RAB Lighting MEGAFLOOD Installation Instructions Manual

Page 1
®
MEGAFLOODTM INSTALLATION INSTRUCTIONS
Thank you for buying RAB lighting xtures. Our aim is to design the best quality products to get the job done right. We’d like to hear your comments. Call the Marketing Department at 888-RAB-1000, or email: marketing@rabweb.com
IMPORTANT
READ CAREFULL Y BEFORE INST ALLING FIXTURE. RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE.
RAB fi xtures must be wired in accordance with the National Electrical Code and all applicable local codes. Proper grounding is required for safety. This product must be installed in accordance with the applicable installation code by a person familiar with the construction and operation of the product and the hazards involved.
WARNING: Make certain power is OFF before installing or maintaining fi xture.
SLIPFITTER MOUNTING
1. The slipfi tter fi ts a 2 3/8” O.D. tenon. Place the slipfi tter over the tenon and secure with the (2) Set Screws on the side of the slipfi tter.
2. To adjust the angle of the fi xture:
a. Remove (2) Cover Plate Screws and the Round Cover Plate.
b. Hold the top of the fi xture, loosen the Locking Bolt and swivel the fi xture.
c. Tighten the Locking Bolt and re-attach the
Round Cover Plate.
TRUNNION MOUNTING
1. Mount fl oodlight to suitable fl at surface with adequate hardware for that surface.
2. To adjust the angle of the fi xture:
a. Hold top of fi xture, loosen (2) Trunnion Bolts and the Positioning Screw.
b. Swivel the fi xture until positioning screw is in one of the Positioning Holes.
c. Tighten the Trunnion Bolts and the
Positioning Screw.
Locking Bolt
Set Screws
Round Cover Plate
Cover Plate Screws
Page
Trunnion Bolts
2.53”
Positioning
Positioning Screw
1
Holes
5.2”
3.5”
2.5”
.Ø 0.532”
Ø 0.80”
Page 2
®
MEGAFLOODTM INSTALLATION INSTRUCTIONS
REFLECTOR ADJUSTMENT
1. Loosen (4) door screws, open door.
2. Push each side of the refl ector at point shown below. The Refl ector will lock in position.
3. For even distribution, each side of the refl ector should be adjusted to the same position.
4. Refl ectors are factory set at the widest beam, Position #1.
5. To move refl ector back in, gently lift up the refl ector piece with a fl at screwdriver. Bend refl ector back and place behind the 1st position stop.
Wide Beam
Position #1
Middle Beam
Position #2
Position #2 Shown
Narrow Beam
Position #3
GUARD INSTALLATION
1. Mount GDMEGW Guard with (4) #10-24 x 3/8” screws as shown below.
2. Screws are provided with the Guard.
(4) Screws
HOOD INSTALLATION
1. Mount 4” Hood MEGH4 or the 9” Hood MEGH9 with (4) #10-24 x 3/8” screws as shown below.
2. Screws are provided with the Hood.
(4) Screws
Push Here
Hinge
Hinge
3 Position Stops
Adjustable Refl ector: Patent Pending
GUARD & HOOD INSTALLA TION
The wire guard and the 4” Hood MEGH4 or the 9” Hood MEGH9 can be mounted to the same fi xture with (4) #10-24 x 3/8” screws as shown below.
CLEANING & MAINTENANCE
CAUTION: Be sure fi xture temperature is cool enough to touch. Do not clean or maintain while xture is energized.
1. Clean glass lens with non-abrasive glass cleaning solution.
2. As lamps age, light output diminishes. Mass relamping at regular intervals ensures full light output at the highest effi ciency.
Page
2
Page 3
®
MEGAFLOODTM INSTALLATION INSTRUCTIONS
LAMP INSTALLATION
CAUTION: Prior to installing, check that the lamp is the correct ANSI type and wattage. Observe lamp manufacturer’s recommendations on lamp operation, ballast type and burning positions.
1. Disconnect power. Make sure fi xture and lamp are cool enough to touch.
2. Loosen (4) screws from the door of the fi xture. Screws will remain captive to door. Open and swing door down on hinges.
3. Fully screw lamp into socket.
4. Before closing door, make sure door gasket is properly seated all around the door.
5. Check that all mounting bolts are tight.
6. Close door. Tighten screws.
WIRING
All units are factory wired for 277V, except for units with a requested 120V Photocell(“/PC”). If voltages other than 277V are required, remove ballast cover and rewire for the appropriate voltage.
1. Connect the black fi xture lead to the (+) LINE
supply lead.
2. Connect the white fi xture lead to the (-) COMMON
supply lead.
REPLACEMENT LAMPS AND BALLASTS
RAB Lamp ANSI RAB Ballast Wattage Catalog# Code Catalog#
High Pressure Sodium
250 LHPS250 S50 BHPSH250QT 400 LHPS400 S51 BHPSH400QT
Metal Halide
175 LMH175MOG M57 BMHH175QT 200PS LMH200PS M136 BMHH200PSQ 250 LMH250 M58 BMHH250QT 250PS LMH250PS M153 BMHH250PSQ 320PS LMH320PS M154 BMHH320PSQ 350PS LMH350PS M131 BMHH350PSQ 400 LMH400Z M59 BMHH400QT 400PS LMH400PS M155 BMHH400PSQ
480V Ballasts are available, consult factory.
TROUBLESHOOTING
1. Is the proper lamp is installed? Check the wattage and ANSI code on the fi xture label against markings on the lamp. Refer to Replacement Lamp table above for verifi cation.
2. Make sure the lamp is not defective. Try a lamp known to be in operating condition.
3. Check that the line voltage at fi xture is correct. Refer to wiring directions.
3. Connect the Ground wire from fi xture to supply ground.
4. All unused leads must be capped and insulated.
Supply
Note: These instructions do not cover all details or variations in equipment nor do they provide for every possible situation during installation, operation or maintenance.
4. Is there voltage at the lamp socket? If there is no voltage, check all connections.
5. Is the fi xture grounded properly?
6. Is the photocell functioning properly (if used)
?
ACCESSORIES
Wire Guard: GDMEGW 4” Hood MEGH4 9” Hood MEGH9
Factory Installed Photo Cells
120V Button /PC 277V Button /PC2 120V Swivel /PCS
RAB fi xture designs are protected under U.S. and International Intellectual Property laws. Patent Pending
MEG-IN-0208
Page
3
Loading...