Quoizel BRB2822K User Manual

6 CORPORATE PARKWAY GOOSE CREEK SC 29445 www quoizel com
..
,.
INSTRUCTION SHEET IS-BRB2822 STYLE NUMBER: BRB2822K
PACKAGE CONTENTS
PART
A Crossbar
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
DESCRIPTION
Green Ground Screw
Mounting Screw
Lock Washer
Small Hex Nut
Mounting Ball
Rubber Washer
Flat Washer
1/8 IP Hex Nut
Finial
Center Stem Assembly
6” Rod
12” Rod
Finial
Ceiling Canopy
Shade with Sockets
Diffuser
QUANTITY
2pcs
2pcs
2pcs
2pcs
2pcs
2pcs
2pcs
ISSUED 07-2010
A
O
B
C
D
E
F
G
H
I
J
K
P
Q
L
M
WARNINGS AND CAUTIONS
WARNING:
● Before beginning the installation, turn off electricity at the circuit breaker box or the main fuse box by switching off the circuit breaker or removing the fuse.
CAUTION:
● These instructions are provided for your safety. It is very important that they are read completely before the installation of your fixture. We strongly recommend that a professional electrician install the fixture.
● Disconnect fixture from the power source before replacing the bulb(s), making sure that bulb(s) had sufficient time to cool down. DO NOT subject the lamp to any shock while lit as shattering of lamp may result.
1OF4
PREPARATION
STYLE NUMBER: BRB2822K
● Before beginning installation of product, make sure all parts are present. Compare parts with package contents list and diagram above. If any part is missing or damaged, do not attempt to assemble, install or operate the product. Contact customer service for replacement part.
● Estimated Assembly Time: 20 - 30 minutes
● Tool Required for Assembly (not included): Flathead screwdriver, Phillips screwdriver, Pliers, Electrical tape, Wire cutter, Safety glasses and (4) 100W A19 medium base bulbs
.
● Helpful Tools (not included): Wire strippers.
INSTALLATION INSTRUCTIONS
STEP 1:
a. Determine the Rods to be assembled according to your
desired hanging height.
b. Pass the Supply Wires with Ground Wire through the
chosen Rods and then thread Rods and Shade with Sockets together as shown. Hand-tighten until snug.
6” Rod
6” Rod
STEP 2:
a. Pass the Supply Wires with Ground Wire through the
Swivel and Ceiling Canopy.
b. Thread the Swivel onto the top end of the Upper Rod.
Hand-tighten until snug.
12” Rod
Coupling
12” Rod
Supply Wires with Ground Wire
Shade with Sockets
Ceiling Canopy
Swivel
2OF4
Supply Wire with Ground Wire
Upper Rod
Loading...
+ 2 hidden pages