RAB Lighting FFLED Slipfitter, FFLED Trunnion Installation Instructions Manual

Page 1
FFLED 120W INSTALLATION INSTRUCTIONS
Thank you for buying RAB lighting xtures. Our goal is to design the best quality products to get the job done right. We’d like to hear your comments. Call the Marketing Department at 888-RAB-1000 or email: marketing@rabweb.com
®
FFLED TrunnionFFLED Sliptter
IMPORTANT
READ CAREFULLY BEFORE INSTALLING FIXTURE. RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE.
RAB xtures must be wired in accordance with the National Electrical Code and all applicable local codes. Proper grounding is required for safety. THIS PRODUCT MUST BE INSTALLED IN ACCORDANCE WITH THE APPLICABLE INSTALLATION CODE BY A PERSON FAMILIAR WITH THE CONSTRUCTION AND OPERATION OF THE PRODUCT AND THE HAZARDS INVOLVED.
WARNING: Make certain power is OFF before installing or maintaining xture. No user serviceable parts inside.
WARNING: RISK OF SERIOUS INJURY OR DEATH!
DO NOT MOUNT THE SLIPFITTER TO A TENON OR BRACKET THAT IS MORE THAN 20 DEGREES FROM VERTICAL. MOUNTING AT ANY ANGLE OTHER THAN 0-20 DEGREES INCREASES THE RISK OF DISENGAGEMENT AND/OR FAILURE OF THE SLIPFITTER. INSTALL THE POLE ON A SECURE BASE OR INSTALL THE BRACKET TO A WALL FIRST. THEN PLACE LUMINAIRE ONTO THE POLE OR BRACKET. DO NOT LIFT LUMINAIRE ASSEMBLED TO POLE OR BRACKET. LUMINAIRE MAY DISENGAGE.
SLIPFITTER MOUNTING
1. The sliptter mounting ts a 2 3/8” O.D. Tenon. Place the sliptter over the Tenon and secure the xture with the Set Screws on the side of the Sliptter.
2. To adjust the angle of the Sliptter, remove screws and plug on Round Cover Plate. Remove the Round Cover Plate. Loosen the Locking Bolt and adjust the angle of the xture as desired.
3. Feed supply wires from Tenon to Sliptter and make necessary connections in the Sliptter and knot wires for strain relief.
4. Tighten the Locking Bolt and re-attach Round Cover Plate. Seal plug on side of Round Cover plate with
Teon Tape or silicone sealant.
Locking Bolt
Sliptter
Set Screws
Round Cover Plate
TRUNNION MOUNTING
CAUTION: UL and C-UL listed or CSA certied liquid tight
cord grip suitable for use with STW exible cord shall be used for connection to a wet location outlet box provided by others.
To adjust the angle of the xture using the trunnion:
1. Loosen the Pivot Bolts & angle locking screw.
2. Adjust xture to desired angle.
3. Tighten Pivot Bolts & angle locking screw.
Pivot Bolts
Tenon
Page 2
FFLED 120W INSTALLATION INSTRUCTIONS
SURGE
PROTECTOR
Thank you for buying RAB lighting xtures. Our goal is to design the best quality products to get the job done right. We’d like to hear your comments. Call the Marketing Department at 888-RAB-1000 or email: marketing@rabweb.com
®
010V DIMMABLE WIRING
Universal voltage driver permits operation at 120V thru 277V, 50 or 60 Hz. Units ordered with (/480V) sux are 480V, 50Hz or 60Hz. For 0-10V Dimming, follow the wiring directions as below.
1. Connect the black xture lead to the LINE supply lead.
2. Connect the white xture lead to the COMMON supply
lead.
3. Connect the GROUND wire from xture to supply ground.
4. Connect the purple xture lead to the (V+) DIM lead.
5. Connect the gray xture lead to the (V-) DIM lead.
6. Cap the yellow xture lead, if present. Do NOT connect.
NOTE: Do not connect DIM V+ (purple)/ DIM V- (gray) to line voltage or supply ground.
