Qmark Ceiling Fan Accessories User Manual

®
ASSEMBLY INSTRUCTIONS & PARTS MANUAL
CEILING FAN GUARDS
MODELS: 2800-1 AND 2800-2
Description
The Leading Edge ceiling fan guards are designed to be used with Leading Edge Commercial/Industrial ceiling fans. This guard is strongly recommended for use on fans located in any area where there is a possibility of objects larger than 3” being thrown into the fan. This ceiling fan guard is suited for school gymnasiums, indoor arenas and other public areas. Each unit consists of 8 (eight) sections, guard, clamp, brace, and assembly hardware. The guard has a galvanized finish.
General Safety Information
NOTE: Ceiling fan guards to be used in conjunction with specified fan models only: 52” guard - 3620-1, 4820-1, and 62” guard - 5600-1LC, 5631-1R, 5610-1, 5600-1, 5601-1, 5600-7, 6000-1, 6001-1, 6010-1.
1. Care should be taken to ensure that power source to fan is locked off before guard is installed so that the fan creates no hazard to installer.
2. Make sure hanger hooks are mounted securely to structural ceiling members and must support 150 pound load limit.
3. Make sure guard is securely in place before placing fan into operation.
READ CAREFULLY BEFORE ATTEMPTING TO ASSEMBLE, INSTALL, OPERATE, OR MAINTAIN THE PRODUCT DESCRIBED. PROTECT YOURSELF AND OTHERS BY OBSERVING ALL SAFETY INFORMATION. FAILURE TO COMPLY WITH INSTRUCTIONS COULD RESULT IN PERSONAL INJURY AND/OR PROPERTY DAMAGE!
RETAIN INSTRUCTIONS FOR FUTURE REFERENCE.
Maintenance
WARNING: MAKE CERTAIN THAT THE POWER SOURCE IS DISCONNECTED BEFORE ATTEMPTING TO SERVICE OR DISASSEMBLE ANY COMPONENTS! IF THE POWER DISCONNECT IS OUT OF SIGHT, LOCK IT IN OPEN POSITION AND TAG TO PREVENT APPLICATION OF POWER.
CLEANING This fan guard may be wiped off with a damp cloth. If
already installed on ceiling fan, do not allow the fan motor to get wet. Do not use solvents or harsh detergents.
Figure 1
Dimensions
MODEL
NUMBER
DIMENSIONS
AB
2800-1
2800-2
62”
52” 10
3
/4”
10
3
/4”
Figure 2
A Marley Engineered Products Brand
1. Place three guard bottom sections on flat surface (floor) and connect together in 3/4circle using enclosed 11/8” bolts, washers, lockwashers and 5/16” nuts.
(See Figure 3)
Installation
3. With three sections assembled, place 1/2of guard clamp brace on top section and bolt to top of guard.
(See Figure 5)
Figure 3 - Assemble Bottom Section
Figure 5 - Assemble Clamp Brace
2. Place each of three guard top sections on top of matching bottom and bolt together using 11/8” and 1
1
/2” bolts, washers, lockwashers and 5/16” nuts. (At this time do not bolt the 2 top bolts closest to the center of the fan guard.) (See Figure 4)
Figure 4 - Assemble Top Section
Figure 6 - Install Guard to Fan
4. Insert completely assembled fan with blades attached into guard and attach steel brace to fan downrod, leaving
1
/2” between top of canopy and guard and at least 2” from bottow of motor. Attach second half of guard clamp to the fan downrod.
(See Figure 6)
LEAVE 1/2” OF SPACE BETWEEN TOP OF CANOPY AND GUARD AND AT LEAST 2” FROM BOTTOM OF MOTOR. MAKE SURE ALL HARDWARE IS SECURE TO PREVENT GUARD/CANOPY FROM TOUCHING.
IMPORTANT!
2
Loading...
+ 2 hidden pages