Quoizel TY5009AN User Manual

Page 1
6 CORPORATE PARKWAY GOOSE CREEK SC 29445 www quoizel com
..
,.
INSTRUCTION SHEET IS-TY5009 STYLE NUMBER: TY5009AN, TY5009WT
PACKAGE CONTENTS
PART
A Crossbar
B
C
D
E
F
G
H
I
J
K
L
M
DESCRIPTION
Green Ground Screw
Mounting Screw
Lock Washer
Small Hex Nut
Mounting Ball
Socket Assembly
6” Rod
12” Rod
Ceiling Canopy
Shade
Steel Collar
Socket Collar
QUANTITY
2pcs
2pcs
2pcs
2pcs
2pcs
2pcs
9pcs
9pcs
9pcs
ISSUED 07-2010
A
B
C
D
E
F
G
REVISED 2010-10-20
J
K
L
M
H
I
WARNINGS AND CAUTIONS
WARNING:
● Before beginning the installation, turn off electricity at the circuit breaker box or the main fuse box by switching off the circuit breaker or removing the fuse.
CAUTION:
● These instructions are provided for your safety. It is very important that they are read completely before the installation of your fixture. We strongly recommend that a professional electrician install the fixture.
● Disconnect fixture from the power source before replacing the bulb(s), making sure that bulb(s) had sufficient time to cool down. DO NOT subject the lamp to any shock while lit as shattering of lamp may result.
1OF5
Page 2
PREPARATION
STYLE NUMBER: TY5009AN, TY5009WT
● Before beginning installation of product, make sure all parts are present. Compare parts with package contents list and diagram above. If any part is missing or damaged, do not attempt to assemble, install or operate the product. Contact customer service for replacement part.
● Estimated Assembly Time: 30 - 45 minutes
● Tool Required forAssembly (not included): Flathead screwdriver, Phillips screwdriver, Pliers, Electrical tape, Wire cutter, Safety glasses and (9) 100W Type-A medium base bulbs
.
● Helpful Tools (not included): Wire strippers.
INSTALLATION INSTRUCTIONS
STEP 1:
a. Refer to the Bottom View, unfold the Support Arms to
proper locations.
Support Arm
Upper Tier
Bottom Tier
Bottom View
Upper Tier
Bottom Tier
2OF5
Page 3
INSTALLATION INSTRUCTIONS
STEP 2:
a. Determine the Rods to be assembled according to your
desired hanging height.
b. Pass the Supply Wires with Ground Wire through the
chosen Rods and then thread Rods and Socket Assembly together as shown. Hand-tighten until snug.
STYLE NUMBER: TY5009AN, TY5009WT
6” Rod
6” Rod
12” Rod
12” Rod
STEP 3:
a. Pass the Supply Wires with Ground Wire through the
Swivel and Ceiling Canopy.
b. Thread the Swivel onto the top end of the Upper Rod.
Hand-tighten until snug.
Coupling
Supply Wires with Ground Wire
Socket Assembly
Ceiling Canopy
Swivel
Supply Wire with Ground Wire
Upper Rod
STEP 4:
a. Screw the Mounting Screws into the Crossbar place
the Lock Washers over the Mounting Screws and thread the Hex Nuts onto the Mounting Screws as shown Secure the position of the Mounting Screws by
.
tightening the Hex Nuts against the Crossbar
b. Secure the Crossbar to the Outlet Box with Outlet Box
Screws
.
,
.
3OF5
Mounting Screw
Crossbar
Hex Nut
Lock Washer
Outlet Box
Outlet Box Screw
Page 4
INSTALLATION INSTRUCTIONS
STEP 5:
a. Locate the Ceiling Canopy onto the Crossbar and slip
the Button Stop on the end of Lanyard into the Slot on the Crossbar as shown.
STEP 6:
Use Wire Connectors (not supplied) to connect the wires.
a. Connect the House Ground Wire to the Fixture Ground
Wire.
b. Connect the House White (or Ribbed) Wire to the
Fixture Supply Wire (Black or Smooth Side).
c. Connect the House Black (or Red) Wire to the Fixture
Supply Wire (Black or Smooth Side).
d. Wrap each connection with approved electrical tape
and carefully stuff all of the connected wires into the Outlet Box.
STYLE NUMBER: TY5009AN, TY5009WT
Crossbar
Slot
Lanyard
Ceiling Canopy
WHITE OR RIBBED
FROM HOUSE
BLACK (OR RED) WIRE
FROM HOUSE
GROUND WIRE
FROM HOUSE
Button Stop
WHITE OR RIBBED
FROM FIXTURE
BLACK OR SMOOTH
FROM FIXTURE
GROUND WIRE
FROM FIXTURE
STEP 7:
a. Place the Ceiling Canopy over the Mounting Screws
and secure with the Mounting Balls. Hand-tighten until snug.
Outlet Box
Mounting
Screw
Ceiling Canopy
Mounting Ball
4OF5
Page 5
INSTALLATION INSTRUCTIONS
STYLE NUMBER: TY5009AN, TY5009WT
STEP 8:
a. Place the Shade and the Steel Collar over the Socket
as shown. Secure by threading the Socket Collar onto the Socket. Hand-tighten until snug.
STEP 9:
a. Install correct bulbs referring to fixture markings and/or labels for maximum wattage.
Socket Collar
Steel Collar
Shade
Socket
Your installation is completed now. Restore electricity. Retain this sheet for future reference.
5OF5
Loading...