Quantum DX5000, DX3000 Quick Start Guide

DX3000 and DX5000
Quick Start Guide
TABLE OF CONTENTS
Introduction .......................................1
Notational Conventions .................1
Choosing a Location ..........................2
Rack Space Requirements...............2
Environmental Conditions .............2
Providing Necessary Tools..............2
Taking ESD Precautions ..................2
Unpacking the DX3000/DX5000.........2
Installing the DX3000/DX5000 System3
Locating the Mounting Position ....3
Installing the DX3000/DX5000
Chassis ............................................. 4
Cabling the DX3000/DX5000..............7
Cabling a DX3000 System...............7
Cabling a DX5000 System...............8
Initial Configuration .......................... 8

Introduction 0

This quick start guides provides basic installation and configuration instructions for both the DX3000 and DX5000 systems (see figure 1). For more information, see
Quantum DX3000 and DX5000 User’s Guide
the provided with your DX3000 or DX5000 system.

Notational Conventions 0

This instruction uses the following conventions:
NOTE: Notes emphasize important information related to the main topic.
AUTION: Cautions indicate potential hazards to equipment and are included
C
to prevent damage to equipment.
ARNING: Warnings indicate potential hazards to personal safety and are
W
included to prevent injury.
on the documentation CD
Figure 1 PX3000 and DX5000
DX3000 and DX5000 Quick Start Guide

Choosing a Location 0

The DX3000/DX5000 must be installed in a restricted access location per specification EN69050-1. This system must only be installed by qualified IT service personnel. This is required to prevent untrained personnel from allowing body parts or electrically conductive items to penetrate into the interior of the system when replacing or installing drives, fans, and power supplies.
When choosing an installation site for the DX3000/DX5000 system, consider the following requirements:

Rack Space Requirements

Environmental Conditions

Rack Space Requirements 0
Ta b l e 1 contains the rack requirements for both the DX3000
and DX5000.
Table 1 Rack Requirements
DX3000 DX5000
Depth 27 in (68.6 cm) 25.4 in (64.5 cm)
Width 19 in (48.3 cm) 19 in (48.3 cm)
Height 3.5 in (8.9 cm),
2U
Weight 50 lbs (22.68 kg) 122 (55.34 kg)
Air Clearance
Environmental Conditions 0
Open 4 in (10.2 cm) behind unit for proper
8.75 (22.2 cm), 5U
air flow

Preparing for the Installation 0

Before you begin the installation procedure in this section, make the following preparations as described in this section:
Providing Necessary Tools

Taking ESD Precautions

Providing Necessary Tools 0

Provide the following tools for unpacking and installing the DX3000 and DX5000 systems:
#1 PHILLIPS® screwdriver
#2 PHILLIPS screwdriver
#1 Flat head screwdriver
Antistatic wrist strap included in accessory kit
Tak i n g E S D P r e c a u t i o n s 0
Some components within the DX3000 and DX5000 systems contain static-sensitive parts. To avoid damaging these parts while performing installation procedures, always observe the following precautions:
Keep the DX3000/DX5000 system turned off during all installation procedures.
Use an antistatic wrist strap (included in the accessory kit).
Keep static-sensitive parts in their original shipping containers until ready for installation.
Do not place static-sensitive parts on a metal surface. Place them inside their protective shipping bag or on an antistatic mat.
Avoid touching connectors and other components.
The installation site must have the following environmental conditions:
Humidity: 20%-80% non-condensing
Temperature: 10°C-35°C (50°F-95°F)
Altitude: 0 to 10,000 feet (0 to 3048 meters)
These environmental conditions apply when the DX-Series system is in operation.
OTE: For additional specifications, refer to the
N
Quantum DX3000 and DX5000 User’s Guide
81-81493)
(PN
NOTE: Dry climates and cold-weather heating
environments have lower relative humidity and are more likely to produce static electricity.

Unpacking the DX3000/DX5000 0

This section explains how to unpack both the DX3000 and DX5000 system components and move them to their final installation location.
By following these instructions, you help ensure that the system will continue to be safeguarded after it arrives at the installation site.
2
DX3000 and DX5000 Quick Start Guide
Unpack and remove the following components from the packing materials (see figure 2
and figure 3):
DX3000 or DX5000 chassis
Hard drive sleds
Accessory kit
W
ARNING: The DX3000 weighs 38 lbs (17.24 kg) and
the DX5000 weights 85 lbs (38.56 kg) without hard drives. Two people are required to lift either unit.
Figure 2 Unpacking the DX3000
Foam
DX3000 chassis Lift point
Figure 3 Unpacking the DX5000
Foam
Antistatic bag
Hard drive sleds
Accessory kit
Foam
Lift point
DX5000 chassis
Foam
Antistatic bag
Hard drive sleds
Rail kit
Foam
Foam
Cables
Quick start
Foam

