Assembly Instruction Sheet #IS-QF1402
6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com
..
ToolsRequired: Flatheadscrewdriver,Phillipsscrewdriver, pliers,wirecutters, wire strippers,electricaltape, safety glasses.
BulbRecommended:
EstimatedAssembly Time:
Preparation:
present.Ifany parts aremissingor damaged, donotattempt to assemble,install,or operate thefixture.Contact customer serviceforreplacement
parts.
Warnings and Cautions
Turn off electricity at circuit breaker or main fuse box before installation. Consult a licensed electrician if in doubt.
These instructions are provided for your safety. It is very important you read them completely before installing the fixture. We strongly
recommend that a licensed, professional electrician perform the installation.
Disconnect fixture from power source before replacing bulbs. Make sure bulbs are given sufficient time to cool before removal. Do not subject
glass parts to any shock while in operation or shattering may result.
,.
(4)CandelabraBase 60W Maximum.
30-45minutes
Identifyandinspect all partsbeforebeginning installation. Checkpackagecontent list anddiagramsbelow to besureall parts are
For Style QF1402CMU and QF1402CBN
Package Contents
Fixture
Loop
A
x1
Hardware Contents
Crossbar
AA
x1
Lock Washer
BB
x2
Hex Nut
CC
x2
Nipple
DD
x1
STEP 1 Install Crossbar-
A. AA)Attach the Crossbar ( to the Outlet Box with the head of the
Green Ground Screw facing you. Secure it with Outlet Box Screws
(not included) Tighten until snug..
Green Ground
Screw
EE
FF
GG
HH
Outlet Box
AA
Outlet Box Screw
(not included)
Fixture
Body
B
x1
Canopy
Chain Loop
x1
Canopy Lock
Ring
x1
Fixture Chain
x1
Quick Link
x2
Ceiling
II
Canopy
x1
Figure 1
another Lock Washer (BB) over the Nipple (DD) and then thread the
Nipple (DD) into the Crossbar (AA) until the Nipple (DD) is about
0.375” above the Crossbar (AA).
C. Remove the Canopy Lock Ring (FF) from the Canopy Chain Loop
(EE). Place the Ceiling Canopy (II) over the Canopy Chain Loop (EE)
against the ceiling to determine the correct position of the Nipple
(DD). Thread the Canopy Lock Ring onto the Canopy Chain Loop
(EE). Adjust the Nipple (DD) to allow the Ceiling Canopy (II) to rest
against the ceiling when held in place by the Canopy Lock Ring (FF).
D. Remove the Canopy Lock Ring (FF) and the Ceiling Canopy (II).
Tighten the Hex Nut (CC) against the Crossbar (AA) to secure in
place.
AA
Figure 2
STEP 3 Install Fixture Loop to
A. Unfold support arms on fixture
B. Thread Fixture Loop (A) on to the
-
Fixture Body
assembly to proper locations.
Nipple on the top of Fixture Body
(B). Tighten until snug.
BB
DD
CC
EE
FF
Nipple
CC
BB
Step B
Step A
II
A
B
STEP 2 Install Canopy Chain Loop and Nipple-
* Pliers is required for this step.
A. Thread one Hex Nut (CC) to one end of the Nipple (DD) until it is at
least 0.25” from the end. Pass one Lock Washer (BB) over the end of
the Nipple (DD) and thread the Canopy Chain Loop (EE) onto the
Nipple (DD). By using pliers, thread the Hex Nut (CC) against the
Canopy Chain Loop (EE) and hand tighten until snug.
B. Thread another Hex Nut (CC) to the middle of the Nipple (DD). Place
Need assistance with partsorassembly?CallQuoizel customer service at 1-631-273-2700
2014 Quoizel Inc.
Thank you for purchasingaQuoizelproduct.
or visit us on-lineatwww.quoizel.com
Figure 3
August2014
1of2
STEP 4 - Install Fixture Chain and Ceiling Canopy
STEP 6 - Install Bulb
A. Adjust the Fixture Chain (GG) to your desired length by removing
the links if needed.
*
Pliers is required for this step.
B. With the Fixture Chain (GG) not attached to the Fixture Loop (A) and
the Canopy Chain Loop (EE), pull the supply wires through the
Fixture Chain (GG) alternating links.After the wires are through the
Fixture Chain (GG), pull the Supply Wires and the Ground Wire
through the Canopy Lock Ring (FF) and the Ceiling Canopy (II) in
order.
C. Attach one end of the Fixture Chain (GG) to the Fixture Loop (A) with
one Quick Link (HH). Lift the fixture and Fixture Chain (GG) up And
Attach the other end of the Fixture Chain (GG) onto the Canopy
Chain Loop (EE) with another Quick Link (HH). The fixture will now
hang safely. Close the chain loop at the Ceiling Canopy Loop (EE).
D. Feed the Supply Wires and Ground Wire through the Canopy Chain
Loop (EE) and Nipple (DD) into the Outlet Box. Cut the wires leaving
approximately 8” of wire extending from the Outlet Box.
E. Refer to Step 5 for wire connections.
F. Raise the Ceiling Canopy (II) and Canopy Lock Ring (FF) up the
Fixture Chain (GG) and over the Canopy Chain Loop (EE). Tighten
the Canopy Lock Ring (FF) onto the Canopy Chain Loop (EE) until
tight.
Suggested chain length for Ceiling height :
8’ ceiling : use 1 links of chain and 2 quick links
9’ ceiling : use 11 links of chain and 2 quick links
10’ ceiling : use 21 links of chain and 2 quick links
Supply Wires
and Ground Wire
DD
EE
A. This fixture uses candelabra
bulb with standard screw
base. Maximum 60 watts.
B. Insert bulb and screw snugly
into place.
Your fixture is now assembled
and ready to use. Enjoy!
QF1402CMU/QF1402CBN
FINISH: MUSEUM BRONZE
BRUSHED NICKEL
Figure 6
5.5” Dia.
1
Bulb
Socket
1.5”
129.5”OVERALL HEIGHT
INCLUDES 96” CHAIN
AND 2 QUICK LINKS()
HH
GG
II
FF
HH
Figure 4
A
STEP 5 - Wire Connections
A. Use standard wire connectors (not included) to make all wire
connections. (Connectors are not included with fixture.) Twist
connectors until wires are tightly joined together. Wrap each
connection with approved electrical tape and carefully stuff all the
connected wires into the Outlet Box.
White wire
from supply
Black wire from
supply (or Red)
Ground wire
from supply
Figure 5
Ribbed side wire
from fixture
Smooth side wire
from fixture
Ground wire
from fixture
16.5”Dia.
NOTE: TWO LIGHTS SHOWN FOR
(4) 60W Candelabra
NO.
1
1 M381CHBN CHAIN 1
Bulbs
Base
(Not Supplied)
PART NUMBER
M2378CHMU CHAIN 1
ILLUSTRATION PURPOSES ONLY.
NOTE: ALL DIMENSIONS ARE ROUNDED
UP TO THE NEAREST 1/2"
REPLACEMENT
REQ.
29”
STYLE NUMBER
QF1402CMU
QF1402CBN
2014 Quoizel Inc.
Need assistance with partsorassembly?CallQuoizel customer service at 1-631-273-2700
Thank you for purchasingaQuoizelproduct.
or visit us on-lineatwww.quoizel.com
2of2
August2014