Quantum LTO 2U, 2U Installation Manual

Page 1
Quantum 2U Rackmount
Rail Installation Guide
Introduction 3
Required Tools 3
Step 1: Installing the Chassis Sections onto the 2U Rackmount Chassis 4
Step 2: Installing the Stationary Sections onto the Equipment Rack 5
Step 3: Installing the 2U Rackmount into the Equipment Rack 7
Document 81-81209-06 A01, January 2006 1
Page 2
Quantum 2U Rackmount Rail Installation Guide Document 81-81209-06 A01 January 2006
Made in the USA. Quantum Corporation provides this publicati o n “as is” without warra nty of any kind, eithe r expres s or implied , including but not
limited to the implied warranties of merchantability or fitness for a particular purpose. Quantum Corporation may revise this publication from time to time without notice.
© Copyright 2006 by Quantum Corporation. All rights reserved. Your right to copy this document is limited by copyright law. Makin g copies o r adapt atio n s with out prior wr itten authorization of
Quantum Corporation is prohibited by law and constitutes a p u nishable violatio n of the law.
Quantum, DLT, DLTtape, the Quantum logo, and the DLTtape logo are all registered trademarks of Quantum Corporation. SDLT and Super DLTt ape are trad e marks of Quan t u m Co rporation.
Other trademarks may be mentioned herein which belong to other companies.
2
COPYRIGHT STATEMENT
TRADEMARK STATEMENT
Page 3
Quantum 2U Rackmount Rail Installation Guide
Document 81-81209-06 A01
January 2006
Introduction 0
The Quantum Rack Mount Slide Kit is designed to facilitate the mounting of 2U Rackmount systems in standard EIA-310 equipment racks. These telescoping slide rails provide easy access to the 2U Rackmount by allowing you to unlock and slide it forward.
Installing the slide rails involves the following steps:
Step 1: Installing the Chassis Sections onto the 2U Rackmou nt Chassis page 4
Step 2: Installing the Stationary Se ction s onto the Equi pment Rack page 5
Step 3: Installing the 2U Rackmoun t into the Equipm ent Rack
Warning: For maximum stability, the equipment rack should be securely
bolted to the floor per the rack manufacturer’s recommendations.
After installing components in the equipment rack, do not pull out more than one compon e nt on its slide rails at a time. If the equipment rack is not securely bolted to the floor, the weight of more than one extended component could cause the equipment rack to become unstable, tip over, and cause dama ge , se rious b odily inj u ry, or deat h .
on page 7
on
on
Required Tools 0
To install the slide rails, you may need the following additional items:
Available rack space in a suitable equipment rack
#1 or #2 PHILLIPS® screwdriver
3
Page 4
Quantum 2U Rackmount Rail Installation Guide Document 81-81209-06 A01 January 2006
Step 1: Installing the Chassis Sections onto the 2U Rackmount Chassis
1 For each set of rails, pull the chassis section forward until it locks into the
intermediate section. Press the green lock release toward the front to release the chassis section, and remove the chassis section. See figu r e 1
Figure 1 Removing the Chassis Section
2 Install the chassis sections onto the 2U Rackmount chassis using
(6) M3 x 4 mm pan-head PHILLIPS screws. See figure 2
Stationary
section
0
.
Chassis section
Lock release
Intermediate
section
.
Figure 2 Installing the Chassis Sections Onto the Chassis
4
Page 5
Quantum 2U Rackmount Rail Installation Guide
Document 81-81209-06 A01
January 2006
Step 2: Installing the Stationary Sections onto the Equipment Rack
Figure 3 Sliding the Intermediate Section
1 Slide the intermediate sections all the way back into the stationary
sections. If the intermediate section locks, push down on the green release button to release. See figure 3
Green release button
Intermediate section
.
Stationary section
2 Loosely install the left and right stationary sections ont o the equipment
rack using (8) M6 pan-head PHILLIPS screws. The ends of the stationary sections go on outside of the equipment rack’s upright rails. See fi gure 4
0
.
Note: The stationary sections are marked LEFT and RIGHT. Be sure
to install the sections on the correct sides.
3 Secur e ly tig hten th e ba ck b racket screws on t o the equip m e n t ra ck ’ s
upright rails.
Note: Do not fully tighten the front bracket screws yet – you will do
this later.
5
Page 6
Quantum 2U Rackmount Rail Installation Guide Document 81-81209-06 A01 January 2006
Figure 4 Mounting the Stationary Sections Into the Equipment Rack
Upright rails (right side)
Upright rails (left side)
6
Page 7
Quantum 2U Rackmount Rail Installation Guide
Document 81-81209-06 A01
January 2006
Step 3: Installing the 2U Rackmount into the Equipment Rack 0
1 Completely exten d th e intermedi a te sections out fro m the front of the
stationary sections until they lock.
2 Holding the 2U Rackmount securely, slide the chassis sections through
the plastic lead-in guides at the front of the in termediate se ctions and into the intermediate sections.
3 Make sure that the chassis se ctions are both fully en gaged with the ball
bearings in the tracks of the intermediate sections.
4 Slide the 2U Rackmount all the way into the equipment rack. 5 Completely open and close the slides twice, making sure the chassis
sections engage in the stationar y sections properly and the locks f unction properly.
6 Slide the 2U Rackmount out slightly and securely tighten the front
bracket screws onto the equipment rack’s upright rails.
Figure 5 Tightening the Thumbscrew
7 Completely open and close the slides once more to make sure the unit
does not bind.
8 Slide the 2U Rackmount all the way into the rack and secure it in place by
tightening the thumbscrews on each side. See figure 5
.
7
Page 8
Quantum 2U Rackmount Rail Installation Guide Document 81-81209-06 A01 January 2006
8
*81-81209-06 A01*
81-81209-06 A01
Loading...