Installing the DX3000/DX5000 System

Installing the DX3000/5000 in a rack consists of the following steps:
Locating the Mounting Position
Installing the DX3000/DX5000 Chassis

Locating the Mounting Position

Both the DX3000 and DX5000 systems are designed to fit in a standard 19 inch wide rack. It is important to the chassis installation to locate the hole pattern in the rack rails (see
figure 4
).
0
0
3
DX3000 and DX5000 Quick Start Guide
Figure 4 Rail Hole Pattern
5U
7U of rack space
2U
1 DX5000 System (5U)
1 DX3000 System (2U)
The marks above (X) indicate the location of mounting hardware on the rack rails. Ensure that any necessary mounting hardware is installed on the rack rails prior to installing the chassis.
1U = 1.75 in (44.45mm)
1U = 1.75 in (44.45mm)
Hole pattern
Top of rack
.312 in (7.92 mm) .625 in (15.9 mm) .625 in (15.9 mm)
.5 in (12.7 mm) .625 in (15.9 mm) .625 in (15.9 mm)
.5 in (12.7 mm)

Installing the DX3000/ DX5000 Chassis 0

1 Assemble the DX3000/DX5000 support brackets
figure 5
:
For the DX5000 - The DX5000 rails are preset for
easy installation. Loosen the two nuts securing the back portion of the rail so the rail can adjust to the depth of the rack.
For the DX3000 - The DX3000 rails are preset for
28 in (71.1cm). Loosen the nuts to adjust the rails to the depth of the rack.
OTE: Two sizes of support brackets are included
N
with the DX3000 rails to support various rack depths. Measure the depth of the rack to determine the depth. The short brackets (5 in., 12.7cm) are used for rack depths of 28 to 31 in (71.1 to 78.7 cm). The long brackets (10 in., 25.4 cm) are used for rack depths of 32 to 36 in (81.3 to 91.4 cm). Use the appropriate support bracket for your rack.
ARNING: If the rack is empty at the time of
W
installation, do NOT install the DX3000 or DX5000 chassis too high in the rack. The weight of the chassis may cause the rack to become “top heavy” and unstable if installed in the top of an empty rack.
OTE: Quantum ships sufficient clip nuts to support
N
mounting the DX3000/DX5000 rack rails and also to secure the front of the chassis to the rails.
Clip nut
4
DX3000 and DX5000 Quick Start Guide
t
Figure 5 Assembling the Rack Rails
D
X
5
0
0
0
DX5000: Adjustment
screws; adjusts to the depth of your rack
DX3000: Bracket (short brackets pre installed)
D
X
3
DX5000: Front mounting
bracket preset. Ensure the screws are in the correct position.
r
a
c
k
r
a
i
l
s
0
0
0
r
a
c
k
r
a
i
l
s
DX5000 - Two 10-32 x .50 in. PHILLIPS screws on
each rail at the front and back of the rack for the DX5000.
OTE: Ensure that clip nuts are installed on the rails (see
N
figure 4
) prior to installing the DX5000 rails.
Figure 6 Installing the Chassis Support Brackets (DX3000 and DX5000)
10-32 x .50 PHILLIPS screws
DX5000 support brackets
Clip nuts
DX3000: The brackets are secured with four #8 PHILLIPS screws and four nuts.
2 Install the left and right chassis support brackets at the
beginning of a hole pattern (see Locating the Mounting
Position) and secure as follows (see figure 6):
NOTE: The support brackets extend to accommodate
rack depths or 30 to 36 in. (76.2 to 91.4 cm).
DX3000 - One 10-32 x .50 in. Slotted screw with
and a three hole nut plate on each rail at the front and back of the rack. 10-32 x .50 in. PHILLIPS screws and nuts are also provided for racks with threaded holes.
NOTE: The DX3000 support brackets must be installed
on the inside rack rails.
Three hole nu DX3000 support brackets
10-32 x .50 slotted screw
plate, use
bottom hole
3 Once the rails are secured to the rack, tighten the rail
adjustment nuts on each rail.
4 With the support brackets installed, prepare the chassis
mounting holes if necessary (see figure 7
for hole location). These are the holes used to secure the chassis to the rack.
5
DX3000 and DX5000 Quick Start Guide
t
Figure 7 DX3000/DX5000 Chassis Mounting Holes
Chassis mounting holes
Chassis mounting holes
Figure 8 Securing the DX3000/ DX5000 Chassis to the Rack
DX5000 chassis
t
ke
ac
r
b
t
r
o
p
p
u
s
0
00
5
X
D
e
k
c
a
r
b
t
r
o
p
p
u
s
0
0
DX
0
3
DX3000 chassis
5 Carefully slide the chassis into the rack.
ARNING: The DX3000 weighs 38 lbs (17.24 kg)
W
and the DX5000 weights 85 lbs (38.56 kg) without hard drives. Two people are required to lift either unit.
6 Secure the DX3000/DX5000 chassis to the rack with the
following hardware (see figure 8):
DX3000 - two 10-32 x 1.25 in. (M5 x 32 metric also
provided) black PHILLIPS screws on each side of the front of the chassis. Tighten to 5 in/lbs.
DX5000 - two 10-32 x 1.25 in. (M5 x 32 metric also
provided) black PHILLIPS screws on each side of the front of the chassis.
10-32 in. (M5) screws
Clip nuts, installed in step 4
7 Install each of the hard drive sleds into the DX-Series
storage array chassis. Ensure each drive is completely installed in the chassis with the drive handle in the closed position (see figure 9
for DX3000 and figure 10
for DX5000).
C
AUTION: Use ESD procedures when handling the hard
drives sleds (see “Taking ESD Precautions” on page 2). Place the ESD wrist strap on your wrist and connect the other end of the strap to the DX3000/DX5000 chassis.
6
DX3000 and DX5000 Quick Start Guide
OTE: The hard drives must be installed in the
N
proper sequence since RAID sets have already been established at the factory. Refer to the label on the bottom of the drive sled for the drive number. The hard drive numbering starts in the lower left-hand drive bay and then moves to the right.
Drive 4 Drive 5 Drive 6 Drive 7
DX3000
Array controller 2
Array controller 1
DX5000
Drive 0 Drive 1 Drive 2 Drive 3
Drive 8 Drive 9 Drive 10 Drive 11 Drive 4 Drive 5 Drive 6 Drive 7
Drive 0 Drive 1 Drive 2 Drive 3 Drive 8 Drive 9 Drive 10 Drive 11
Drive 4 Drive 5 Drive 6 Drive 7 Drive 0 Drive 1 Drive 2 Drive 3
Figure 9 Installing the Disk Drives in the DX3000 Chassis
Figure 10 Installing the Disk Drives in the DX5000 Chassis
Array controller 2
D
r
i
v
e
Array controller 1
0
D
r
i
v
e
0
D
r
i
v
e
1
1
D
r
i
v
e
1
1
The DX3000/DX5000 chassis is now installed in the rack.
D
r
i
v
e
4
D
r
i
v
e
D
r
i
v
e
0
5
D
r
i
v
e
6
D
r
i
v
e
1
D
r
i
v
e
7

