Psion HFT2G2X Users Manual

WORKABOUT PRO RFID MODULE HF-T2-G2-XMOD
EXPANSION MODULE INSTRUCTIONS
Important: All Approval and safety information is outlined in the ‘Workabout pro G2 Handheld-computer User Manual’ – part number 8100140A. This manual is available on our website www.psionteklogix.com through the Teknet extranet
Before installing a module in the WORKABOUT PRO G2, all power sources must be turned off.
Remove the batteries. If your unit is using AC power, disconnect it.
Slide the switch to position OFF to shut off internal battery power.
With the power shut down, you can install the RFID Module HF-T2-G2-XMOD.
Remove and discard the two screws on the bottom of the metal frame.
Put the RFID Coupler HF-T2-G2-XMOD in the same alignment of the expansion connector on the
WORKABOUT PRO. Apply slight pressure to snap the module into place on the hand-held.
August 29, 2007
DPD A00301 A10 Sheet 1 of 5
Use four new screws (M2 x 6 mm) provided to secure the module in place.
Remove and discard the two screws on the top of the metal frame.
Slide the RFID Antenna HF-A1-G2-XMOD under the metal frame (with the spiral pattern facing
up).
Connect the RFID Antenna HF-A1-G2-XMOD to the RFID Coupler HF-T2-G2-XMOD.
Use two new screws (M2 x 12mm) provided to secure the antenna on the metal frame.
Slide the switch to the position ON to turn power back on.
Replace the end-cap, back plate and batteries.
For detailed instructions, pleased refer to the WORKABOUT PRO Hand-Held Computer User Manual and to the RFID MODULE HF-T2-G2-XMOD User manual. These manuals are available on our website
www.psionteklogix.com
through the Teknet extranet
READING AREA:
This area depend of the TAG type, TAG packaging, configuration of the WORKABOUT PRO (scanner, Compact flash…), environment (metallic or not).
TAG
August 29, 2007
DPD A00301 A10 Sheet 2 of 5
Loading...
+ 3 hidden pages