SURGE PROTECTOR OPTION
Units ordered with (/SP) sux are provided with 10kV surge protector secured within the xture. Follow wiring directions as below -
1. Connect the black xture lead to the LINE supply lead and black surge protector wire.
2. Connect the white xture lead to the COMMON supply lead and white surge protector wire.
3. Connect the GROUND wire from xture to supply ground and green surge protector wire.
4. Connect the purple xture lead to the (V+) DIM lead.
5. Connect the gray xture lead to the (V-) DIM lead.
NOTE: Do not connect DIM V+ (purple)/ DIM V- (gray) to line voltage or supply ground.
CLEANING & MAINTENANCE
CAUTION: Be sure xture temperature is cool enough to touch. Do not clean or maintain while xture is energized.
1. Lens should be washed in a solution of warm water and any mild, non abrasive household detergent, rinsed with clean water and wiped dry. Do not use chemicals to clean xture.
2. Do not open the xture to clean the LED. Do not touch the LED.
TROUBLESHOOTING
1. Check that the line voltage at the xture is correct. Refer to wiring directions.
2. Be sure the xture is grounded properly.
3. Is the photocell, if used, functioning properly?
Page 3
FFLED 120W INSTALLATION INSTRUCTIONS
Easy Answers
rabweb.com
Visit our we bsite for produc t info
Tech Help Line
Call our ex perts - 888 722-1000
e-mail
Answered promptly - sales@rabweb.com
Free Lighting Layouts
Answered o nline or by reques t
© 2017 RAB LIGHTING Inc.
Northvale, New Jersey 07647 USA
Thank you for buying RAB lighting xtures. Our goal is to design the best quality products to get the job done right. We’d like to hear your comments. Call the Marketing Department at 888-RAB-1000 or email: marketing@rabweb.com
®
GUARD INSTALLATION
(ordered separately)
Wire Guard mount with (4) #10-24 Stainless Steel Screws. Screws are provided with accessory. Line up guard with existing, pre-drilled holes in frame as shown, tighten screws. Guard, Shield and Hood may be used together.
Stainless Steel Screws (4)
POLY SHIELD INSTALLATION
(ordered separately)
Poly Shield mount with (4) #10-24 Stainless Steel Screws. Screws are provided with accessory. Line up shield with existing, pre-drilled holes in frame as shown, tighten screws. Guard, Shield and Hood may be used together.
Stainless Steel Screws (4)
GUARD/ SHIELD/ HOOD INSTALLATION
(ordered separately)
Wire Guard, Poly Shield and Hood can be mounted together with (4) #10-24 Stainless Steel Screws. Screws are provided with accessory. Line up shield, hood and guard with existing, pre-drilled holes in frame as shown, tighten screws.
Stainless Steel Screws (4)
ACCESSORIES AND REPLACEMENT PARTS
(ordered separately)
Poly Shield: GDFFLED120P Wire Guard: GDFFLED120W 5” Hood: HFFLED120-5 (Bronze)/
HFFLED120W-5 (White) 8” Hood: HFFLED120-8 (Bronze)/
HFFLED120W-8 (White) Lens & Door Replacement: LFFLED120A (Bronze)/
LFFLED120W (White)
HOOD INSTALLATION
(ordered separately)
Hood mount with (4) #10-24 Stainless Steel Screws. Screws are provided with accessory. Line up hood with existing, pre-drilled holes in frame as shown, tighten screws. Guard, Shield and Hood may be used together.
Patent - US: Pat D643,147
Note: These instructions do not cover all details or variations in equipment nor do they provide for every possible situation during installation, operation or maintenance.
FFLED120 IN 0917
Stainless Steel Screws (4)
RECEPTACLE OPTION
Units ordered with (/PCT) sux is supplied with 3 wire receptacle and 120-277V Twistlock Photocell. Units ordered with (/PCT4) is supplied with 3 wire receptacle and 480V Twistlock Photocell.
Units ordered with (/7PR) sux is supplied with 7-Pin receptacle without photocell. Brown and Orange wires from the 7-Pin receptacle are not connected and are reserved to DALI or other control systems.
Loading...