Unpacking the Library................................................................ ......... .........6
Before You Begin.....................................................................................6
Uncrating the Rack-Mount Kit..............................................................6
Installing the Rack-Mount Kit...............................................................6
Uncrating the Library.............................................................................7
1
ATL PowerStor L200 Series Library Unpacking Instructions
Document 6322502-01, Ver. 1, Rel. 0
February 1999
2
ATL PowerStor L200 Series Library Unpacking Instructions
Document 6322502-01, Ver. 1 Rel. 0
February 1999
0
0
Purpose
Figure 1 ATL PowerStor
L200 Series Library
Introduction
0
The ATL PowerStor L200 Series is an automated storage and retrieval
library system consisting of one DLT
TM
tape drive and eight DLTtape
0
cartridges (see figure 1).
This document explains how to unpack the L200 Series library
properly. Once the library is unpacked and moved to the desired
installation location, set up the library using the instructions in the
ATL Powerstor L200 Series Library User’s Guide
.
Library Configurations
1
The L200 Series is shipped in two configurations:
•
desktop configuration
•
rack-mount configuration
Introduction3
ATL PowerStor L200 Series Library Unpacking Instructions
Document 6322502-01, Ver. 1 Rel. 0
February 1999
Floor Space
Figure 2 Floor Space
Requirements
Selecting an Installation Location
1
When selecting an installation location for the library, consider the
following:
•
floor space
•
overhead clearance
•
installat ion surface strength and inclination
•
power and grounding
•
environmental specifications
1
Figure 2 shows the floor space requirements for setting up and
operating the desktop and rack-mount library.
Desktop
8.9 inches
(22.5 cm)
Back
Overhead Clearance
22.8 inches
(57.8 cm)
Front
Rackmount
8.6 inches
(21.9 cm)
The width of the desktop library is 8.9 inches (22.5 cm). The width of
the rack-mount library is 8.6 inches (21.9 cm). The depth of both
library versions is 22.8 inches (57.8 cm).
2
The height of the stand-alone library is 7.6 inches (19.4 cm). The height
of the rack-mount library is 6.9 inches (17.5 cm).
To remove and replace the library enclosure, you need an overhead
clearance slightly greater than the height of the library.
4Selecting an Installation Location
ATL PowerStor L200 Series Library Unpacking Instructions
Document 6322502-01, Ver. 1 Rel. 0
February 1999
0
0
Surface Strength and
Inclination
Power and Grounding
Environmental
Specifications
Place the library and rack on a c lean, lev el surface. If the library will be
2
placed on a desk or table, ma ke sure it is sturdy enough to s upport the
library’s weight (37 lbs/16.8 kg).
2
The electrical ratings for the library are 100 to 120/200 to 240 VAC, 50/
60 Hertz.
The installation location should meet the following environmental
2
specifications.
•
Temperature: 50
•
Relative humidity: 20% to 80% noncondensing
•
Humidity gradient: 10% per hour
•
Dry bulb temperature: 50
•
Wet bulb temperature: 77
•
Temperature gradient: 19.8
°
F to 104°F (10°C to 40°C)
°
F to 104°F (10°C to 40°C)
°
F (25°C)
°
F per hour (11°C per hour) across the
range
•
Temperature shock : 18
•
Altitude: -500 feet to 30,000 feet (-152.4 meters to 9144 meters)
°
F (10°C) over two minutes
Selecting an Installation Locat ion5
ATL PowerStor L200 Series Library Unpacking Instructions
Document 6322502-01, Ver. 1 Rel. 0
February 1999
Unpacking the Library
Unpack the library as close to the installation location as possible.
The unpacking instructions vary depending upon whether you
received a desktop or rack-mount library. If you received a desktop
library, you should have only one shipping carton. Follow the
instructions in “Uncrating the Library” on page 7 to unpack the
library.
If you received the rack-mount library, you will have two shipping
cartons. The large carton contains the library, and the smaller carton
contains the rack-mount kit.
To unpack and install the rack-mount library, you must:
•
Uncrate the rack-mount kit and verify its contents (see “Uncrating
the Rack-Mount Kit”).
•
Install the rack-mount kit in the rack (see “Installing the
Rack-Mount Kit”).
•
Uncrate the library and place it in the rack (see “Uncrating the
Library”).
2
Before You Begin
Uncrating the
Rack-Mount Kit
Installing the
Rack-Mount Kit
2
Inspect the shipping pallet and carton for damage that may have
occurred during shipment. Report any damage to the shipper
immediately.
Cut the packing tape at the top of the shipping carton and unpack the
2
rack-mount kit. Before installing the rack-mount kit in the rack,
compare the contents of the carton with the packing list inside the
shipping carton.
Install the rack-mount kit in the rack, referring to the drawing
2
provided in the shipping carton.
6Unpacking the Library
ATL PowerStor L200 Series Library Unpacking Instructions
Document 6322502-01, Ver. 1 Rel. 0
February 1999
0
0
Uncrating the Library
Figure 3 Removing the
Shipping Carton from the
Pallet
2
To uncrate an ATL PowerStor L200 Series library:
Procedure
1
Cut the straps that secure the shipping carton to the pallet (see
figure 3).
2
Lift the carton off of the pallet.
Caution:
The library weighs 37 lbs (16.8 kg). Two people should
perform any procedure that involves lifting or moving the
library.
3
Open the top of the shipping carton by carefully cutting the
packing tape.
Straps
Packing tape
4
Remove the accessory kit from the carton (see figure 4).
Shipping carton
Pallet
Unpacking the Library7
ATL PowerStor L200 Series Library Unpacking Instructions
Document 6322502-01, Ver. 1 Rel. 0
February 1999
Figure 4 Removing the
Accessories Boxes
Accessory kit
Procedure (continued)
5
Remove the packing foam from the top of the library (see figure 5).
6
With two people lifting the library, remove it from the shipping
carton.
7
Remove the library from the shipping bag.
8
Place the library in the installation location. If it is a rack-mount
library, place it in the rack.
8Unpacking the Library
Figure 5 Removing the
Library from the Shipping
Carton
ATL PowerStor L200 Series Library Unpacking Instructions
Document 6322502-01, Ver. 1 Rel. 0
February 1999
Packing foam
Library
Shipping bag
0
0
The library is now unpacked. Refer to the
Library User’s Gui de
for information about connecting the library cables
and operating the library.
Unpacking the Library9
ATL PowerStor L200 Series
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.