Unpacking Instructions
Introduction....................................................................................................3
Selecting an Installation Location ...................................................... .........5
Floor Clearance .......................................................................................6
Floor Strength and Inclination........ ......................................................6
Overhead Clearance...............................................................................6
Power and Grounding ...........................................................................6
Power Inlet .................................................... ......... ...........................7
Rack Current Rating Consideration ..............................................7
Grounding.........................................................................................7
0
Temperature......................................................................................7
Environmental Requirements...............................................................7
Unpacking the Library................................................................ ......... .........8
Unloading Space Requirements............ ......................................................9
Uncrating the Library .................................................................................10
Installing the Slide Assembly in the Rack................................................13
Verifying the Rack Requirements.......................................................13
Rack Current Rating Consideration ............................................13
Grounding.......................................................................................14
Temperature....................................................................................14
Determining the Mounting Position..................................................14
Installing the Slide Assembly in the Rack.........................................15
1
ATL P1000 Series Library Unpacking Instructions Document 6221100-02, Ver. 2, Rel. 0 March 1999
Adjusting the Slide Assembly ............................................................ 17
Adjusting the Slide Assembly on the Mounting Brackets....... 17
Adjusting the Slide Assembly Tray on the Slide Rails.............19
Removing the Library from the Pallet.....................................................22
Removing a Stand-alone Library from the Pallet............................22
Removing a Rack-mount Library from the Pallet ...........................24
Removing the Internal Packing Materials...............................................28
Opening the Doors...............................................................................28
Removing the Load and Bulk Packs ..................................................28
Removing the Shipping Restraint......................................................29
Packaging the Library for Reshipment....................................................31
2
ATL P1000 Series Library Unpacking Instructions
Document 6221100-02, Ver. 2, Rel. 0
March 1999
Figure 1 ATL P1000 Series Library , Stand-alone Configuration

Introduction

The ATL P1000 Series is an automated tape l ibrary co nsisting of up to 4 tape drives and 30 DLT™ cartridges.
This document explains how to unpack the A TL P1000 Series. Once the library is unpacked and moved to the desired installation location, set up the library using the instructions in the ATL P1000 Series Library User’s Guide.
The P1000 library is shipped in either a stand-alone (see figure 1) or rack-mount configuration (see figure 2). The stand-alone P1000 is set on casters. The rack-mount P1000 comes with a s lide tray ass embl y for installation in a rack.
Note: A rack is not provided with the rack- mount P10 00; it mus t be obtained
separately.
Window
0
Key lock
Touch screen
graphical user
interface (GUI)
Bulk pack door
Load pack door
Power switch
Load port
Introduction 3
ATL P1000 Series Library Unpacking Instructions Document 6221100-02, Ver. 2, Rel. 0 March 1999
Figure 2 ATL P1000 Series Library , Rack-mount Configuration
Rack (not included)
Key lock
Bulk pack door
GUI
Load pack door
Power switch
Load port
4 Introduction
ATL P1000 Series Library Unpacking Instructions
Document 6221100-02, Ver. 2, Rel. 0
March 1999

Floor Space

Figure 3 Floor Space Requirements, Stand­alone Library

Selecting an Installation Location

2
When selecting an installation site for the ATL P1000 Series, consider the following requirements:
floor space floor clearance floor strength and inclination power and grounding environmental conditions
These requirements are also described in the ATL P1000 Series Library User’s Guide.
2
Figure 3 shows the floor space requirements of the stand-alone P1000.
17.5 in. (45 cm)
24 in. (61 cm)
29.5 in. (75 cm)
Library FrontBack
54 in. (137.2 cm)
Selecting an Installation Locat ion 5
ATL P1000 Series Library Unpacking Instructions Document 6221100-02, Ver. 2, Rel. 0 March 1999
Figure 4 shows the floor space requirements for the rack-mount P1000.
Figure 4 Floor Space Requirements, Rack-mount Library
24 in. (61 cm)
24 in.
(61 cm)
each side
Front
17.5 in. (45 cm)

Floor Clearance

Floor Strength and Inclination

Library
Back
4
The stand-alone P1000 has a floor clearance of 0.75 in. (1.9 cm). Place
19-inch rack
(extended from rack)
30 in. (76.2 cm)
24 in.
(61 cm)
the library on a level, uncarpeted floor free of defects.
The floor at the installation site must be rated at 250 lb/ft2 (1221 kg/
4
2
m
). This is sufficient to support a fully loaded P1000 on the floor or in
a rack. The floor at the installation site must be level to within 0.25 in (6.4 mm)
over a 6 ft by 6 ft (1.8 m by 1.8 m) area.