Cabling the DX3000/DX5000 0

The cabling instructions differ depending on the system installed. Refer to the following sections for either the DX3000 or DX5000 system:
Cabling a DX3000 System
Cabling a DX5000 System

Cabling a DX3000 System 0

Connect the following cables to the back of the DX3000 system (see figure 11
):
Connect a power cable to each power supply
Connect an Ethernet cable to port ETH1
Fibre Channel cable (optional)
7
DX3000 and DX5000 Quick Start Guide
$8
1UANTUM
(

03 34!453
Figure 11 DX3000 System Cabling
Fibre Channel ports (optional Optyon™ card)
12
Power supply cables
Ethernet ports

Cabling a DX5000 System 0

Connect the following cables to the back of the DX5000 system (see figure 12
):
Connect a power cable to each power supply
Connect an Ethernet cable to port ETH1(left-hand port)
Fibre Channel cable (optional)
Figure 12 DX5000 System Cabling
Configuring the DX3000/DX5000 consists of the following major steps:
Accept the License Agreement
Complete the User Registration
Complete the Network Configuration
Select a RAID Configuration
Create Cartridges on the DX3000/DX5000
To configure the DX3000/DX5000:
1 Turn on the D3000/DX5000 system by pressing the
power button located on the front of the chassis (see
figure 13
).
Figure 13 Power Buttons
Power button
Ethernet ports Fibre Channel ports (optional
Optyon™ cards)
12
Power supply cables

