management software.
AIR I/F
Red Check the ODU Antenna alignment. Check that
the radio configuration of both site A and site B units are the same (channel and SSID).
Off Check the TDM service configuration in the NMS.
Orange Check that the system is not in loopback mode.
Check the site B IDU ports and cables and site B external equipment.
SVC.
Red Check the site A IDU ports, cables and external
equipment.
Contents
Chapter 1. Introduction
1.1 Overview ..................................................................................................1-1
Application....................................................................................................... 1-1
Features........................................................................................................... 1-2
1.2 Physical Description.................................................................................. 1-4
Chapter 2. Installation and Setup
2.1 WinLink 1000 System ............................................................................... 2-1
2.2 Site Requirements and Prerequisites ......................................................... 2-2
2.3 Package Contents ..................................................................................... 2-2
2.4 Installation and Setup ............................................................................... 2-3
Mounting the ODU ........................................................................................... 2-4
Connecting the ODU to the IDU ........................................................................ 2-5
Connecting the Power ...................................................................................... 2-6
Installing WinLink 1000 Management Software ................................................. 2-7
Aligning the WinLink 1000 ODUs...................................................................... 2-9
Installing the Link........................................................................................... 2-10
Connecting the User Equipment ..................................................................... 2-18
Chapter 3. Configuration
3.1 Performing Configuration of WinLink 1000 ............................................... 3-1
Configuring Service Parameters ...................................................................... 3-10
Editing the Configuration Parameters ............................................................. 3-13
Changing the Transmit Power......................................................................... 3-15
Defining the Management Addresses.............................................................. 3-15
3.2 Bridge Configuration .............................................................................. 3-17
Detailed description ....................................................................................... 3-17
ODU Bridge Mode........................................................................................... 3-18
IDU Aging time............................................................................................... 3-18
Chapter 4. Operation
4.1 Indicators ................................................................................................. 4-1
Panel Indicators................................................................................................ 4-1
Connector LED Indicators ................................................................................. 4-2
Installation and Operation Manual i
Table of Contents
4.2 Operating WinLink 1000 ........................................................................... 4-3
Turning On WinLink 1000................................................................................. 4-3
Normal Indications ........................................................................................... 4-4
Turning Off WinLink 1000 ................................................................................ 4-4
Changing the Password .................................................................................... 4-4
4.3 Managing WinLink 1000 ...........................................................................4-5
Resetting WinLink 1000.................................................................................... 4-7
Saving WinLink 1000 Configuration in a File ..................................................... 4-7
Restoring a Configuration File .......................................................................... 4-8
Displaying the WinLink 1000 Inventory............................................................. 4-8
Chapter 5. Diagnostics and Troubleshooting
5.1 Error Detection and Alarms....................................................................... 5-1
5.2 Collecting and Saving Statistics................................................................. 5-2
5.3 Running Diagnostic Loopbacks .................................................................5-3
Local External Loopback................................................................................... 5-4
Remote Internal Loopback................................................................................ 5-5
Remote External Loopback ............................................................................... 5-5
Local Internal Loopback.................................................................................... 5-6
5.4 Troubleshooting .......................................................................................5-6
5.5 Frequently Asked Questions .....................................................................5-8
Air Interface ..................................................................................................... 5-8
Management .................................................................................................... 5-9
Services.......................................................................................................... 5-10
Antennas and Cables...................................................................................... 5-10
Competitve .................................................................................................... 5-10
5.6 Technical Support................................................................................... 5-11
Appendix A. Wiring Specifications
Appendix B. Mast and Wall Installation Appendix C. Link Budget Calculator Appendix D. TDM Clock Configuration
ii WinLink-1000 Installation and Operation Manual
Table of Contents
List of Figures
1-1. Typical Application.......................................................................................... 1-1
1-2. WinLink 1000 Units ......................................................................................... 1-4
