Operation
2.1 Unpacking ang installation
Is recommended check the automatic load tray
before its installation. In case found any problem
please contact immediately to the distributor.
In every automatic load tray will receive a fuse
to be installed in the ambulance to protect
equipment as well as a battery master switch.
Make sure that the bed will arrive at full load
and 12V with an inferior voltage the system can
be blocked.
Set the automatic load tray on the fl oor of the
ambulance by 8 screws with a hardness less
than 10.9. Make sure that the fastening stress is
evenly distributed, recommended install a steel
plate on the underside of the fl oor area of at
least of 300*200*8.
For adjusting the height of the load set by the
two stops located at the bottom of the platform.
Ensure that the guide wheels of the stretcher are
placed at the end of the steel tray. Once they
graduate mechanical stops adjust the detector
in one of them for the proper functioning of the
system.
NOTE: not grade the bank at less than it could
cause serious damage to the stretcher.
8
Removal of the stretcher of the ambulance
. Toggle extraction and removing the platform
longitudinally
. Press the button to download (the fi rst pla-
tform tilts to the default position and then
draw the table).
Enter the stretcher in the ambulance
. Push the stretcher until the hooks hold it up
(the table begin to move into the platform and
placed in horizontal position).
. Toggle extraction and enter the platform longi-
tudinally.
or
. Toggle the load switch.
NOTE: while the table is rising push the relea-
se lever of the rear leg of the stretcher
because otherwise they can cause serious
damage.
2.5 Loading and unloading
2.1.1 Regulating of he height of load