Quoizel GE5103SE User Manual

6 CORPORATE PARK WAY GOOSE C RE EK ,S C. 2944 5 www. qu oizel . com
ASSEMBLY / IN STAL LATI ON INS TRUC TION S
1.Before beginning the installation,carefully unpack and identify all parts, referring to the illustration(FIGURE 1).
2.Turn power to the installation point OFF at circuit br eaker .
CROSSBAR
SHAKE PROOF WAS HE R A
LOCK NUT A
NIPPLE
LOCK NUT B
SHAKE PROOF WAS HE R B
FIXTURE CHAIN
HEX COUPLING
CENTER STEM
FI GURE 1
OUTLET BOX
HOUSE SUPPLY and GROUND WIRES
OUTLET BOX SCREWS (not supplied)
GREEN GROUND SCREW
CANOPY CHAIN LOOP
FIXTURE SUPPLY and GROUND WIRE
CEILING CANOPY
CANOPY LOCK RING
FIXTURE SUPPLY and GROUND WIRE
FIXTURE LOOP
FIXTURE CANOPY
KNOB
FIXTURE COVER
ROD
SMALL LOOP
JUNCTION BODY
SHADE HOLDER
SOCKET
3.Thread the end of CE NT ER STEM onto nipple on top center
of JUN CT ION BOD Y. Ha nd tighten until snug. Locate top ends of RO DS through the holes on the side of FIXTURE COVER and thread KNO BS onto the top ends.
4.Thread the nipple in the bottom center of FIXTUR E CANO PY into HEX COUP LING in the center of FIX TURE COVER. Hand tighten until snug. Then thread FIXTUR E LOO P onto the nipple on the top center of FIXTURE CANO PY and tighten until snug.
5.Thread FINI AL wi th NIPPLE into mounting hole on the bottom center of JUN CT ION BOX . Ha nd tighten until snug.
Proceed to thread ends of RO DS into SMALL LOO PS and tighten until snug.
6.Fasten the CR OS SBAR to the OU TLET BOX with (2)OU TLET
BOX SCREWS( not supplied). Proceed to thread LOCK NUT A and SHAKE PRO OF WASHE R A onto the top end of NI P PLE. Thread NIPPLE into the center of CR OSSBAR. Locate the LOC K NUT B onto the bottom end of the NI PPLE. Tighten LOC K NUT A against CROSSBAR with plier until snug.
7. Locate the FIXTUR E CH AIN and determine desired hanging
height of fixture. Adjust chain by remo ving links if needed. Please note that depending on chain ma terial thickness, you might be required to use chain pliers to spread links open. Proceed to attach one end of chain to FIXTUR E LOO P, attached to top of fixture. Pass the fixture wi res thr ough FI XTUR E CHAIN alternating links. Proceed to pass the fixture wi res through the following mo unting comp onents in this order:
1)CA NO PY LOC K RING ; 2)CE ILING CA NO PY;3)CANO PY CHAIN LOOP;4)SHA KE PRO OF WASHER B and HE X NU T B;5)NI PPLE;6)HEX NUT A and SHAKE PRO OF A.
8. Ma king the connections:(2 people recomme nded for the
rema ining steps) Position the fixture under the ceiling mounted outlet box. Pass SHA KE PRO OF WASHER B over the NI PPLE. Thread CANO PY CHAIN LOOP onto NI PPLE. Thread LOCK NUT B down the NIPPLE, against the CA NO PY CH AIN LOO P and snug with pliers. Pass the wi res through the NI PPLE. Take up wi re slack and trim wires so that approx. 6” will remain inside outlet box. Proceed to attach the top of the FI XTUR E CH AI N to the bottom of the CANO PY CHAIN LOOP. Using wi re connectors(not supplied) connect the HO US E GROU ND WIRE
to the FIXTUR E GR OU ND WI RE;connect the HO USE WHI TE WI RE to the FIXTURE SUP PLY WI RE (WHI TE or RIBBED SIDE ); connect the HOUSE BLACK (or RED) WI RE to the FIXTUR E SUP PLY WI RE (BLACK or SMOO TH SIDE ). Wrap each connection wi th approved electrical tape.
FINIAL with N IP PL E
SHADE
SOCKET COLLAR
IF IN DOUBT ABOUT ELECTRICAL INSTALLATION, CONSULT A LICENSED ELECTRICIAN!
IS-GE 51 03
12.05
9. Wi th the proper connections made, proceed to push the
CEILING CA NOPY upward over the OU TLET BOX . Be sure that all wi res are carefully tucked into the OU TLET BOX cavity. Secure canopy against ceiling by threading CA NOPY LOC K RING onto the CANOPY LOO P. Tighten until snug.
10.Locate SHA DE over SOC KET onto SHA DE HO LDE R. Secure by threading SOCKET CO LLAR onto SOCKET and tighten until snug.Install bulbs referring to fixture mark ings
and/or labels for ma ximu m wattage.
11.Restore power to the installation point ON. Retain this sheet for future reference.
Loading...