
CANVAS INSTALLATION INSTRUCTIONS
Thank you for buying RAB lighting xtures. Our goal is to design the best quality products to get the job done right. We’d like to hear your comments.
Call the Marketing Department at 888-RAB-1000 or email: marketing@rabweb.com
IMPORTANT
READ CAREFULLY BEFORE INSTALLING FIXTURE. RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE.
Fixtures must be wired in accordance with the National Electrical Code and all applicable local codes. Proper grounding is required
for safety. THIS PRODUCT MUST BE INSTALLED IN ACCORDANCE WITH THE APPLICABLE INSTALLATION CODE BY A PERSON
FAMILIAR WITH THE CONSTRUCTION AND OPERATION OF THE PRODUCT AND THE HAZARDS INVOLVED.
WARNING: Make certain power is OFF before installing or maintaining xture. No user serviceable parts inside.
SLIPFITTER MOUNTING
1. The sliptter mounting ts a 2 3/8” O.D. Tenon. Place the
sliptter over the Tenon and secure the xture with the
2 Set Screws on the side of the sliptter.
2. Remove 2 screws on side of Round Cover Plate.
Remove the Round Cover Plate and adjust the angle of
the xture.
3. Loosen the Locking Bolt and swivel xture to desired
angle.
4. Tighten the Locking Bolt and re-attach Round Cover
Plate.
Set Screws
Locking
Bolt
Tenon
Round
Cover
Plate
Close Up
Plugs (4)
TRUNNION MOUNTING
CAUTION: UL and C-UL listed or CSA certied liquid
tight cord grip suitable for use with three conductor
type STW exible cord shall be used for connection to a
wet location outlet box provided by others.
To adjust the angle of the xture using the trunnion:
1. Loosen the Pivot Bolts & angle locking screw.
2. Adjust xture to desired angle.
3. Tighten Pivot Bolts & angle locking screw.
Pivot Bolts
WIRING
Universal voltage drivers permits operation at 120V to
277VAC, 50 or 60 Hz.
1. Connect the BLACK xture lead to the (+) LINE supply
lead.
2. Connect the WHITE xture lead to the (-) COMMON
supply lead.
3. Connect the bare copper Ground wire from xture to
supply ground.
If desired, cover the screw holes with the provided Close
Up Plugs (4) on the back cover as shown above. Tap lightly
into place.

CANVAS INSTALLATION INSTRUCTIONS
Easy Installation & Product Help
Tech Help Line
Call our experts 888 RAB-1000
©2014 RAB LIGHTING Inc.
Northvale, New Jersey 07647 USA
rabweb.com
Visit our website for product info
email
Answered promptly sales@rabweb.com
Thank you for buying RAB lighting xtures. Our goal is to design the best quality products to get the job done right. We’d like to hear your comments.
Call the Marketing Department at 888-RAB-1000 or email: marketing@rabweb.com
GUARD OR SHIELD INSTALLATION
Wire Guard and Poly Shield mount with (4) #8-32
Stainless Steel Screws. Screws are provided with the
accessory. Guard and shield may be used together. See
gure 1 for Guard. See gure 2 for Shield
1. Line up guard or shield with existing pre-drilled holes in
frame as shown, tighten screws.
Stainless Steel
Figure 1
Figure 2
Screws (4)
Stainless Steel
Screws (4)
ACCESSORIES
Chrome Wire Guard: GDEZLED78W
Poly Shield: GDEZLED78P
Lens & Door Replacement: LCANVAS78 (bronze)
LCANVAS78W (white)
TROUBLESHOOTING
1. Check that the line voltage at the xture is correct. Refer
to wiring directions.
2. Is the xture grounded properly?
3. Is the photocell, if used, functioning properly?
CLEANING & MAINTENANCE
CAUTION: Be sure xture temperature is cool enough
to touch. Do not clean or maintain while xture is
energized.
1. Clean glass lens with non-abrasive glass cleaning
solution.
2. Do not open the xture to clean the LED. Do not touch
the LED.
US: pat. D679,856; MX: 40069; CA; CN; TW: pat pending;
Note: These instructions do not cover all details or variations in
equipment nor do they provide for every possible situation during
installation, operation or maintenance.
CANVAS78 6Hx4V Cool
CANVAS78N 6H x 4V Neutral CANVAS78Y 6H x 4V Warm
CANVAS-IN-1014