
6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com
..
,.
INSTRUCTION SHEET IS-TY1504
STYLE NUMBER: TY1504AN, TY1504WT
PACKAGE CONTENTS
PART
A Crossbar
B
C
D
E
F
G
H
I
J
K
L
M
DESCRIPTION
Green Ground Screw
Mounting Screw
Lock Washer
Small Hex Nut
Mounting Ball
Steel Collar
Socket Collar
6” Rod
12” Rod with Nipple
12” Rod
Ceiling Canopy
Socket Assembly
ShadeN
QUANTITY
1pc
1pc
2pcs
2pcs
2pcs
2pcs
1pc
1pc
2pcs
1pc
1pc
1pc
1pc
1pc
ISSUED 07-2010
A
B
C
D
E
F
G
H
I
REVISED 2010-10-20
L
M
N
J
K
WARNINGS AND CAUTIONS
WARNING:
● Before beginning the installation, turn off electricity at the circuit breaker box or the main fuse box by switching
off the circuit breaker or removing the fuse.
CAUTION:
● These instructions are provided for your safety. It is very important that they are read completely before the
installation of your fixture. We strongly recommend that a professional electrician install the fixture.
● Disconnect fixture from the power source before replacing the bulb(s), making sure that bulb(s) had sufficient
time to cool down. DO NOT subject the lamp to any shock while lit as shattering of lamp may result.
PREPARATION
● Before beginning installation of product, make sure all parts are present. Compare parts with package contents
list and diagram above. If any part is missing or damaged, do not attempt to assemble, install or operate the
product. Contact customer service for replacement part.
● Estimated Assembly Time: 20 - 30 minutes
● Tool Required forAssembly (not included): Flathead screwdriver, Phillips screwdriver, Pliers, Electrical tape,
Wire cutter, Safety glasses and (1) 100W Frosted Type-A Medium Base Bulb.
● Helpful Tools (not included): Wire strippers.
1OF3

INSTALLATION INSTRUCTIONS
STEP 1:
a. Determine the Rods to be assembled according to your
desired hanging height.
b. Secure the chosen Rods and the Socket Assembly
together. Hand-tighten until snug.
STYLE NUMBER: TY1504AN, TY1504WT
6” Rod
6” Rod
12” Rod with Nipple
12” Rod
STEP 2:
a. Screw the Swivel underside of the Ceiling Canopy to
the Upper Rod. Hand-tighten until snug.
STEP 3:
a. Screw the Mounting Screws into the Crossbar place
the Lock Washers over the Mounting Screws and
thread the Hex Nuts onto the Mounting Screws as
shown Secure the position of the Mounting Screws by
.
tightening the Hex Nuts against the Crossbar
b. Secure the Crossbar to the Outlet Box with Outlet Box
Screws
.
,
.
Socket Assembly
Ceiling
Canopy
Swivel
Upper Rod
Mounting Screw
Crossbar
Hex Nut
Lock Washer
2OF3
Outlet Box
Outlet Box Screw