Quoizel IE1508BN User Manual

6 CORPORATE PARKWAY GOOSE CREEK SC 29445 www quoizel com
..
,.
INSTRUCTION SHEET IS IE1508­STYLE NUMBER IE1508BN:
PACKAGE CONTENTS
A
B
C
D
E
F
G
H
I
J
K L
Hex Nut (for Mounting Screw)
Description
Crossbar
Green Ground Screw
Mounting Screw
Lock Washer
Mounting Ball
Shade
Socket Collar
Ceiling Canopy
6” Rod
12” Rod
Socket Assembly
Quantity
1pc
1pc
2pcs
2pcs
2pcs
2pcs
1pc
1pc
1pc
2pcs
2pcs
1pc
ISSUED 06-2008 Revised 2008 08 26--
A
B
C
D
E
F
G
I
J
K
!
WARNINGSAND CAUTIONS
H
L
WARNING:
● Before beginning the installation, turn off electricity at the circuit breaker box or the main fuse box by switching off the circuit breaker or removing the fuse. CAUTIONS:
● These instructions are provided for your safety. It is very important that they are read completely before the installation of your fixture. We strongly recommend that a professional electrician install the fixture.
● Disconnect fixture from the power source before replacing the bulb(s), making sure the bulb(s) had sufficient time to cool down. DO NOT subject the lamp to any shock while lit as shattering of lamp may result.
PREPARATION
● Before beginning installation of product, make sure all parts are present. Compare parts with package contents list and diagram above. If any part is missing or damaged, do not attempt to assemble, install or operate the product. Contact customer service for replacement part.
● Estimated Assembly Time: 10 20 minutes
● Tools Required for Assembly (not included): Flathead screwdriver Phillips screwdriver, pliers, electrical tape, wire cutters, safety glasses &1, 100 Watt, Type A Medium Base Bulb.
● Helpful Tools (not included): Wire Strippers.
­,
-
1OF3
ASSEMBLY INSTRUCTIONS
STEP 1:
a Determine the Rods to be assembled according to
.
your desired hanging height.
b Pass the Supply Wires with Ground Wire through
.
the chosen Rods and then thread Rods and Socket Assembly together as shown. Tighten until snug.
STYLE NUMBER IE1508BN:
12” Rod
12” Rod
6” Rod
6” Rod
Supply Wires with Ground Wire
Socket Assembly
STEP 2:
a Pass the Supply Wires with Ground Wire through
.
the Swivel and Ceiling Canopy.
b Thread the Swivel onto the top end of the Upper
.
Rod and hand tighten until snug.
STEP 3:
a Screw the Mounting Screws into the Crossbar
.,
Mounting Screw
place the Lock Washers over the Mounting Screws and thread the Hex Nuts onto the Mounting Screws as shown Secure the position of the Mounting
.
Screws by tightening the Hex Nuts against the Crossbar
b Secure the Crossbar to the Outlet Box with Outlet
.
Box Screws
.
.
Swivel
Supply Wire with Ground Wire
Upper Rod
Crossbar
Ceiling Canopy
Hex Nut
Lock Washer
2OF3
Outlet Box
Outlet Box Screw
Loading...
+ 1 hidden pages