2-1. Typical Installation Diagram ............................................................................ 2-4
2-2. IDUs connector panels..................................................................................... 2-6
2-3. Login Screen ...................................................................................................2-8
2-4. Login vial Local Connection Screen ..................................................................2-9
2-5. Main Menu ...................................................................................................... 2-9
2-6. Beeper Sequence for ODU Alignment .............................................................2-10
2-7. Link Installation Wizard ................................................................................. 2-11
2-8. Installation Wizard, System dialog box ..........................................................2-12
2-9. Installation Wizard, Channel Select dialog box............................................... 2-13
2-10. Installation Wizard, Channel Select dialog box (Automatic Channel Select
enabled) ...........................................................................................................2-14
2-11. Installation Wizard, Channel Select dialog box (Supporting DFS, ETSI standard
requirement) .................................................................................................... 2-15
2-12. Installation Wizard, Rates dialog box ...........................................................2-16
2-13. Installation Wizard, Services dialog box .......................................................2-17
2-14. Installation Wizard, Finish Screen ................................................................2-18
3-1. WinLink Manager Main Menu ...........................................................................3-2
3-2. Configuration Link Wizard ...............................................................................3-3
3-3. Link Configuration, System dialog box ............................................................ 3-4
3-4. Link Configuration, Channel select dialog box................................................. 3-5
3-5. Link Configuration, Channel select dialog box with Automatic Channel select .3-6
3-6. Link Configuration, Channel select dialog box with DFS .................................. 3-7
3-7. Channel reselection confirmation dialog box ...................................................3-8
3-8. Reselection process......................................................................................... 3-8
3-9. Reselection process "channel not active in list" ................................................ 3-9
3-10. Air Interface Rate select Dialog Box ............................................................... 3-9
3-11. Service Parameters Dialog Box, E1/T1 Interface ...........................................3-11
3-12. Service Parameters Dialog Box, Ethernet only Interface ................................3-12
3-13. Configuration Link, Finish screen ................................................................3-13
3-14. Configuration Dialog Box ............................................................................3-14
3-15. Changing the Transmit Power...................................................................... 3-15
3-16. Configuration, Management ........................................................................ 3-16
3-17. Site configuration dialog box....................................................................... 3-17
Installation and Operation Manual iii
Table of Contents
3-18. Hub mode selected ..................................................................................... 3-19
3-19. Hub mode, no IDU Aging............................................................................. 3-20
3-20. Bridge mode, no IDU Aging ......................................................................... 3-21
4-1. IDU Panels LEDs ..............................................................................................4-1
4-2. Main Menu, Wireless Link is Active ..................................................................4-5
4-3. WinLink 1000 Inventory................................................................................... 4-9
5-1. Preferences Dialog Box, Event Log Tab ............................................................ 5-3
5-2. Loopbacks Dialog Box ..................................................................................... 5-4
5-3. Local External Loopback.................................................................................. 5-5
5-4. Remote Internal Loopback ...............................................................................5-5
5-5. Remote External Loopback .............................................................................. 5-6
5-6. Local Internal Loopback................................................................................... 5-6
iv WinLink-1000 Installation and Operation Manual
Table of Contents
List of Tables
4-1. IDU Panel LEDs ................................................................................................ 4-2
4-2. WAN/LAN LEDs................................................................................................ 4-2
4-3. TDM Traffic Indicators..................................................................................... 4-2
4-4. WinLink 1000 Indicators at Startup.................................................................. 4-4
5-1. WinLink 1000 Alarms and Information Messages .............................................5-2
5-2. Troubleshooting with WinLink 1000 LEDs........................................................ 5-7
Table A-1. ODU-IDU Cable Connector Pinout ..........................................................A-1
Table A-2. E1/T1 Connector Pinout ........................................................................A-2
Table A-3. Fast Ethernet Connector Pinout..............................................................A-2
Table A-4. Terminal Block 3-pin -48VDC................................................................A-3
Table A-5. Alarm Connector (Dry-Contact) .............................................................A-3
Installation and Operation Manual v
Application
Chapter 1
Introduction
1.1 Overview
WinLink 1000 is a carrier-class, high capacity, Point-to-Point broadband wireless transmission system. WinLink 1000 combines legacy TDM and Ethernet services over 2.4GHz, 4.9GHz, and 5.xGHz license-exempt bands and is suitable for deployment in FCC, ESTI, or CSA regulated countries. The system provides up to 48 Mbps wireless link and supports ranges of up to 80 km (50 miles).