Initial Configuration 0

Before the DX3000/DX5000 is operational, you must configure the system by completing the remote management setup screens.
Power button
2 On a computer on the same subnet as the DX3000/
DX5000, enter the IP address of the system in the Address field of a web browser.
N
OTE: The default IP address is: 10.1.1.1 for port 1
and 10.0.1.0 for port 2.
The Log In screen displays (see figure 14
).
8
DX3000 and DX5000 Quick Start Guide
Figure 14 Log In Screen
3 Select Administrator and enter password for the
password.
The License Agreement screen displays (see figure 15).
Figure 15 License Agreement
Figure 16 User Registration
5 The registration information is sent to Quantum to
allow the system to be easily serviced and maintained. If you do not want to register on-line, press Skip, then fill out and mail the warranty card included in the DX3000/DX5000 accessory kit. When finished, click Continue to continue.
The Network Configuration screen displays (see
figure 17
).
4 Read the license agreement and press I Accept to
continue.
OTE: If you do not accept the license agreement,
N
the DX3000/DX5000 will not function.
The User Registration screen displays (see figure 16
Figure 17 Network Configuration
).
9
DX3000 and DX5000 Quick Start Guide
6 Enter the network configuration information for both
Ethernet ports (if used) and the host and domain information in the General Section. When finished click Next to continue.
OTE: When DHCP is disabled, the default IP
N
address for port 1 is 10.1.1.1 with a netmask of 255.255.255.0. The default IP address for port 2 is 10.0.1.0 with a netmask of
255.255.0.0.
OTE: Refer to the
N
User’s Guide
Quantum DX3000 and DX5000
(PN 81-81493)for additional
network configuration information.
The RAID Selection screen displays (see figure 18
).
Figure 18 RAID Selection (DX5000 with Twelve Drives)
DX5000 users can disable the hot spare option(s) to maximize storage capacity. This process takes approximately 4 hours to complete. Click Next to continue. During this initialization period, the system is available, but only in a degraded (slower) mode.
The Media Areas Configuration screen displays (see
figure 19
).
Figure 19 Media Areas Configuration
7 The DX3000/DX5000 systems ship from Quantum in the
following default RAID5 configurations:
DX3000 - One logical drive with either four or
eight hard drives.
DX5000 (twelve hard drives) - Two logical drives:
The first logical drive contains six hard drives. The second logical drive contains five hard drives. The last hard drive is reserved as a hot spare.
DX5000 (twenty-four drives) - Four logical drives:
First the third logical drives contain six hard drives. Second and fourth logical drives contain 5 hard drives. Two hard drives are reserved as hot spares. have two hard drives reserved as hot spares.
The Media Areas Configuration screen allows you to specify how much storage space is dedicated to either virtual tape cartridges or virtual disks.
8 If you would like tape cartridges to be available on one
or more volumes, change the number in the Ta pe Cartridge Area (GB) from a minimum of 5 GB to the total capacity of the volume. 5 GB is the smallest size available to tape cartridges.
9 If you would like virtual disks to be available on one or
more volumes, change the number in Virtual Disk Area (GB) from a minimum of 1 GB to the total capacity of the volume.
10 Click Next. to continue
The Cartridge Creation screen displays (see figure 20
).
10
DX3000 and DX5000 Quick Start Guide
Figure 20 Cartridge Creation (DX5000 with Twelve Drives)
11 Select the volume(s), either All Volumes or Volume
Name, where the tape cartridges will be created.
12 Create cartridges by either quantity or capacity:
If you select By quantity , you can create between 1
and 400 cartridges per LUN. The capacity decreases the more tape cartridges you create.
14 Click Next.
The Finish System Setup screen displays.
15 Click OK to apply your settings.
The DX3000/DX5000 is configured and ready for operation. Refer to the
User’s Guide
(PN 81-81493)for additional information.
Quantum DX3000 and DX5000
NOTE: The maximum number of cartridges depends
on the size of the volumes created in the Media Areas Configuration section.
If you select By capacity, you choose between 5
GB and the maximum capacity of the logical drive per cartridge. The number of cartridges decreases with higher capacity per cartridge.
13 Enter the starting cartridge barcode.
N
OTE: The barcode format must be AANNNN, where
A is any uppercase alpha-numeric character and N is any single digit (0-9). Barcodes automatically increment.
United States of America Quantum Corporation 141 Innovation Drive Irvine, CA 92612 U.S.A. phone 949.856.7800 fax 949.856.7799
©2006 Quantum Corporation. Quantum, the Quantum logo, and the DLTtape logo are all registered trademarks of Quantum Corporation. SDLT and Super DLTtape are trademarks of Quantum Corporation. Other trademarks may be mentioned herein which belong to other companies.
European Headquarters Quantum Corporation 3 Bracknell Beeches Old Bracknell Lane West Bracknell Berkshire RG12 7BW United Kingdom phone +44 1344 353500 fax +44 1344 353510
Asia Pacific Quantum Corporation 9 Temasek Boulevard, #08-03 Suntec Tower Two Singapore 038989 Tel: +65 6334 0660 Fax: +65 6432 2830 Email: singapore.sales@quantum.com
81-81492-04 A01 June 2006
Loading...