12-drawer Tall Queen
Assembly Instructions
DATE STAMP
CALL US FIRST
1-877-PREPAC1
1-877-773-7221
Mon - Fri 7am - 4pm PST
10am - 7pm EST
• For help with assembly
• If you have received a damaged or
defective part or are missing hardware.
We will process replacement parts
business days or less. Parts are shipped via
UPS Ground or mail.
in 2
Plat form Storage Bed
Model # BQ-6212
This product is shipped in
4 cartons
1 of 4
+
3 of 4
Make sure you have all cartons.
Sometimes cartons shipped on the same
day get separated and are delivered on
2 of 4
+
4 of 4
Before you call please:
1) Record the following information from the
shipping label on the outside of the box.
You will need it for warranty purposes:
• Ship To Name
• Sales Order Number
2) Note the
3) Review the contents of your shipment to
determine what you are missing. This unit
is shipped in 4 cartons. Make sure you
have received all cartons.
Online Option:
Fill out the Replacement Parts Order form in the Product
Support section of our website: www.prepacmfg.com
product model number.
Required Tools
Screwdrivers
Hammer
Phillips Head
Flat Head
Optional Tools
Using a power screwdriver
will speed up assembly.
Caution
Do not over tighten any screw.
The last few turns of each screw
should be done very slowly or by hand.
Prepac Manufacturing Ltd.
6705 Dennett Place
Delta, BC V4G 1N4
LB-0638
2012-06-20
Hardware Identification
Bed Hardware
Drawer Slide Screw
(162)
RM-0074
JRN Nut
(24)
RM-0312
Allen Key
RM-0313
(1)
JCB Connector (24)
RM-0310 bronze (cherry / espresso)
RM-0314 black
Machine Screw
Wing Nut (4)
RM-0322
Metal Brace - Left (2)
Metal Brace - Right (2)
(4)
RM-0321
BF-BRACE-L
BF-BRACE-R
T Spacer
(48)
RM-0628
Black #8 - 9/16"
Washerhead Screws (4)
RM-0521
Package will contain
more than required
Drawer Bottom
Stabilizer (12)
RM-0839
Drawer Slides for Bed
4 per drawer
#8 - 1½” Hi Lo Screws
(48)
RM-0504
1 LEFT Drawer Slide per Drawer (Total = 12)
1 RIGHT Drawer Slide per Drawer (Total = 12)
12mm Zinc Cam
(48)
RM-0715
LEFT Slide (12)
RIGHT Slide (12)
Drawer Hardware
34mm Black Twister Dowel
(48)
RM-0500
5 per drawer
¾” Nail
(60)
RM-0022
8 per drawer
Drawer Slide Screw
(96)
RM-0074
Page 2 of 20
STEP 1
Estimated Time: 10 minutes
Attach metal U-channels to each outer gable using drawer slide screws
Note: In the center of the U-channels there are two pairs of
holes. Each pair has a small and large hole. Make sure the
LARGE HOLE is positioned to the top of the outer gable.
Large
hole
TOP
TOP
TOP
BOTTOM
BOTTOM
STEP 2
Attach T spacers to outer gables with drawer slide screws.
Estimated Time: 15 minutes
Drawer Slide
Screw
Page 4 of 20
STEP 3
Estimated Time: 10 minutes
Attach drawer glides to T-spacers on
outer gables as shown in the photo
Position the Drawer Glides with:
A) The wheel at the finished side
B) The wheel on the unfinished bottom
Finished
Side
Bottom
Use 14th hole
Use 1st hole
Use 1st hole
Use 14th hole
Page 5 of 20
STEP 4
Insert JRN nuts into the holes on each end of the inner gables. The
holes are drilled through. You can insert them from either side.
Estimated Time: 5 minutes
B2
B2
Insert the nut as shown, so that
the hole lines up with the hole
on the edge of the gable.
Page 6 of 20