Figure 1-1
WinLink 1000 units.
illustrates a typical point-to-point application of two
Figure 1-1. Typical Application
Overview 1-1
Chapter 1 Introduction WinLink 1000 Installation and Operation Manual
Features
Wireless Link
WinLink 1000 delivers up to 48 Mbps data rate for Ethernet and E1/T1 traffic. The system supports a variety of spectrum bands and can be configured to operate in any channel on the band with a carrier step resolution of 5 MHz.
WinLink 1000 operation complies with ETSI, CSA and the FCC 47CFR Part 15 and subpart C and E requirements.
WinLink 1000 employs Time Division Duplex (TDD) transmission. This technology simplifies the installation and configuration procedure. There is no need to plan and to allocate separate channels for the uplink and downlink data streams. Operation over 2.4GHz, 4.9 GHz, and 5.x GHz bands is not affected by harsh weather conditions, such as fog, heavy rain etc.
LAN Interface
The WinLink 1000 LAN port provides 10/100BaseT interfaces with auto negotiation and transparent VLAN support. Traffic handling is provided by a MAC-level self-learning bridge.
TDM Interface
The WinLink 1000 TDM interface accepts E1 or T1 traffic, supporting the following:
Unframed operation (E1 and T1)
AMI and B8ZS zero suppression (T1).
Management
WinLink 1000 has full local and remote management capabilities. The user-friendly SNMP-based management tool provides full end-to-end configuration, event log and performance monitoring capabilities.
Diagnostics and Performance Monitoring
WinLink 1000 supports activating local and remote loopbacks on E1/T1 links.
1-2 Overview
WinLink 1000 Installation and Operation Manual Chapter 1 Introduction
WinLink 1000 constantly monitors the data transmission process, evaluates received signal strength, and signal quality. It also monitors received traffic and frame rate (FPS) for local and remote units.
Optional External Antenna
WinLink 1000 supports configuration of an external antennae. In this configuration, the radio supplies an N-type connector that connects through a coax cable to the external antenna.
An external antenna can extend the range of the link, and in some cases, it might help to reduce environmental interferences. Various external antennae are available for the WinLink 1000 operating frequencies.
For example, an optional flat panel 28 dBi external antenna increases the operation range of WinLink 1000 up to 80 km (50 miles).
Overview 1-3
Chapter 1 Introduction WinLink 1000 Installation and Operation Manual
1.2 Physical Description
WinLink 1000 system consists of an Outdoor Unit (ODU) and an Indoor Unit (IDU).
Figure 1-2
illustrates a WinLink 1000 unit assembly.
Figure 1-2. WinLink 1000 Units
IDU-E
The IDU-E front panel includes five LEDs that display the status of E1/T1 and LAN, wireless link, self-test results, ODU-to-IDU link, and power status. For a detailed description of the front panel LEDs, see
Chapter 4
.
The rear panel of the indoor unit (IDU) includes the power, WAN, LAN and E1/T1, and ODU connectors. The rear panel LEDs are described in
Chapter 4
IDU-C
, and the wiring specifications detailed in
Appendix A
.
The IDU-C front panel includes four LEDs that display the status of E1/T1and, wireless link, self-test results, and ODU-to-IDU link. For a detailed description of the front panel LEDs, see
Chapter 4
.
1-4 Physical Description
WinLink 1000 Installation and Operation Manual Chapter 1 Introduction
Technical Specifications
Air-Interface
Technology
Frequency Band
Range
Duplexing Method
Capacity
Modulation
Channel setting Resolution
Transmitter Power
OFDM
2.400–2.4835 GHz FCC/ETSI
2.416–2.4835 GHz (Israel)
4.940-4.990 GHz FCC
5.250–5.350 GHz FCC
5.470–5.725 GHz FCC/ETSI
5.725–5.850 GHz FCC
Up to 80 km (50 miles)
Time Division Duplex (TDD)
Configurable up to 48 Mbps
OFDM - BPSK, QPSK, 16QAM, 64QAM
5 MHz
17 dBm max, for 4.9GHz 12.8 dBm max.
(Blocked by product SW and can not be changed).
