Quoizel MY5103ML User Manual

6 CORPORATE PARKWAY GOOSE CREEK SC 29445 www quoizel com
..
CROSSBAR
LOCK WASHER A
LOCK NUT A
LOCK NUT B
LOCK WASHER B
FIXTURE CHAIN
,.
OUTLET BOX
HOUSE SUPPLY and GROUND WIRES
OUTLET BOX SCREWS
not supplied()
CANOPY CHAIN LOOP
FIXTURE SUPPLY and GROUND WIRE
ASSEMBLY / INSTALLATION INSTRUCTIONS
1 Before beginning the installation carefully unpack and
.
identify all parts referring to the illustration
2 Turn power to the installation point OFF at circuit breaker
..
3 Unfold the SUPPORTARMS to the properlocations.
.
,.
Locate the SCROLL PART onto thetop end of the JUNCTION BOX and makethe hole on the bottom of it over the nipple onthe top center of the JUNCTION BOX. Thread the FIXTURE LOOPonto the nipple andhand tighten until snug tosecure them.
4. Fasten the CROSSBAR tothe OUTLET BOX with (2)OUTLET BOX SCREWS(not supplied). Proceed to
thread LOCK NUT A and LOCK WASHER A onto the top end ofNIPPLE. Thread NIPPLE into the center of CROSSBAR. Locate the LOCK NUT B ontothe bottom end of the NIPPLE. Tighten LOCK NUTA against CROSSBAR with plier until snug.
,
FIXTURE LOOP
JUNCTION BOX
CEILING CANOPY
CANOPY LOCK RING
FIXTURE SUPPLY and GROUND WIRE
SCROLL PART
SUPPORTARM
5. Locate the FIXTURECHAIN and determine desired hanging height of fixture.Adjust chain by removing links if needed. Please note thatdepending on chain material thickness, you might berequired to use chain pliers to spread links open. Proceedto attach one end of chain to FIXTURE LOOP, attached to topof fixture. Pass the fixture wires through FIXTURECHAIN alternating links. Proceed to pass thefixture wires through the following mounting components in thisorder: 1)CANOPY LOCK RING; 2)CEILING CANOPY 3 CANOPY CHAIN LOOP 4 LOCK WASHER B and LOCK NUT B 5 NIPPLE
););
6 LOCK NUT A and LOCKWASHER A
).
6.
Making the connections:
;) ;
(2 people recommended forthe remaining steps) Position the fixture under theceiling mounted outlet box. Pass LOCK WASHER B over theNIPPLE.Thread CANOPY CHAIN LOOP onto NIPPLE. Thread LOCK NUTB down the NIPPLE, againstthe CANOPY CHAIN LOOP and snug with pliers. Pass the wires through the NIPPLE. Take up wire slack andtrim wires so thatapprox. 6” will remain
inside outlet box. Proceed to attach thetop of the FIXTURE
CHAIN to the bottomof the CANOPYCHAIN LOOP.
Using wire connectors (not supplied) connect the
HOUSE GROUND WIRE to theFIXTURE GROUND
WIRE connect the HOUSE WHITE WIRE to the
;
FIXTURE SUPPLY WIRE (WHITE or RIBBED SIDE); connect the HOUSE BLACK(or RED) WIRE to the FIXTURE SUPPLY WIRE(BLACK or SMOOTH SIDE). Wrap each connection with approved electrical tape.
SOCKET
SHADE
STEEL COLLAR
SOCKET COLLAR
IF IN DOUBT ABOUT ELECTRICAL INSTALLATION, CONSULT A LICENSED ELECTRICIAN!
7. With the properconnections made, proceed to push the CEILING CANOPY upward over the OUTLET BOX. Be
sure that all wiresare carefully tucked into the OUTLET BOX cavity. Secure canopy against ceiling by threading CANOPY LOCK RING onto the CANOPY LOOP.Tighten until snug.
8. Position the SHADEand the STEEL COLLAR overthe SOCKET as shown. Secure them by threading the SOCKET COLLAR onto the SOCKET.Hand tighten until snug.
9.Install the correct bulbsreferring to fixture marking and/or labels for maximum wattage.
10 Restore power to theinstallation point ON. Retain this
.
sheet for future reference.
REVISED 2011-07-22
IS-MY5103
Loading...