Quoizel TF1816VB User Manual

Assembly Instruction Sheet #IS-TF1816VB
6 CORPORATE PARKWAY GOOSE CREEK SC 29445 www quoizel com
..
ToolsRequired: Flatheadscrewdriver,Phillipsscrewdriver, pliers,wirecutters, wire strippers,electricaltape, safety glasses. BulbRecommended: EstimatedAssembly Time: Preparation:
present.Ifany parts aremissingor damaged, donotattempt to assemble,install,or operate thefixture.Contact customer serviceforreplacement parts.
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal. Do not subject glass parts to any shock while in operation or shattering may result.
Care of Tiffany Style Shade
A new tiffany lamp shade has an oil film applied to the shade that protects the tiffany shade from scratches during shipment. If the oil applied is too heavy you can remove the excess oil film with a paper towel. Gently wipe away the excess oil.
For general cleaning of tiffany shades use a gentle lemon oil-based furniture polish applied to a soft cloth and wipe gently.
If a white powder appears on the soldered joints of the tiffany shade this is a normal oxidation process. Use a small amount of lemon oil or mineral oil applied directly to oxidized areas and the soldered area will return to like new.
Package Contents
Hardware Contents
BB
STEP 1 Install Crossbar-
A. AA)Attach the Crossbar ( to the Outlet Box with the head of the
Green Ground Screw facing you. Secure it with Outlet Box Screws (not included) Tighten until snug..
2014 Quoizel Inc.
,.
(4)MediumBase 100W Maximum,Alternate bulb (4)23WCFL
30-45minutes
Identifyandinspect all partsbeforebeginning installation. Checkpackagecontent list anddiagramsbelow to besureall parts are
Nipple with
C
Hex Nut x1
Shade
D
x1
Finial
E
x1
Canopy
EE
Chain Loop x1
Canopy Lock
FF
Ring x1
Fixture Chain
GG
x1
Ceiling
HH
Canopy x1
Thank you for purchasingaQuoizelproduct.
or visit us on-lineatwww.quoizel.com
Socket
A
Assembly x1
Lock Washer x2
Hex Nut
CC
x2
Long Nipple
DD
x1
Side
B
Chain x4
Crossbar
AA
x1
Need assistance with partsorassembly?CallQuoizel customer service at 1-631-273-2700
For Style TF1816VB
Outlet Box
Green Ground
STEP 2 Install Canopy
Chain Loop and Nipple
* Pliers is required for this
step.
A. Thread one Hex Nut (CC) to
one end of the Nipple (DD) until it is at least 0.25” from the end. Pass one Lock Washer (BB) over the end of the Nipple (DD) and thread the Canopy Chain Loop (EE) onto the Nipple (DD). By using pliers, thread the Hex Nut (CC) against the Canopy Chain Loop (EE) and hand tighten until snug.
B. Thread another Hex Nut
(CC) to the middle of the Nipple (DD). Place another Lock Washer (BB) over the Nipple (DD) and then thread
the Nipple (DD) into the Crossbar (AA) until the Nipple (DD) is about 0.375” above the Crossbar (AA).
C. Remove the Canopy Lock Ring (FF) from the Canopy Chain Loop
(EE). Place the Ceiling Canopy (II) over the Canopy Chain Loop (EE) against the ceiling to determine the correct position of the Nipple (DD). Thread the Canopy Lock Ring onto the Canopy Chain Loop (EE). Adjust the Nipple (DD) to allow the Ceiling Canopy (II) to rest against the ceiling when held in place by the Canopy Lock Ring (FF).
D. Remove the Canopy Lock Ring (FF) and the Ceiling Canopy (II).
Tighten the Hex Nut (CC) against the Crossbar (AA) to secure in place.
1of2
Screw
-
AA
AA
Outlet Box Screw (not included)
BB
DD
CC
EE
FF
Figure 1
Figure 2
CC
BB
Step B
Step A
II
June2014
STEP 3 - Install Fixture Chain and Ceiling Canopy
A. Adjust the Fixture Chain (GG) to your desired length by removing
the links if needed.