LAN Interface
E1 Interface
T1 Interface
ODU Installation
PHY IF
Framing/Coding
Bridging
Line Impedance
VLAN Support
Connector
Data Rate
Line Interface
Connector
Data Rate
Mast or wall mounting
Up to 2 x 10/100BaseT, auto-sensing
IEEE 802.3/U
Self-learning, up to 2000 MAC addresses
100Ω
Transparent
RJ-45
1, 2, 4 x E1 Unframed (Transparent) 2.048 MHz
HDB3
RJ-45
1, 2, 4 x T1 Unframed (Transparent) 1.544 MHz
Physical Description 1-5
Chapter 1 Introduction WinLink 1000 Installation and Operation Manual
Indicators
Power
Line Interface
Connector
PWR (green)
IDU (green)
ODU (green/red)
AIR I/F (green/red)
SERVICE (green/red)
Source IDU-E
Source IDU-C
Power Consumption
AMI, B8ZS
RJ-45
Power status
IDU status
ODU-to-IDU link status
Air Interface status
E1/T1 signal status
100–240 VAC -48VDC via external AC/DC converter
100–240 VAC via cable & plug, or -24VDC or
-48VDC from rack
10W max – IDU-E and ODU
14W max – IDU-C and ODU
Physical
Connector
Outdoor Unit (ODU) with integrated antenna
Height
Width
Depth
Weight
Indoor Unit
Height
Width
Depth
2-pin for IDU-E
IDU-C:
DC ver: 3-pin terminal block
AC ver: 3-prong plug
305 mm / 12 in
305 mm / 12 in
58 mm / 2.3 in
3.3 kg / 7.2 lb
IDU-E IDU-C
44 mm / 1.7 in (1U) 43 mm / 1.7 in
237 mm / 9.3 in 297 mm / 11.5 in
170 mm / 6.7 in 450 mm / 17.7 in
Environment
1-6 Physical Description
Weight
Outdoor Unit (ODU)
Enclosure
0.58 kg / 1.4 lb 1.5 kg / 3.3 lb
All-weather case
WinLink 1000 Installation and Operation Manual Chapter 1 Introduction
Temperature
Indoor Unit (IDU-E
-35°C to 60°C/-31°F to 140°F
and IDU-C)
Temperature
Humidity
Antenna Characteristics
2.400-
Integrated Antenna 1 ft
Gain 16dBi 22dBi 22dBi 22dBi
Beam width
Polarization Linear Linear Linear Linear
External antenna 1 ft
Gain 21 dbi 22 dBi 22 dBi 22 dBi
2.4835 GHz
20°
-5°C to 45°C/23°F to 113°F
Up to 90%, non-condensing
4.940-
4.990GHz
N/A
5.250-
5.350GHz
9° 9° 9°
5.4470-
5.725GHz
5.725-
5.850GHz
Beam width N/A
Polarization Linear Linear Linear Linear
External Antenna 2 ft
Gain 24dBi 27 dbi 28dBi 28dBi 28dBi
Beam width
Polarization Linear Linear Linear Linear Linear
External Antenna 3 ft
Gain 32 dBi 32.5 dBi
Beam width N/A N/A
Polarization Linear Linear
* Antennaes with higher gains are available
8° 4.5° 4.5° 4.5° 4.5°
9° 4.5° 4.5° 4.5°
4.5°
N/A
4.5°
Physical Description 1-7
Chapter 2
Installation and Setup
This chapter describes installation and setup procedures for WinLink 1000 system.
Warning
After installing the unit, refer to instructions and
Chapter 4
for operation instructions.
Chapter 3
In case a problem is encountered, refer to
for configuration
Chapter 5
for test and
diagnostic instructions.
Internal settings, adjustment, maintenance, and repairs may be performed only by a skilled technician who is aware of the hazards involved.
Always observe standard safety precautions during installation, operation, and maintenance of this product.
WinLink 1000 has three types of products:
Auto channel selection is not supported–Previous or Future release.
Auto channel selection supported–User can enable/disable auto channel configuration.
DFS–Auto channel is mandatory.
