
Assembly Instruction Sheet #IS-TFSM1509VB
6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com
..
Quoizel, Inc.
6 Corporate Parkway
Goose Creek, SC 29445
Customer Service
Phone 631.273.2700
Fax 631.231.7102
www.quoizel.com
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal. Do not subject
glass parts to any shock while in operation or shattering may result.
Care of Tiffany Style Shade
A new tiffany lamp shade has an oil film applied to the shade that protects the tiffany shade from scratches during shipment. If the oil applied is
too heavy you can remove the excess oil film with a paper towel. Gently wipe away the excess oil.
For general cleaning of tiffany shades use a gentle lemon oil-based furniture polish applied to a soft cloth and wipe gently.
If a white powder appears on the soldered joints of the tiffany shade this is a normal oxidation process. Use a small amount of lemon oil or
mineral oil applied directly to oxidized areas and the soldered area will return to like new.
,.
For Style TFSM1509VB
ToolsRequired: Flatheadscrewdriver, Phillipsscrewdriver,pliers,wire cutters, wire strippers, electricaltape,
safetyglasses.
BulbRecommended: (1) MediumBase 100W Maximum,Alternatebulb (1) 23W CFL
EstimatedAssembly Time:20-30minutes
Preparation:Identify and inspect all partsbeforebeginning installation. Check package contentlist and diagrams
belowto be sure all partsarepresent. If any parts aremissing or damaged, do not attemptto assemble, install, or
operatethe fixture. Contact customer serviceforreplacement parts.
Package Contents
Ceiling
A
Canopy
x1
Lock Ball
B
x2
6” Rod
C
x2
STEP 1 Assemble Rods-
A. Determine the Rods (C/D) to be
assembled to the Socket
Assembly (E) according to your
hanging height.
B. Pass Supply Wires and Ground
Wire through the chosen Rods
(C/D) and then thread the
chosen Rods (C/D), Loop (E)
and Socket Assembly (F). Hand
tighten until snug.
C. Pass Supply Wires and Ground
Wire through the Ceiling
Canopy (A) and then thread the
Ceiling Canopy (A) and the
Upper Rod together. Hand
tighten until snug.
Loop
E
x1
Socket
F
Assembly
x1
12”Rod
D
x2
A
C
Figure 1
G
Shade
x1
H
Socket
Collar
x1
D
E
F
2.4mm
Hardware Contents
13Ga
QUOIZEL
GND
R
STEP 2 Install Crossbar-
A. Attach the Crossbar Assembly (AA) to the Outlet Box with the head
of the Green Ground Screw facing you. Secure it with Outlet Box
Screws (not included) Tighten until snug
..
Green Ground Screw
STEP 3 - Wire Connections
A. Use standard wire connectors (not included) to make all wire
connections. (Connectors are not included with fixture.) Strip and
prepare wire ends according to instructions supplied with
connectors.
B. Connect White Supply Wire from the Outlet Box to Ribbed side
Wire from fixture.
C. Connect Black (or Red) Supply Wire from the Outlet Box to Smooth
side Wire from fixture.
D. Connect Ground Wire from the Outlet Box to Ground Wire from
fixture.
E. Twist connectors until wires are tightly joined together.
F. Wrap each connection with approved electrical tape and carefully
stuff all the connected wires into the Outlet Box.
Crossbar Assembly
AA
x1
Outlet Box
AA
Outlet Box Screw
(not included)
Figure 2
2014 Quoizel Inc.
Need assistance with parts or assembly? Call Quoizel customer service at 1-631-273-2700
Thank you for purchasing a Quoizel product.
or visit us on-line at www.quoizel.com
1of2
March2014

White wire
from supply
Black wire from
supply (or Red)
Ground wire
from supply
Ribbed side wire
from fixture
Smooth side wire
from fixture
Ground wire
from fixture
Figure 3
STEP 4 Attach Fixture Body to Mounting Screw-
A. Place the Backplate of the Fixture Body (A) over the Mounting
Screws and secure with Lock Ball (B). Hand tighten until snug.
Mounting Screw
A
B
STEP 5 Attach Shade to fixture-
A. Place the Shade (G) over the
Socket, secure with Socket
Collar (H). Hand tighten until
sung.
STEP 6 Install Bulb-
A. This fixture uses standard bulb
with medium screw base.
Maximum 100 watts.
B. Insert bulb and screw snugly
into place.
Your fixture is now assembled
and ready to use.
Enjoy!
Figure 5
Socket
E
G
Figure 6
Socket
TFSM1509VB
FINISH: VINTAGE BRONZE
Figure 4
7” Sq.
1”
56”
OVERALL HEIGHT INCLUDES
(2) 6” AND 12” RODSAND 2 QUICK LINKS
11”
7”
5.5” Sq.
Bulb
GND
13Ga
2.4mm
QUOIZEL
R
(1) 100W
Base
(Not Supplied)
PART NUMBER
NO.
1
2014 Quoizel Inc.
Medium
Bulbs
8.5” Sq.
NOTE: ALL DIMENSIONS ARE ROUNDED UP TO THE NEAREST 1/2"
REPLACEMENT PART DESCRIPTION
REQ.
Thank you for purchasing a Quoizel product.
Need assistance with parts or assembly? Call Quoizel customer service at 1-631-273-2700
or visit us on-line at www.quoizel.com
2of2
March2014