![](/html/b0/b046/b04609516ba921aa749d792494e661432fafe249139d12564e0121943d7e520f/bg1.png)
6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com
..
,.
INSTRUCTION SHEET IS-SPH1508
STYLE NUMBER: SPH1508PN,SPH1508BN
PACKAGE CONTENTS
PART
A Crossbar
B
C
D
E
F
G
H
I
J
K
L
DESCRIPTION
Green Ground Screw
Mounting Screw
Lock Washer
Small Hex Nut
Mounting Ball
Socket Collar
6” Rod
12” Rod
Ceiling Canopy
Socket Assembly
Shade
QUANTITY
1pc
1pc
2pcs
2pcs
2pcs
2pcs
1pc
2pcs
2pcs
1pc
1pc
1pc
ISSUED 08-2010 REVISED 2012-07-13
J
A
B
C
D
E
F
G
K
L
H
I
WARNINGS AND CAUTIONS
WARNING:
● Before beginning the installation, turn off electricity at the circuit breaker box or the main fuse box by switching
off the circuit breaker or removing the fuse.
CAUTION:
● These instructions are provided for your safety. It is very important that they are read completely before the
installation of your fixture. We strongly recommend that a professional electrician install the fixture.
● Disconnect fixture from the power source before replacing the bulb(s), making sure that bulb(s) had sufficient
time to cool down. DO NOT subject the lamp to any shock while lit as shattering of lamp may result.
PREPARATION
● Before beginning installation of product, make sure all parts are present. Compare parts with package contents
list and diagram above. If any part is missing or damaged, do not attempt to assemble, install or operate the
product. Contact customer service for replacement part.
● Estimated Assembly Time: 20 - 30 minutes
● Tool Required for Assembly (not included): Flathead screwdriver, Phillips screwdriver, Pliers, Electrical tape,
Wire cutter, Safety glasses and (1) 100W A19 Medium Base Bulb.
● Helpful Tools (not included): Wire strippers.
1OF3
![](/html/b0/b046/b04609516ba921aa749d792494e661432fafe249139d12564e0121943d7e520f/bg2.png)
INSTALLATION INSTRUCTIONS
STEP 1:
a. Determine the Rods to be assembled according to your
desired hanging height.
b. Pass the Supply Wires with Ground Wire through the
chosen Rods and then thread the Rods and Socket
Assembly together as shown. Hand-tighten until snug.
STYLE NUMBER: SPH1508PN,SPH1508BN
6” Rod
6” Rod
12” Rod
12” Rod
Supply Wires with
Ground Wire
STEP 2:
a. Pass the Supply Wires with Ground Wire through the
Swivel and Ceiling Canopy.
b Thread the Swivel onto the top end of the Upper Rod
.
and hand-tighten until snug.
STEP 3:
a. Screw the Mounting Screws into the Crossbar place
the Lock Washers over the Mounting Screws and
thread the Hex Nuts onto the Mounting Screws as
shown Secure the position of the Mounting Screws by
.
tightening the Hex Nuts against the Crossbar
b. Secure the Crossbar to the Outlet Box with Outlet Box
Screws
.
,
.
Socket Assembly
Ceiling Canopy
Swivel
Supply Wire with
Ground Wire
Upper Rod
Mounting Screw
Crossbar
Hex Nut
Lock Washer
2OF3
Outlet Box
Outlet Box Screw