2.1 WinLink 1000 System
WinLink 1000 system comprises the following units:
Outdoor Unit (ODU): The ODU has 2 configurations: ODU with
integrated antenna and ODU with N-Type connector for connection to an external antenna. Both ODU types have the same interface to the IDU. The ODU with integrated antenna has an enclosed aluminum frame with a front sealed plastic cover, containing an integrated transceiver with an antenna, RF module, modem and standard interfaces.
WinLink 1000 System 2-1
Chapter 2 Installation and Setup WinLink 1000 Installation and Operation Manual
ODU includes a power connector that receives -48 VDC and a RJ-45 for Ethernet traffic from the indoor unit (IDU).
The ODU is attached to a mast using a special mounting kit, which is supplied with the unit.
Indoor Unit (IDU): There are two types of IDU cages. IDU-E that is a
plastic box of ½ x 19 in. and IDU-C that is based on a metal 19in. box address the carrier-class applications. IDU is the interface unit between the ODU and the user. It converts 100–240 VAC to
-48VDC, and feeds the ODU by it. The IDU does not store any configuration data. Therefore, there is no need for additional configuration of the WinLink 1000 system when replacing an IDU.
2.2 Site Requirements and Prerequisites
For the IDU, allow at least 90 cm (36 in) of frontal clearance for operating and maintenance accessibility. Allow at least 10 cm (4 in) clearance at the rear of the unit for signal lines and interface cables.
The ambient operating temperature should be –45°C to 60°C/-49°F to 140°F (ODU), or -5°C to 45°C/23°F to 113°F (IDU) at a relative humidity of up to 90%, non-condensing.
Before starting the installation, use the
Link Budget Calculator
utility to calculate expected performance of the link. You can vary parameter inputs to the calculator to determine the optimum system configuration. The utility is described in
Appendix C
.
2.3 Package Contents
The WinLink 1000 packages include the following items:
ODU Package Containing:
ODU
Mast/Wall mounting kit plus mounting instructions
WinLink 1000 Manager installation CD
Spare RJ-45 Connector
IDU-E Package Contents:
IDU-E
2-2 Package Contents
WinLink 1000 Installation and Operation Manual Chapter 2 Installation and Setup
110V/240V adaptor
IDU wall-mounting drilling template
Spare RJ-45 connector
(Optional) IDU-C Package Contents:
IDU-C
For AC model, 110v/240 VAC with 3-prong connector cable
For DC model, –24VDC or -48 VDC with 3-pin terminal block
connector (green)
IDU standard 1-U, 19” carrier rack
Spare RJ-45 connector
External antenna (if ordered)
ODU/IDU Cable at length ordered (optional)
2.4 Installation and Setup
Physical installation of the WinLink 1000 system installation includes the following steps:
1. Installing ODU at both sites of the link.
2. Installing ODU cable and connecting ODU to IDU at both sites.
3. Connecting power.
4. Installing the management program on the network management
station.
5. Running the Installation wizard from the management program.
6. Aligning the ODUs.
7. Connecting user equipment to the local and remote IDUs.
Installation and Setup 2-3
Chapter 2 Installation and Setup WinLink 1000 Installation and Operation Manual
Figure 2-1
illustrates a typical installation of WinLink 1000 with an
external antenna.
Mounting the ODU
The ODU is the transmitting and receiving element of the WinLink 1000 system. The ODU can be mounted on a mast or a wall. In both installations, the supplied mounting kit is used to secure the ODU.
Appendix B
A WinLink 1000 link operates in pairs of two WinLink 1000 systems with the same configuration. Both systems must be installed, and the antennas of the outdoor units must be aligned for maximum throughput.
2-4 Installation and Setup
Figure 2-1. Typical Installation Diagram
describes the mast/wall installation instructions.
WinLink 1000 Installation and Operation Manual Chapter 2 Installation and Setup
Prior to connecting cables to the ODU, the protective earth terminal (screw) of the ODU must be connected to an external protective ground conductor or to a grounded mast.
Warning
Only a qualified person using the proper safety equipment should climb the antenna mast. Only trained professional installers should be used when installing or dismantling ODUs and masts.
Î
To mount the ODU:
1. Verify that the ODU mounting brackets are properly grounded.
2. Attach the ODU unit to the mast. Refer to
mounting instructions.
