Quantum 1U Rackmount Installation Guide

Quantum 1U Rackmount
Rail Installation Guide
Introduction 3
Required Tools 3
Step 1: Installing the Chassis Sections onto the 1U Rackmount 4
Step 2: Installing the Stationary Sections onto the Equipment Rack 5
For 24-I nch Rack s . .......... ............................... ......................... ............................... .....5
For Racks Deeper than 24 Inches.............................................................................7
Step 3: Installing the 1U Rackmount into the Equipment Rack 9
Typical Rack and Slide Configurations (For Reference Only) 11
Document 81-81209-05 A01, January 2006 1
Made in the USA. Quantum Corporation provides this publicati o n “as is” without warra nty of any kind, eithe r expres s or implied , including but not
limited to the implied warranties of merchantability or fitness for a particular purpose. Quantum Corporation may revise this publication from time to time without notice.
COPYRIGHT STATEMENT
© Copyright 2006 by Quantum Corporation. All rights reserved. Your right to copy this document is limited by copyright law. Makin g copies o r adapt atio n s with out prior wr itten authorization of
Quantum Corporation is prohibited by law and constitutes a p u nishable violatio n of the law.
TRADEMARK STATEMENT
Quantum, DLT, DLTtape, the Quantum logo, and the DLTtape logo are all registered trademarks of Quantum Corporation. SDLT and Super DLTt ape are trad e marks of Quan t u m Co rporation.
Other trademarks may be mentioned herein which belong to other companies.
2
Quantum 1U Rackmount Rail Installation Guide
Document 81-81209-05 A01
January 2006

Introduction 0

The Quantum Rack Mount Slide Kit is designed to facilitate the mounting of 1U Rackmount systems in standard EIA-310 equipment racks. These telescoping slide rails provide easy access to the 1U Rackmount by allowing you to unlock and slide it forward.
Installing the slide rails involves the following steps:
Step 1: Installing the Chassis Sections onto the 1U Rackmount
Step 2: Installing the Stationary Se ction s onto the Equi pment Rack page 5
Step 3: Installing the 1U Rackmoun t into the Equipm ent Rack
Warning: For maximum stability, the equipment rack should be securely
bolted to the floor per the rack manufacturer’s recommendations.
After installing components in the equipment rack, do not pull out more than one compon e nt on its slide rails at a time. If the equipment rack is not securely bolted to the floor, the weight of more than one extended component could cause the equipment rack to become unstable, tip over, and cause dama ge , se rious b odily inj u ry, or deat h .
on page 4
on
on page 9

Required Tools 0

To install the slide rails, you may need the following additional items:
Available rack space in a suitable equipment rack
#2 PHILLIPS® screwdriver
3

Step 1: Installing the Chassis Sections onto the 1U Rackmount

Figure 1 Pressing the Release Button
There are two chas sis sec ti ons, one fo r eac h side of the 1U Rac kmoun t chas sis.
1 Pull the chassis section of the rail forward, past the mounting flange on
the front of the rail set (see figure 1
).
The intermediate section and the chassis section will lock in place when fully extended.
2 Press the release button to release the intermediate section and slide out
the chassis section (see figure 1
Stationary section
Release button
Intermediate section
).
Chassis section
0
Figure 2 Attaching the Chassis Section to the 1U Rackmount Chassis
3 Attach one chass is sec ti on to eac h si de of t he 1U Rac kmoun t chas sis usi ng
four screws per side (see figure 2
Screws
).
Front
4
Loading...