6 CORPORATE PARKWAY
GOOSE CREEK SC 29445
www quoizel com
..
CROSSBAR
LOCK WASHER A
LOCK NUT A
LOCK NUT B
LOCK WASHER B
FIXTURE CHAIN
FIXTURE LOOP
LOCK SCREW
HANGER
DECORATION
CRYSTAL
IF IN DOUBT ABOUT ELECTRICAL INSTALLATION,
CONSULT A LICENSED ELECTRICIAN!
ARM
JUNCTION BOX
SCROLLED PART
,.
NIPPLE
FINIAL
OUTLET BOX
HOUSE SUPPLY and
GROUND WIRES
OUTLET BOX SCREWS
not supplied()
NIPPLE
CANOPY CHAIN LOOP
FIXTURE SUPPLY
and GROUND WIRE
CEILING CANOPY
CANOPY LOCK RING
FIXTURE SUPPLY
and GROUND WIRE
CENTER
COLUMN
CAP
SOCKET
SPACER
TUBE
HEX
COUPLING
SUPPORT
ARM
CANDLE
COVER
SMALL TUBE
CRYSTAL
ASSEMBLY / INSTALLATION INSTRUCTIONS
1 Before beginning the installation carefully unpack
.
and identify all parts referring to the illustration
2 Turn power to the installation point OFF at circuit
.
breaker
3 Unfold the SUPPORT ARMS to the proper locations
..
.
,.
Position the SPACER TUBE over the HEX
COUPLING on the top end of the JUNCTION BOX
assembly and then thread the nipple on the end of
the CENTER COLUMN onto the HEX COUPLING
Hand tighten until snug Please make sure the
.
mounting holes on the side of the CENTER
COLUMN line up the mounting holes on the side of
the JUNCTION BOX assembly
4 Locate the DECORATIVE ARMS Match the holes
..
on them with the mounting holes on the side of the
CENTER COLUMN and JUNCTION BOX assembly
Secure them by threading the LOCK SCREWS into
the mounting holes Hand tighten until snug
5 Thread the FIXTURE LOOP onto the nipple on the
.
..
top end of the CENTER COLUMN and tighten until
snug
.
6 Fasten the CROSSBAR to the OUTLET BOX with
.
(2)OUTLET BOX SCREWS(not supplied). Proceed
to thread LOCK NUT A and LOCK WASHER A onto
the top end of NIPPLE. Thread NIPPLE into the
center of CROSSBAR. Locate the LOCK NUT B onto
the bottom end of the NIPPLE. TightenLOCKNUTA
against CROSSBAR with plier until snug.
7. Locate the FIXTURE CHAIN and determine desired
hanging height of fixture. Adjust chain by removing
links if needed. Please note that depending on chain
material thickness, you might be required to use
chain pliers to spread links open. Proceed to attach
one end of chain to FIXTURE LOOP, attached to top
of fixture. Pass the fixture wires through FIXTURE
CHAIN alternating links. Proceed to pass the fixture
wires through the following mounting components
in this order: 1)CANOPY LOCK RING; 2)CEILING
CANOPY 3 CANOPY CHAIN LOOP 4 LOCK
;) ;)
WASHERB and LOCK NUT B 5 NIPPLE 6 LOCK
NUT A andLOCKWASHER A
8.
Making the connections:
(2 people recommended for the remaining steps)
Position the fixture under the ceiling mounted outlet
box. Pass LOCK WASHERBovertheNIPPLE.
Thread CANOPY CHAIN LOOPontoNIPPLE. Thread
LOCK NUT B down the NIPPLE, against the CANOPY
CHAIN LOOP and snug with pliers. Pass the wires
through the NIPPLE. Take up wire slack andtrimwires
so that approx. 6” will remain inside outlet box.
Proceed to attach the top of the FIXTURE CHAIN to
the bottom of the CANOPY CHAIN LOOP.
Using wire connectors (not supplied) connect the
HOUSE GROUND WIRE to the FIXTURE GROUND
WIRE connectthe HOUSE WHITE WIRE tothe
;
FIXTURE SUPPLY WIRE (WHITE or RIBBED SIDE);
connect the HOUSE BLACK (or RED) WIRE to the
FIXTURE SUPPLY WIRE(BLACK or SMOOTH SIDE).
Wrap each connection with approved electrical tape.
9. With the proper connections made, proceed to push
the CEILING CANOPY upward over the OUTLET
BOX. Be sure that all wires are carefully tucked into
the OUTLET BOX cavity. Secure canopy against
ceiling by threading CANOPY LOCK RING onto the
CANOPY LOOP. Tighten until snug.
10 Thread the NIPPLE into the mounting hole on the
.
bottom center of the JUNCTION BOX Hand tighten
until snug Proceed to locate the SCROLLED PART
.,
SMALL TUBE over the end of the NIPPLE in turn
and secure with the FINIAL Hand tighten until snug
11 Position the CRYSTALS onto the hangers on the
.
FINIAL SCROLLED PART SUPPORT ARMS and
,,
DECORATIVE ARMS as shown
there are two kinds of CRYSTALS
12.Position the CANDLE COVER over the SOCKET as
shown Put the CAPS onto the top end of the
.
CANDLE COVER Install the correct bulbs referring to
.
the maximum wattage affixed to the fixture.
13 Restore power to the installation point ON. Retain
.
this sheet for future reference.
,
.
;) ; )
.
.
..
.
Please note that
.
.
.
IS-MQ5006
Revised 2007-08-30