3. Connect the ground cable to the chassis point on the ODU.
4. Attach the ODU cable to the RJ-45 connector. Refer to
for the connector pinout.
5. Secure the cables to the mast or brackets using provided UV-rated
cable ties.
6. Repeat the procedure at the remote site.
Do not tightly secure the ODU to its mounting brackets, until the alignment process of the antenna is complete.
When installing the ODU, it is important to check that there are no direct obstructions in front of the ODU or interference from man-made obstacles.
Connecting the ODU to the IDU
Appendix B
for the ODU
Appendix A
The ODU cable conducts all the user traffic between the IDU and the ODU. The ODU cable also provides -48 VDC supply to the ODU. The maximum length for one leg of the ODU cable is 100m (328 ft) in accordance with10/100BaseT standards.
ODU cable is supplied pre-assembled with RJ-45 connectors, at the length specified when ordering. If the ODU cable was not ordered, use Cat. 5e shielded cable, the wiring specifications are given in
Appendix A
1. Route the cable from the ODU location into the building, leaving
some spare. Secure the cable along its path.
Installation and Setup 2-5
.
Chapter 2 Installation and Setup WinLink 1000 Installation and Operation Manual
2. Connect the ODU cable to the RJ-45 connector on the IDU panel
designated WAN.
Figure 2-2
illustrates a typical panel of the IDU-E
and IDU-C.
Other models may have a different configuration for these panels.
Connecting the Power
Before connecting any cable, the protective earth terminals of the AC/DC power must be connected to the protective ground conductor of the mains power cord. (Applies to both IDU models.) If you are using an extension cord (power cable) make sure it is grounded as well.
Warning
Any interruption of the protective (grounding) conductor (inside or outside the instrument) or disconnecting of the protective earth terminal can make this unit dangerous. Intentional interruption is prohibited.
Power is supplied to WinLink 1000 via an external AC/DC converter, which receives power from 110–240 VAC source and converts it to
-24VDC or -48 VDC.
Figure 2-2. IDUs connector panels
2-6 Installation and Setup
WinLink 1000 Installation and Operation Manual Chapter 2 Installation and Setup
Î
To connect the power IDU-E:
1. Connect the 2-pin plug of the AC/DC converter to the 2-pin DC
power connector on the IDU-E rear panel.
2. Connect the AC/DC converter 3-prong plug to mains outlet.
Î
To connect the power for IDU-C:
For AC power model, connect the AC cable 3-prong plug to mains
outlet.
For DC power model, connect to DC supply on the rack (male
connector for the terminal block is included).
Installing WinLink 1000 Management Software
WinLink 1000 management application is distributed on CD-ROM as an executable file. The application has the following PC requirements:
Memory: 128 MB RAM
Disk: 1 GB free hard disk space
Processor: Pentium 3 or higher
Network: 10/100BaseT NIC
Graphics: Card and Monitor that supports 1024×768 screen
resolution with 16 bit color
Operating system: Windows 2000/XP
Microsoft Explorer 5.01 or later.
Î
To install the WinLink 1000 management program:
1. Insert the CD-ROM into your CD-ROM drive.
2. If the installation does not start automatically, run WinLink.exe
from the CD-ROM drive.
3. Follow the on screen instructions of the installation wizard to
complete setup of the WinLink 1000 Management program in the desired location.
Î
To perform initial setup:
1. Power up the site A's IDU (see
Wait about 1 minute.
2. Power up the site B IDU.
Installation and Setup 2-7
Connecting the Power
on page
2-6
).
Chapter 2 Installation and Setup WinLink 1000 Installation and Operation Manual
3. Connect the management station to the LAN.
Any PC running the WinLink 1000 Management application can be used to configure WinLink 1000 units.
Î
To start WinLink manager:
1. From the Start menu, point to Programs, point to WinLInk Manager,
and then click WinLink Manager.
The password/IP request dialog appears.
Note
Figure 2-3. Login Screen
2. Select the suitable option for the IP Address field:
Enter the IP address of the ODU —
The IP address is defined later during link configuration.
default value 10.0.0.120
(optional) If user is connected directly to the IDU LAN port, use
the adjacent list arrow to select Local Connection.
.
2-8 Installation and Setup
Loading...
+ 67 hidden pages