*
Pliers is required for this step.
B. With the Fixture Chain (GG) not attached to the Fixture Loop and the
Canopy Chain Loop (EE), pull the supply wires through the Fixture Chain (GG) alternating links. After the wires are through the Fixture Chain (GG), pull the Supply Wires and the Ground Wire through the Canopy Lock Ring (FF) and the Ceiling Canopy (HH) in order.
C. Attach one end of the Fixture Chain (GG) to the Fixture Loop . Lift
the fixture and Fixture Chain (GG) up And Attach the other end of the Fixture Chain (GG) onto the Canopy Chain Loop (EE) . The fixture will now hang safely. Close the chain loop at the Ceiling Canopy Loop (EE).
D. Feed the Supply Wires and Ground Wire through the Canopy Chain
Loop (EE) and Nipple (DD) into the Outlet Box. Cut the wires leaving
approximately 8” of wire extending from the Outlet Box. E. Refer to Step 5 for wire connections. F. Raise the Ceiling Canopy (HH) and Canopy Lock Ring (FF) up the
Fixture Chain (GG) and over the Canopy Chain Loop (EE). Tighten
the Canopy Lock Ring (FF) onto the Canopy Chain Loop (EE) until
tight.
Suggested chain length for Ceiling height :
8’ ceiling : use 4 links of chain and 2 quick links
9’ ceiling : use 14links of chain and 2 quick links
10’ ceiling : use 24 links of chain and 2 quick links
STEP 5 - Install Shade and
Bulb
A. Thread have hex nut end of
Nipple with Hex Nut (C) onto the hex coupling on the bottom of Socket Assembly (A). Hand tighten until sung.
B. Place the Shade (D) over the
nipple, secure by threading Finial (E) onto the nipple. Hand tighten until sung.
C. Place the Loop on the Side
Chain (B) onto the Hook on the side of Socket Assembly (A), the Hook on the Side Chain (B) onto the Loop inside of Shade (D).
D. This fixture uses standard
bulb with medium screw base. Maximum 100 watts.
E. Insert bulb and screw snugly
into place.
Your fixture is now assembled and ready to use. Enjoy!
TF1816VB
Bulb
Figure 5
Socket
A
C
E
Hook
Loop
B
Hook
Loop
D
Supply Wires
and Ground Wire
GG
DD
EE
HH
FF
Figure 3
Fixture Loop
STEP 4 - Wire Connections
A. Use standard wire connectors (not included) to make all wire
connections. (Connectors are not included with fixture.) Twist connectors until wires are tightly joined together. Wrap each connection with approved electrical tape and carefully stuff all the connected wires into the Outlet Box.
White wire
from supply
Black wire from supply (or Red)
Ground wire
from supply
Ribbed side wire from fixture
Smooth side wire from fixture
Ground wire from fixture
Figure 4
Thank you for purchasingaQuoizelproduct.
Need assistance with partsorassembly?CallQuoizel customer service at 1-631-273-2700
2014 Quoizel Inc.
or visit us on-lineatwww.quoizel.com
FINISH: VINTAGE BRONZE
Base
Medium
Bulbs
(4) 100W
(Not Supplied)
PART NUMBER
NO.
11816VBT
1
M052CHVB
2
3
C108FIR
4
G6019SH
2of2
5.5” Dia.
2”
76.5”OVERALL HEIGHT
2
INCLUDES 48” CHAIN()
1
7”
4
3
22.5” Dia.
NOTE: TWO LIGHTS SHOWN FOR ILLUSTRATION PURPOSES ONLY.
NOTE: ALL DIMENSIONS ARE ROUNDED UP TO THE NEAREST 1/2"
REPLACEMENT PART DESCRIPTION
BASE
CHAIN
FINIAL
SHADE
25”
REQ.
1
1
1
1
June2014
Loading...