Overhead Clearance

4
To remove the P1000 enc losure, there must be a minimum clearance of 24 in. (61 cm) above the library. When combined with the height of the library (21 in./53 cm), this is a total of 45 in. (114.5 cm) from the floor (stand-alone library) or bottom of the slide (rack-mount library).

Power and Grounding

4
The library auto-ranging power supply accepts single-phase, 90 VAC to 264 VAC input power at 47 Hz to 63 Hz.
6 Selecting an Installation Location
ATL P1000 Series Library Unpacking Instructions
Document 6221100-02, Ver. 2, Rel. 0
March 1999
Figure 5 AC Power Receptacle

Power Inlet

The power inlet is an IEC-320 connector (see figure 5). For international applications, replace the power cord with a harmonized 3x1.0 mm

Rack Current Rating Consideration

2
power cord approved by the country where used.
Ground
~100V to 120V / ~200V to 240V 6A/3A 50Hz/60Hz IEC-320 Type
NeutralLine
Consider the current rating of the rack before instal ling more than one P1000 library. The P1000 library is rated 6A/3A (120V/230V). This means that no more than two libraries can be installed in a typical 15A/120V rack.
If other equipment is installed in the rack, determine the total current rating of all the equipment before adding the P1000 library to the rack.
4
5

Environmental Requirements

Grounding

5
The P1000 must be connected to a grounded power outlet. If the library is rack-mounted, the rack must also be grounded.

T e mperature

5
The rack temperature should be less than 90qF (32qC).
The installation site (stand-alone library) or the interior of the rack
5
(rack-mount library) must meet the following environmental requirements:
humidity: 20% to 80%, non-condensing temperature: 59qF to 90qF (15qC to 32qC) altitude: sea level to 10,000 feet (3,033 meters)
Selecting an Installation Locat ion 7
ATL P1000 Series Library Unpacking Instructions Document 6221100-02, Ver. 2, Rel. 0 March 1999

Unpacking the Library

The P1000 unpacking procedure consists of the following steps: receiving the library from the shipper (see “Unloading Space
Requirements” on page 9)
uncrating the library (see “Uncrating the Library” on page 10) installing the slide assembly in the rack (rack-mount library only)
(see “Installing the Slide Assembly in the Rack” on page 13)
removing the library from the pallet (see “Removing the Library
from the Pallet” on page 22)
removing the internal packing materials from the library (see
“Removing the Internal Packing Materials” on page 28)
The following sections detail each of these steps.
Note: Before performing the procedures in the following sections, ma ke sure
the site you have chosen for the installation meets the requirements listed in “Selecting an Installation Location” on page 5.
5
8 Unpacking the Library
ATL P1000 Series Library Unpacking Instructions
Document 6221100-02, Ver. 2, Rel. 0
March 1999
Figure 6 Unloading Space Requirements, Stand­alone Library

Unloading Space Requirements

Before uncrating the library, verify that you have sufficient space. For the stand-alone unit, allow a minimum of six feet in front of the ramp side of the pallet (see figure 6).
Note: Unpack the library as close to the installation site as possible.
Library
Pallet
5
Unloading area
(minimum)
18 in. (46 cm)
Pallet ramp
30 in. (76 cm)
33 in. (84 cm)
97 in. (2.5 m)
Unloading Space Requirements 9
ATL P1000 Series Library Unpacking Instructions Document 6221100-02, Ver. 2, Rel. 0 March 1999

Uncrating the Library

To uncrate the P1000 library:
Procedure
1
Open the top of the shipping carton by carefully cutting the packaging tape.
The following items are stacked on top of the P1000:
accessories tray ramp (stand-alone library) or slide assembly (rack-mount
library)
2
Remove these items from the carton and set them aside.
3
Remove all foam supports from inside the carton (see figure 7 on page 11 and figure 8 on page 12).
6
10 Uncrating the Library
Loading...
+ 22 hidden pages