Operating Instructions
Page - 7
• 8.0 Analog Input: ECON has 4 Analog Input
◦ Low Lube Oil Pressure Sensor
◦ High Water Temperature Sensor
◦ Low Fuel Level Sensor
◦ OIL Temperature (ECON-A-4C only )
• 9.0 Digital Output: ECON has 9 digital outputs :
• Programmable output
Three digital outputs can independently be configured for the any functions
from the list below.
◦ Unit Healthy ◦ Load Warning
◦ Fuel Pump ◦ Heater/Choke
◦ Pull Solenoid ◦ None
• Fixed output: The remaining 6 digital outputs are fixed:
◦ Charging Alt( Battery Voltage) ◦ Crank
◦ Solenoid ◦ Hooter
◦ Mains Contactor ◦ Generator Contactor
• 10.0 Modes of Operation
10.1 AMF Mode (ECON-A & ECON -A-4C)
• 10.1.1 Auto Mode
ECON monitors the Mains supply, if Mains supply varies beyond set limit of
under/over voltage or under/over frequency or voltage unbalance for more
than their individual programmed supervision time, ECON releases the MCB
contactor (to protect the contactor from failure because of low input voltage)
and attempts to starts the generator after the following conditions are meet:
1. If engine start delay is enabled than the engine will wait for the programmed
delay before cranking the engine
2. In case the mains voltage returns to normal before cranking the engine the
engine shall not be cranked.
Heater/Fuel Pump contact are switched on depending upon their settings.
Heater/choke/glow plug is first switched followed by fuel pump. Next ECON
cranks the engine. Crank command is withdrawn once the engine start which
is detected, either by LLOP pressure or by build-up of generator voltage, as
per the setting by the user. Max duration of crank command is user settable.
In case of non-start of the engine ECON re-cranks it till it starts or user
programmed crank attempts are exhausted. If generator fails to start after the
maximum programmed crank attempts, Fail to Start LED starts blinking,
indicating start failure and the hooter is switched on.
After successful start of the generator, it is allowed to warm up for a user
programmed time before the load is transferred to generator.
While the generator is running ECON monitors it for external fault (Digital